  RH-ISAC, Page 117 of 140  Not logged in ELOG logo
  ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  2680   Thursday, September 12, 2024, 14:12 Adam NewsomeWaste Package/ShipDevelopment SiC#44Failed waste emplacement at CNL: Flask #22, Pail 275 (SiC#44)On 2024-09-12, CNL reported difficulty
with lowering Pail 275 from F-308 flask #22
into their tile hole. The four other pails
 Report_on_Inspection_of_Pail_275_on_2024-10-03.pdf 
  2330   Monday, June 20, 2022, 11:00 Frank SongNorth Hot-CellRepairTM2SiC#42Failed Sic#42 electrical measurement at NHC An electrical check was done at NHC,
see attachment pls.
 Failed_Sic#42_electrical_measurement_at_NHC.jpg 
  699   Monday, July 07, 2014, 14:45 Grant MinorITEMaintenanceTM3SiC #30FEBIAD gas line checkThere were some problems this morning with
provision of FEBIAD gas to the the target
at ITE.  It was suspected that the gas
 ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg 
  1270   Thursday, June 30, 2016, 13:33 Dan McDonaldSpent Target VaultMaintenance  F308'sThe five spent target F308  flasks
where gone through in accordance with Nordion
guidelines, the sixth spare is remains in
  
  2588   Thursday, May 09, 2024, 13:52 Riley SykesWaste Package/ShipStandard Operation  F308 Service/Inspection F308 Inspection and service complete
on #06, #08, #13, #15, #16, #19, #20, #21,
#22.
  
  806   Monday, December 01, 2014, 14:48 Travis CaveSpent Target VaultStandard Operation  F-308s movedThe F-308s have been moved into the target
hall,  for filling on wednesday.
  
  1155   Friday, February 19, 2016, 06:58 maicodallavalleSpent Target VaultMaintenance  F-308's serviced/loaded/ bolts torquedFive F-308's were loaded with spent ISAC
targets. All five F-308's were serviced two
weeks ago. All bolts were torqued and security 
  
  1112   Friday, October 23, 2015, 07:41 Dan McDonaldSpent Target VaultMaintenance  F-308'sSix F-308's where received from Nordion
#6,#15,#13,#16 all contained contamination.
Loose contamination was removed with some
  
  2546   Friday, February 16, 2024, 10:57 Adam NewsomeSpent Target VaultStandard Operation  F-308 flask loading - three flasks loadedToday (2024-02-16), three flasks were loaded
in preparation for  shipment with the following
targets: UCx#39, UCx#41 and C#3.
 Target_Index_2024-02-16.xlsm 
  2540   Friday, February 09, 2024, 12:52 Adam NewsomeSpent Target VaultStandard Operation  F-308 flask loading - five flasks loadedToday (2024-02-09), five flasks were loaded
in preparation for shipment with the following
targets: SiC#41, SiC#42, Nb#9, UC#36, Ta#58.
 Target_Index_2024-02-09.xlsm 
  664   Tuesday, May 27, 2014, 09:38 maicodallavalleSpent Target VaultMaintenance F-308 Maintenance F-308 MaintenanceAll the F-308's can back from being certified
at Nordion.  All of the F-308's have
been serviced and are ready to be filled
  
  665   Tuesday, May 27, 2014, 09:42 maicodallavalleSpent Target VaultMaintenance  F-308 MaintenanceAll of the serviced F-308's have been moved
to the South Hot cell area.
  
  685   Tuesday, June 24, 2014, 11:33 maicodallavalleSpent Target VaultStandard Operation  F-308 MaintenanceFive F - 308 flasks containing five ISAC
spent targets were moved from the anteroom
into the south hot cell area. When the F
  
  804   Monday, December 01, 2014, 12:05 maicodallavalleSpent Target VaultMaintenance  F-308 MaintenanceF-308's have been serviced and are ready
to be filled with spent targets. F-308's
witch were serviced are #6,#13,#15,#16,and
  
  2324   Wednesday, May 25, 2022, 10:23 Nadia JorgensonSpent Target VaultRepair  F-308 Loading, Mini-Storage Vault Failure5 pails were moved from the mini-storage
vault into F-308's
At one point during the loading the
  
  200   Friday, November 02, 2012, 08:45 maicodallavalleSpent Target VaultMaintenance  F-308The F-308 have been cleaned and serviced.
There were three F-308's that came back with
some contamination.#13, #15 and #19 were
  
  320   Wednesday, April 24, 2013, 10:36 maicodallavalleSpent Target VaultMaintenance  F-308The F-308's have been serviced and are
ready to be filled. All inspection records
are stored  in docushare.
  
  417   Wednesday, August 07, 2013, 06:47 maicodallavalleSpent Target VaultMaintenance  F-308All the F-308's have been torqued up 
and the locks installed. Ready to be moved.
  
  1111   Wednesday, October 21, 2015, 11:58 Anders MjosSouth Hot-CellDevelopmentTM2ZrC#7Extraction Electrode inspectionThe failed extraction electrode was inspected
in the hot cell this morning by Anders and
Chad. The following electrical measurements
  
  1810   Friday, October 26, 2018, 09:44 Travis CaveConditioning StationStandard Operation  Exit Module movedThe west exit #2 module has been moved from
the south hot cell to the conditioning station.
  