2680
|
Thursday, September 12, 2024, 14:12 |
Adam Newsome | Waste Package/Ship | Development | | SiC#44 | Failed waste emplacement at CNL: Flask #22, Pail 275 (SiC#44) | On 2024-09-12, CNL reported difficulty
with lowering Pail 275 from F-308 flask #22
into their tile hole. The four other pails |
|
2330
|
Monday, June 20, 2022, 11:00 |
Frank Song | North Hot-Cell | Repair | TM2 | SiC#42 | Failed Sic#42 electrical measurement at NHC | An electrical check was done at NHC,
see attachment pls. |
|
699
|
Monday, July 07, 2014, 14:45 |
Grant Minor | ITE | Maintenance | TM3 | SiC #30 | FEBIAD gas line check | There were some problems this morning with
provision of FEBIAD gas to the the target
at ITE. It was suspected that the gas |
|
1270
|
Thursday, June 30, 2016, 13:33 |
Dan McDonald | Spent Target Vault | Maintenance | | | F308's | The five spent target F308 flasks
where gone through in accordance with Nordion
guidelines, the sixth spare is remains in |
|
2588
|
Thursday, May 09, 2024, 13:52 |
Riley Sykes | Waste Package/Ship | Standard Operation | | | F308 Service/Inspection | F308 Inspection and service complete
on #06, #08, #13, #15, #16, #19, #20, #21,
#22. |
|
806
|
Monday, December 01, 2014, 14:48 |
Travis Cave | Spent Target Vault | Standard Operation | | | F-308s moved | The F-308s have been moved into the target
hall, for filling on wednesday. |
|
1155
|
Friday, February 19, 2016, 06:58 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308's serviced/loaded/ bolts torqued | Five F-308's were loaded with spent ISAC
targets. All five F-308's were serviced two
weeks ago. All bolts were torqued and security |
|
1112
|
Friday, October 23, 2015, 07:41 |
Dan McDonald | Spent Target Vault | Maintenance | | | F-308's | Six F-308's where received from Nordion
#6,#15,#13,#16 all contained contamination.
Loose contamination was removed with some |
|
2546
|
Friday, February 16, 2024, 10:57 |
Adam Newsome | Spent Target Vault | Standard Operation | | | F-308 flask loading - three flasks loaded | Today (2024-02-16), three flasks were loaded
in preparation for shipment with the following
targets: UCx#39, UCx#41 and C#3. |
|
2540
|
Friday, February 09, 2024, 12:52 |
Adam Newsome | Spent Target Vault | Standard Operation | | | F-308 flask loading - five flasks loaded | Today (2024-02-09), five flasks were loaded
in preparation for shipment with the following
targets: SiC#41, SiC#42, Nb#9, UC#36, Ta#58. |
|
664
|
Tuesday, May 27, 2014, 09:38 |
maicodallavalle | Spent Target Vault | Maintenance | | F-308 Maintenance | F-308 Maintenance | All the F-308's can back from being certified
at Nordion. All of the F-308's have
been serviced and are ready to be filled |
|
665
|
Tuesday, May 27, 2014, 09:42 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 Maintenance | All of the serviced F-308's have been moved
to the South Hot cell area. |
|
685
|
Tuesday, June 24, 2014, 11:33 |
maicodallavalle | Spent Target Vault | Standard Operation | | | F-308 Maintenance | Five F - 308 flasks containing five ISAC
spent targets were moved from the anteroom
into the south hot cell area. When the F |
|
804
|
Monday, December 01, 2014, 12:05 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 Maintenance | F-308's have been serviced and are ready
to be filled with spent targets. F-308's
witch were serviced are #6,#13,#15,#16,and |
|
2324
|
Wednesday, May 25, 2022, 10:23 |
Nadia Jorgenson | Spent Target Vault | Repair | | | F-308 Loading, Mini-Storage Vault Failure | 5 pails were moved from the mini-storage
vault into F-308's
At one point during the loading the |
|
200
|
Friday, November 02, 2012, 08:45 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | The F-308 have been cleaned and serviced.
There were three F-308's that came back with
some contamination.#13, #15 and #19 were |
|
320
|
Wednesday, April 24, 2013, 10:36 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | The F-308's have been serviced and are
ready to be filled. All inspection records
are stored in docushare. |
|
417
|
Wednesday, August 07, 2013, 06:47 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | All the F-308's have been torqued up
and the locks installed. Ready to be moved. |
|
1111
|
Wednesday, October 21, 2015, 11:58 |
Anders Mjos | South Hot-Cell | Development | TM2 | ZrC#7 | Extraction Electrode inspection | The failed extraction electrode was inspected
in the hot cell this morning by Anders and
Chad. The following electrical measurements |
|
1810
|
Friday, October 26, 2018, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | | | Exit Module moved | The west exit #2 module has been moved from
the south hot cell to the conditioning station. |
|