Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 117 of 140  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Monday, July 13, 2015, 11:31, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Module moved 

TM#1 has been moved back to the south west silo from the conditioning station.

Entry  Monday, July 27, 2015, 17:03, David Wang, Conditioning Station, Standard Operation, TM4, UCx 13, UCx13 and TM4 under vacuum at CS. 

I connected the CS  vacuum system  to TM4. The CS and TM4 turbo pumps are started. Everything is good so far. The HS line will be pressured with helium tomorrow for leak checking. The CS and TM4 will be vented with Argon on Wednesday morning as planned before moved to ITE.

Entry  Tuesday, July 28, 2015, 10:12, David Wang, Conditioning Station, Standard Operation, TM4, UCx 13, Helium pressure test on TM4 HS line at CS 

I did the helium pressure test on TM4 HS line at CS. Applied 70 psi helium  2 minutes. base leak rate0.0x E-9 atm.cc/sec.  No response during the test. No leak.

Entry  Tuesday, July 28, 2015, 14:31, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#13, Electrical Check TM4UC13IGLISelecchkCS.PDF

TM#4 with UC#13 electrical check at the conditioning station under vacuum. See attached PDF.

Entry  Wednesday, July 29, 2015, 06:24, David Wang, Conditioning Station, Standard Operation, TM4, UCx 13, Stopped the CS and TM4 pumps and vent with argon. 

Dan and I stopped the CS and TM4 pumps. We are venting the CS with argon for UCX13 target.

Entry  Thursday, August 13, 2015, 14:36, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Module moved 

TM#2 with the dummy target has been moved to the conditioning station.

Entry  Thursday, August 13, 2015, 17:17, David Wang, Conditioning Station, Repair, TM2, Dummy target, TM2 at CS 

TM2 has been moved to CS. All turbo-pumps have been started. The pumping down is good so far.  I connected the leak detector to service cap, and finished the leak check today.  The LD base LR:0.0Xe-9atm.cc/sec. 80psi helium were applied to coil1, coil 2. HS and window circuits, each for 2minutes. No any response has been found on LD. So all water lines are leak tight now. I also sprayed   helium to top service cap checking all air to   vacuum seals. They are all good either. But, The new installed PGN1 does not work. Other thing need to mention is The TP2 is running at 2.45A which is 1A higher comparing to TP1. It need to be monitored to see if we have to replace it or not. The high current cables and water lines will be connected tomorrow morning.

Entry  Friday, August 14, 2015, 10:00, David Wang, Conditioning Station, Repair, TM2, , Started CS water package for TM2  

I finished the rest TM2 connections to CS, and started CS cooling package. Everything works fine so far.

Entry  Monday, August 17, 2015, 10:44, Anders Mjos, Conditioning Station, Development, TM2, LP-FEBIAD Test Target (empty), Conditioning TM2 Source Tray with FEBIAD test target FirstBeamTM2SourceTray2015-08-17.pngTM2_Source_Tray_with_FEBIAD_test_target.docx

TGHT, TBHT, ANODE and COIL power tested (some amps/volts)

Monday, August 17, 2015, 10:43: BIAS/EL/EE to 15/7.5/1.5 kV

Monday, August 17, 2015, 10:45 : COIL 20A, ANODE 200V

Keiko fixed the auto-ramping program and access rights to it.

Monday, August 17, 2015, 13:06: Auto-ramping at 2/1 A/min. Good/bad vacuum at 6E-6 and 8E-6 T

Monday, August 17, 2015, 13:24 : ANODE current limit set incorrectly. Corrected and 200V (9 mA)

Monday, August 17, 2015, 15:28: COIL to 50 A

Monday, August 17, 2015, 15:43: Reduced ANODE to 100 V

Monday, August 17, 2015, 16:56 : Increased EL to 8.3 kV to increase FC current.

Monday, August 17, 2015, 17:04 : FC0 current at 1.5E-8 A

Beam ionized and accelerated on the new TM2 source tray

Monday, August 17, 2015, 17:12 : TGHT / TBHT at 500 / 250 A. Will leave over night to outgas. ISAC ops are monitoring the source.


