ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  579   Thursday, January 09, 2014, 11:07 chad fisherSouth Hot-CellMaintenance  Field LevelI have managed to reduce the field at the
broken manipulator from 12 mSv/h to 400 uSv/h.
  
  2775   Thursday, February 20, 2025, 11:29 chad fisherSouth Hot-CellStandard Operation  Field CheckAfter removing the previously found extraction
electrode and other suspect components the
field at the manipulator tongs (in front
  
  1515   Monday, May 01, 2017, 08:53 chad fisherSouth Hot-CellRepairTM3 Fiberglass removalFiberglass, capton tape and tie straps
have been removed from TM3.
  
  2020   Thursday, October 31, 2019, 10:17 David WangAssembly/Bench TestMaintenanceTM2 Febiad target gas line leak check.Feibiad gas line for ITE and its adapter
fittings for TM2 are tested today by installing
them on a dummy water stem. No leak on VCO
  
  545   Monday, November 18, 2013, 11:54 Bevan MossConditioning StationRepairTM2 Fault on TCS Chill This morning when I went to start
HV conditioning CP2 and CP3 both had faults
and the temperature of the water was ~27C.
  
  832   Thursday, January 08, 2015, 15:24 Anders MjosConditioning StationDevelopmentTM2 Fault 2 on chiller unit Found both VFDs with OF3 fault (over
voltage during constant speed operation).
Thursday, January 08, 2015, 16:37:
 Capture.PNGVFD_Fault.jpg 
  259   Wednesday, March 13, 2013, 14:30 Bevan MossConditioning StationDevelopment  Faraday Cup Dave Morris and I investigated the
Faraday Cup today. It was found to be plumed
in the wrong direction (fails in). This is
  
  1586   Tuesday, July 18, 2017, 15:04 Travis CaveCraneMaintenance  Failure of the ISAC TH Crane Rotate. Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block
  
  2680   Thursday, September 12, 2024, 14:12 Adam NewsomeWaste Package/ShipDevelopment SiC#44Failed waste emplacement at CNL: Flask #22, Pail 275 (SiC#44)On 2024-09-12, CNL reported difficulty
with lowering Pail 275 from F-308 flask #22
into their tile hole. The four other pails
 Report_on_Inspection_of_Pail_275_on_2024-10-03.pdf 
  2330   Monday, June 20, 2022, 11:00 Frank SongNorth Hot-CellRepairTM2SiC#42Failed Sic#42 electrical measurement at NHC An electrical check was done at NHC,
see attachment pls.
 Failed_Sic#42_electrical_measurement_at_NHC.jpg 
  699   Monday, July 07, 2014, 14:45 Grant MinorITEMaintenanceTM3SiC #30FEBIAD gas line checkThere were some problems this morning with
provision of FEBIAD gas to the the target
at ITE.  It was suspected that the gas
 ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg 
  1270   Thursday, June 30, 2016, 13:33 Dan McDonaldSpent Target VaultMaintenance  F308'sThe five spent target F308  flasks
where gone through in accordance with Nordion
guidelines, the sixth spare is remains in
  
  2588   Thursday, May 09, 2024, 13:52 Riley SykesWaste Package/ShipStandard Operation  F308 Service/Inspection F308 Inspection and service complete
on #06, #08, #13, #15, #16, #19, #20, #21,
#22.
  
  806   Monday, December 01, 2014, 14:48 Travis CaveSpent Target VaultStandard Operation  F-308s movedThe F-308s have been moved into the target
hall,  for filling on wednesday.
  
  1155   Friday, February 19, 2016, 06:58 maicodallavalleSpent Target VaultMaintenance  F-308's serviced/loaded/ bolts torquedFive F-308's were loaded with spent ISAC
targets. All five F-308's were serviced two
weeks ago. All bolts were torqued and security 
  
  1112   Friday, October 23, 2015, 07:41 Dan McDonaldSpent Target VaultMaintenance  F-308'sSix F-308's where received from Nordion
#6,#15,#13,#16 all contained contamination.
Loose contamination was removed with some
  
  2546   Friday, February 16, 2024, 10:57 Adam NewsomeSpent Target VaultStandard Operation  F-308 flask loading - three flasks loadedToday (2024-02-16), three flasks were loaded
in preparation for  shipment with the following
targets: UCx#39, UCx#41 and C#3.
 Target_Index_2024-02-16.xlsm 
  2540   Friday, February 09, 2024, 12:52 Adam NewsomeSpent Target VaultStandard Operation  F-308 flask loading - five flasks loadedToday (2024-02-09), five flasks were loaded
in preparation for shipment with the following
targets: SiC#41, SiC#42, Nb#9, UC#36, Ta#58.
 Target_Index_2024-02-09.xlsm 
  664   Tuesday, May 27, 2014, 09:38 maicodallavalleSpent Target VaultMaintenance F-308 Maintenance F-308 MaintenanceAll the F-308's can back from being certified
at Nordion.  All of the F-308's have
been serviced and are ready to be filled
  
  665   Tuesday, May 27, 2014, 09:42 maicodallavalleSpent Target VaultMaintenance  F-308 MaintenanceAll of the serviced F-308's have been moved
to the South Hot cell area.
  