  1123   Thursday, November 12, 2015, 13:25 Anders MjosConditioning StationStandard OperationTM3FEBIAD Test TargetElectrical check and leak check

Target to Anode and target to Common showed ~ 500 kOhm values. No leaks above 3E-9 atm-cc/s seen. See attached.  

Attachment 1: TM3_iwth_FEBIAD_in_TCS_Electrical_Check.pdf
TM3_iwth_FEBIAD_in_TCS_Electrical_Check.pdf
  1125   Monday, November 16, 2015, 10:09 Anders MjosConditioning StationStandard OperationTM3FEBIAD Test TargetElectrical check after HV conditioning

 Problem found between ANODE (F) and chassis 90 kOhm. See attachment for details.

Attachment 1: 2015-11-16_TM3_Electrical_Test.pdf
2015-11-16_TM3_Electrical_Test.pdf
  7   Tuesday, July 19, 2011, 12:02 Travis CaveSouth Hot-CellStandard OperationTM4Ta#36Electrical check

See attached PDF for the details.

Attachment 1: TM#4_SIS_Elec_Check2.pdf
TM#4_SIS_Elec_Check2.pdf
  15   Thursday, July 28, 2011, 12:02 Travis CaveSouth Hot-CellStandard OperationTM1Ta#37Electrical check

TM#1 has passed the the electrical check.

Attachment 1: Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf
Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf
  34   Monday, October 03, 2011, 14:52 Travis CaveSouth Hot-CellStandard OperationTM1TaC#1Electrical check

TM#1 with TaC#1 installed passed the electrical test. With a value of 882MOhms that was meggered from the heat shield to the chassis, all other measurements are within spec.

  37   Tuesday, October 25, 2011, 08:47 Travis CaveSouth Hot-CellStandard OperationTM4SiC#26 High PoweredElectrical check

TM#4 with SiC#26 HP has been checked electrically it has passed. It was noted that the Megger check of the Oven to Chassis (earth ground) and Oven to 60kV Common is low but will not hinder running, according to Don Jackson.  Also yesterday the transition piece that sits on the 55 pin connector was damaged from excessive handling, it was removed and repaired and it now back in place.

  56   Friday, November 18, 2011, 09:44 Travis CaveSouth Hot-CellStandard OperationTM1UCx#3Electrical check

Electrical checks of TM#1 with UCx#3 have been completed. They all appear to be with in operational range. All megger checks were done at 500 volts. See attached file for details.

Attachment 1: ITW_UC#3_Elec_check.PDF
ITW_UC#3_Elec_check.PDF
  88   Thursday, April 19, 2012, 09:36 Travis CaveSouth Hot-CellStandard OperationTM1Nb#6Electrical check

Electrical check has been completed of TM#1 with Nb#6 attached. Our new micro-ohm meter was also used for the first time for this test.

Attachment 1: Elec_Check_TM1_Nb6.PDF
Elec_Check_TM1_Nb6.PDF
  100   Tuesday, May 15, 2012, 11:45 Travis CaveSouth Hot-CellStandard OperationTM4SiC#26Electrical check

Results of the electrical check of TM#4 with SiC#26 attached post beam.

Attachment 1: TM#4_SiC#26_FEBIAD_post_beam.PDF
TM#4_SiC#26_FEBIAD_post_beam.PDF TM#4_SiC#26_FEBIAD_post_beam.PDF TM#4_SiC#26_FEBIAD_post_beam.PDF TM#4_SiC#26_FEBIAD_post_beam.PDF
  106   Friday, May 18, 2012, 08:29 Travis CaveSouth Hot-CellStandard OperationTM4SiC#27Electrical check

TM#4 with SiC#27 has had its electrical check. See attached PDF for details.

Attachment 1: TM#4_SiC#27_pre_beam.PDF
TM#4_SiC#27_pre_beam.PDF
  108   Tuesday, May 22, 2012, 08:33 Travis CaveConditioning StationStandard OperationTM4SiC#27Electrical check

Electrical check of TM#4 with SiC#27 under vacuum at that conditioning station. See attached PDF for details.

Attachment 1: TM#4_SiC#27_pre_beam_under_vac.PDF
TM#4_SiC#27_pre_beam_under_vac.PDF
  125   Monday, June 11, 2012, 14:14 Travis CaveConditioning StationStandard OperationTM1Ta#38Electrical check

Electrical check of TM#1 with Ta#38 at the conditioning station under vacuum. See attached file for details.

Attachment 1: TM#1_Ta38_at_constat_elec_check.PDF
TM#1_Ta38_at_constat_elec_check.PDF
  138   Wednesday, July 04, 2012, 11:33 Travis CaveSouth Hot-CellStandard OperationTM4UO#3Electrical check

Electrical check of TM#4 with  UO#3 attached at the south hot cell see attached PDF for full results. It has been noted that the Anode to 60kV common is of a low value after consulting with Friedhelm Ames it was determined will will run with what we have.

Attachment 1: TM#4_UO#3_elec_check.PDF
TM#4_UO#3_elec_check.PDF
  141   Friday, July 06, 2012, 09:24 Travis CaveConditioning StationStandard OperationTM4UO#3Electrical check

Electrical check of the target was done at the conditioning station under vacuum, see attached file for details.

Attachment 1: TM#4_UO#3_elec_check_under_vac.PDF
TM#4_UO#3_elec_check_under_vac.PDF
  156   Wednesday, August 01, 2012, 09:14 Travis CaveConditioning StationStandard OperationTM1UCx#4Electrical check

TM#1 with UCx#4 electrical check done at the conditioning station under vacuum, see attached sheet for results.

Attachment 1: TM#1_UC#4_under_vac.PDF
TM#1_UC#4_under_vac.PDF
  171   Wednesday, September 05, 2012, 14:40 Travis CaveConditioning StationStandard OperationTM4NiO#1Electrical check

See attached PDF for details. 60kV Common to the target is low at 343k but I've been told will work. Test will be done again on Friday after it has sat a few days under vacuum.

Attachment 1: TM#4_NiO#1.PDF
TM#4_NiO#1.PDF
  174   Friday, September 07, 2012, 10:37 Travis CaveConditioning StationStandard OperationTM4NiO#1Electrical check

Electrical check of the TM#4 with NiO#1 was done again today. see attached file for results.

Attachment 1: TM#4_NiO#1a.PDF
TM#4_NiO#1a.PDF
  183   Wednesday, September 19, 2012, 11:23 Travis CaveSouth Hot-CellStandard OperationTM1Nb#7Electrical check

TM#1 with Nb#7 attached was electrically checked at the south hot cell yesterday, see attached pdf for details. Some notes about this test the oven to the 60kV common is 2Mohm this was noticed on the target prior to installation on the module, and the 60kV common to chassis is low at 874Mohm (low as in a non infinite value).

Attachment 1: TM1_Nb7_Elec_chk_SHC.PDF
TM1_Nb7_Elec_chk_SHC.PDF
  185   Thursday, September 20, 2012, 08:45 Travis CaveConditioning StationStandard OperationTM1Nb#7Electrical check

Electrical check was done at the conditioning station this morning results are on the attached PDF.

Attachment 1: TM1_Nb7_Elec_chk_CS.PDF
TM1_Nb7_Elec_chk_CS.PDF
  206   Wednesday, November 07, 2012, 09:25 Travis CaveSouth Hot-CellStandard OperationTM1TiC#3Electrical check

TM#1 with TiC#3 target has had the electrical performed on it. See attached PDF for details.

Attachment 1: TM_1_TiC_3_Elec_check_SHC.PDF
TM_1_TiC_3_Elec_check_SHC.PDF