Tuesday, August 18, 2015, 08:07: Everything stable overnight. Continue ramping heaters.

Tuesday, August 18, 2015, 08:48: TBHT voltage limited by EPICS (hardcoded) at 273 A.

TGHT/TBHT at 600 / 273 A 

Tuesday, August 18, 2015, 09:52: Adjusted COIL current down to 0 and back up. Response seen on FC0.

Tuesday, August 18, 2015, 22:29 : Starting cool down.


 Wednesday, August 19, 2015, 08:26: Source and HV off. EE configured to conditioning mode. RGA off.

Wednesday, August 19, 2015, 08:42: BIAS/EL at 15 / 7.5 kV. PNG1 at 3.5E-6 T, IG1 at 3.9E-7 T

Wednesday, August 19, 2015, 08:53: BIAS/EL 20 / 10 kV. 2 sparks.

Wednesday, August 19, 2015, 09:54: BIAS/EL 30 / 15 kV. Some sparking around 28 kV required BIAS voltage to be reduced momentarily. 

Wednesday, August 19, 2015, 10:04: Sparking at 30 kV. Reduced BIAS to 13 kV to get spar rate to less than 10/min

Wednesday, August 19, 2015, 10:19 : BIAS current limiting. Switch off BIAS and EL

Wednesday, August 19, 2015, 12:04: Water off for purging and leak test.

Wednesday, August 19, 2015, 12:52: Vacuum response observed while David was working on purging the water lines. This turned out to be when the valve to the leak detector was opened.

Entry  Wednesday, August 19, 2015, 14:52, David Wang, Conditioning Station, Repair, TM2, , TM2 at CS 

During the TM2 HV test at CS, It failed. In order to confirm there is no any water leak inside the module after the heaters and beam extraction test, I disconnected all the water lines on the TM2, and purged the water lines with pressure air. Leak detector was reconnected back to the TM2 service cap, and all water lines are pressurized with 80psi helium again each for 2 minutes.No any leak had been found during the test. All the water lines are still perfectly sealed. Also, I checked all the vacuum to air seals on the top of the module.They are good either.  Anders used the RGA  tracking the helium during the test. No leak.

Entry  Thursday, August 20, 2015, 09:38, David Wang, Conditioning Station, Repair, TM2, , TM2 was disconnected at CS 

TM2 was disconnected at CS. Travis and I did  electrical check before the venting. After,The module was vented and moved to SHC. The moving is smooth.

Entry  Thursday, August 20, 2015, 11:00, Travis Cave, Conditioning Station, Standard Operation, TM2, Dummy Target, Electrical Check TM2_elecchkdummytgtatCS.PDF

TM#2 electrical check at the conditioning station. All pumps were off but the module was not vented.

Entry  Thursday, August 20, 2015, 13:48, David Wang, Conditioning Station, Standard Operation, TM2, , Target Hall Scheduled Activities April 07 - Sep 08 2015 Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Sep_08.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Sep_08.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdf

 Weekly update target hall schedule.See attachment 1,2

Spring and summer run is close to the end. This will be the last update on this old schedule. See attachment3,4.    A new schedule for TH activities after mini shut down will be posted next time.

Entry  Wednesday, August 26, 2015, 09:54, Anders Mjos, Conditioning Station, Maintenance, , , Topped up water in TCS:TK2 

 Filled to 24.9 in

Entry  Wednesday, August 26, 2015, 11:12, Travis Cave, Conditioning Station, Standard Operation, TM2, ZrC #7, Module moved 

TM#2 with ZrC#7 has been moved to the conditioning station from the south hot cell.

Entry  Wednesday, August 26, 2015, 14:28, David Wang, Conditioning Station, Standard Operation, TM2, ZrC, Leak check on TM2 HS and windowwater line with new ZrC target at SHC 

Chad and I leak checked TM2 HS and window circuit VCR joints with ZrC target and containment box installed at SHC. No leak has been found. They will   be helium pressurized  at CS later.

Entry  Wednesday, August 26, 2015, 14:30, David Wang, Conditioning Station, Standard Operation, TM2, ZrC, TM2 and Cs vacuum sysyem has been connected at CS. 

Turbo-pumps are started . The pumping down is good so far.

Entry  Wednesday, August 26, 2015, 14:52, David Wang, Conditioning Station, Standard Operation, TM2, ZrC, Helium pressure test on TM2 HS and window lines at CS 

LD base LR 0.0xE-9 atm.cc/sec , 80 psi helium 2 minutes on HS and window circuits. No leak. Also, the reinstalled(after rewiring job) TP2 and PNG1(steers) side panel have been leak checked. No leak.

Entry  Thursday, August 27, 2015, 08:43, Travis Cave, Conditioning Station, Standard Operation, TM2, ZrC #7, Electrical Check TM2_elec_chk_ZrC7_CS.PDF

Electrical check of TM#2 at the conditioning station under vacuum. The resistance value of the target to 60kV common is a bit lower then what it was at the south hot cell.

Entry  Thursday, August 27, 2015, 10:10, Anders Mjos, Conditioning Station, Standard Operation, TM2, ZrC#7, Conditioning new Source Tray 2015-08-31_Service_Cap_Sparking_on_Rubber_Plug.pdfTM2_Source_Tray_with_ZrC#7.docxVacuum_gague_calibration.xlsx

Thursday, August 27, 2015, 10:10: Started water system. TK2 level reduced from 24.9 to 23.5 in. 

IG2 not working. Force is ON.


EE in conditioning mode.

 Friday, August 28, 2015, 08:39: BIAS/EL 10 / 5 kV

Friday, August 28, 2015, 08:49: BIAS/EL 20 / 10 kV

Friday, August 28, 2015, 09:18 BIAS OFF. Ramping to 200/100 A at 2/1 A/min

Friday, August 28, 2015, 15:46: Target at 76 / 38 A. Changed ramping to 100/40 at 1/0.5 A/min

Friday, August 28, 2015, 22:20: Ramping down heaters.


Saturday, August 29, 2015, 09:50: RGA off. PNG1 7.85E-6 / 5.0E-6 T (EPICS / local)

Saturday, August 29, 2015, 10:11: BIAS/EL 20 / 10 kV

Saturday, August 29, 2015, 10:28: BIAS/EL 30 / 15 kV. Some sparking around 29 kV

Saturday, August 29, 2015, 10:43: 10 min w/o sparking

Saturday, August 29, 2015, 10:55: BIAS/EL 32 / 15 kV. Small vacuum responses for every 100 V increase

Saturday, August 29, 2015, 11:03: Sparking at 33 kV

Saturday, August 29, 2015, 11:12: BIAS/EL 34 / 15 kV

Saturday, August 29, 2015, 14:22: Power has returned after site-wide power outage, but no communication with IOC yet.

Saturday, August 29, 2015, 15:13: IOC restarted.

Saturday, August 29, 2015, 15:14: Starting turbos

Saturday, August 29, 2015, 15:22: Turbos at speed.

Saturday, August 29, 2015, 15:22 : MP3 not running. Investigating

Saturday, August 29, 2015, 15:47: Reset MP3 breaker (wait 5 min for capacitors to empty)

Saturday, August 29, 2015, 15:48: Water system running


Sunday, August 30, 2015, 09:38: BIAS/EL 10 / 5 kV

Sunday, August 30, 2015, 09:54: BIAS/EL 20 / 10 kV 

Sunday, August 30, 2015, 10:01: BIAS/EL 30 / 15 kV 

Sunday, August 30, 2015, 10:12: No sparking

Sunday, August 30, 2015, 10:27: BIAS/EL 35 / 15 kV 

Sunday, August 30, 2015, 10:37: No sparking

 Sunday, August 30, 2015, 10:52:  BIAS/EL 37.5 / 15 kV 

Sunday, August 30, 2015, 11:00:  BIAS/EL 37.5 / 20 kV. No sparks

Sunday, August 30, 2015, 11:22:  BIAS/EL 40 / 20 kV 

Sunday, August 30, 2015, 11:34: No sparks

Sunday, August 30, 2015, 12:00: BIAS/EL 42 / 21 kV

Sunday, August 30, 2015, 12:32: Sparking at 43.5 kV. Tripped off PS on conductivity (spark response)

Sunday, August 30, 2015, 12:44:  BIAS/EL 40 / 20 kV. ISAC Ops will monitor over lunch

Sunday, August 30, 2015, 14:20: BIAS/EL 43 / 20 kV

Sunday, August 30, 2015, 14:41: Sparking at 43.5 kV. lowered to 43 kV

Sunday, August 30, 2015, 15:56: Sparking every 5-10 min at 43.4 kV not able to increase to 43.5 kV. Sparking is causing signal response on water conductivity and drop in IG1 and IG1S readings during sparking.


Monday, August 31, 2015, 08:33: BIAS/ EL to 40 / 20 kV in 9 min w/o any sparking

Monday, August 31, 2015, 08:44: No sparking

 Monday, August 31, 2015, 08:46: BIAS/ EL to 42 / 20 kV

Monday, August 31, 2015, 08:53: BIAS/EL 43 / 20 kV. Two vacuum/current responses

Monday, August 31, 2015, 09:47: BIAS off to investigate spakring.

David observed sparking coming from under the HV cover on TM2 twice. When the cover was removed, spark marks on a rubber plug for the water lines was observed. The plug with marks and one more plug was removed from the service cap as it is not used. See attached PDF.

Monday, August 31, 2015, 10:09: BIAS/ EL to 40 / 20 kV in 8 min w/o any sparking

Monday, August 31, 2015, 10:15 BIAS/EL 43.5 / 22 kV. One small spark

Monday, August 31, 2015, 10:30: No sparks

Monday, August 31, 2015, 10:35: BIAS/EL 44 / 22 kV.

Monday, August 31, 2015, 11:00: BIAS/EL 45 / 22 kV.

Monday, August 31, 2015, 11:31: PNG1 taken out by a spark

Monday, August 31, 2015, 12:04: Reset power to PNG1 controller. PNG1 back online.

Monday, August 31, 2015, 12:25: BIAS tripped on IG1 after a spark at 47.1 kV

Monday, August 31, 2015, 12:39: BIAS/EL 47 / 24 kV. No sparks for 5 min

Monday, August 31, 2015, 12:54: PNG1 taken out by spark at 47.7 kV

Monday, August 31, 2015, 13:02: BIAS/EL 48 / 24 kV

Monday, August 31, 2015, 13:07: No sparks

Monday, August 31, 2015, 13:25: BIAS/EL 49 / 24 kV

Monday, August 31, 2015, 13:30: No sparks

Monday, August 31, 2015, 13:37: PNG1 returned after a spark

Monday, August 31, 2015, 14:06: BIAS/EL 50 / 25 kV

Monday, August 31, 2015, 14:45: No sparks.

Monday, August 31, 2015, 15:15: BIAS/EL 51 / 25 kV

Monday, August 31, 2015, 15:38: BIAS/EL 51 / 30 kV

Monday, August 31, 2015, 16:01: Tested XCB0 and YCB0 to 5 kV. Some sparking. Tested CCB0 to 4 kV. No sparking.

Monday, August 31, 2015, 16:50: No sparks for 1 hour at 51 / 30 kV.

Monday, August 31, 2015, 17:00: HV off.

 Monday, August 31, 2015, 17:07: EE at 2 kV, R= 1 MOhm

Monday, August 31, 2015, 17:08 : EE off.

Monday, August 31, 2015, 17:10: Water off.

Monday, August 31, 2015, 17:12 : Vacuum gauges off. Turbos off. Roughing pump off.

ELOG V2.9.2-2455