1123
|
Thursday, November 12, 2015, 13:25 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check and leak check |
Target to Anode and target to Common showed ~ 500 kOhm values. No leaks above 3E-9 atm-cc/s seen. See attached. |
Attachment 1: TM3_iwth_FEBIAD_in_TCS_Electrical_Check.pdf
|
|
1125
|
Monday, November 16, 2015, 10:09 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | FEBIAD Test Target | Electrical check after HV conditioning |
Problem found between ANODE (F) and chassis 90 kOhm. See attachment for details. |
Attachment 1: 2015-11-16_TM3_Electrical_Test.pdf
|
|
7
|
Tuesday, July 19, 2011, 12:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#36 | Electrical check |
See attached PDF for the details. |
Attachment 1: TM#4_SIS_Elec_Check2.pdf
|
|
15
|
Thursday, July 28, 2011, 12:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#37 | Electrical check |
TM#1 has passed the the electrical check. |
Attachment 1: Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf
|
|
34
|
Monday, October 03, 2011, 14:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TaC#1 | Electrical check |
TM#1 with TaC#1 installed passed the electrical test. With a value of 882MOhms that was meggered from the heat shield to the chassis, all other measurements are within spec. |
37
|
Tuesday, October 25, 2011, 08:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 High Powered | Electrical check |
TM#4 with SiC#26 HP has been checked electrically it has passed. It was noted that the Megger check of the Oven to Chassis (earth ground) and Oven to 60kV Common is low but will not hinder running, according to Don Jackson. Also yesterday the transition piece that sits on the 55 pin connector was damaged from excessive handling, it was removed and repaired and it now back in place. |
56
|
Friday, November 18, 2011, 09:44 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#3 | Electrical check |
Electrical checks of TM#1 with UCx#3 have been completed. They all appear to be with in operational range. All megger checks were done at 500 volts. See attached file for details. |
Attachment 1: ITW_UC#3_Elec_check.PDF
|
|
88
|
Thursday, April 19, 2012, 09:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Nb#6 | Electrical check |
Electrical check has been completed of TM#1 with Nb#6 attached. Our new micro-ohm meter was also used for the first time for this test. |
Attachment 1: Elec_Check_TM1_Nb6.PDF
|
|
100
|
Tuesday, May 15, 2012, 11:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 | Electrical check |
Results of the electrical check of TM#4 with SiC#26 attached post beam. |
Attachment 1: TM#4_SiC#26_FEBIAD_post_beam.PDF
|
|
106
|
Friday, May 18, 2012, 08:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#27 | Electrical check |
TM#4 with SiC#27 has had its electrical check. See attached PDF for details. |
Attachment 1: TM#4_SiC#27_pre_beam.PDF
|
|
108
|
Tuesday, May 22, 2012, 08:33 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#27 | Electrical check |
Electrical check of TM#4 with SiC#27 under vacuum at that conditioning station. See attached PDF for details. |
Attachment 1: TM#4_SiC#27_pre_beam_under_vac.PDF
|
|
125
|
Monday, June 11, 2012, 14:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#38 | Electrical check |
Electrical check of TM#1 with Ta#38 at the conditioning station under vacuum. See attached file for details. |
Attachment 1: TM#1_Ta38_at_constat_elec_check.PDF
|
|
138
|
Wednesday, July 04, 2012, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UO#3 | Electrical check |
Electrical check of TM#4 with UO#3 attached at the south hot cell see attached PDF for full results. It has been noted that the Anode to 60kV common is of a low value after consulting with Friedhelm Ames it was determined will will run with what we have. |
Attachment 1: TM#4_UO#3_elec_check.PDF
|
|
141
|
Friday, July 06, 2012, 09:24 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UO#3 | Electrical check |
Electrical check of the target was done at the conditioning station under vacuum, see attached file for details. |
Attachment 1: TM#4_UO#3_elec_check_under_vac.PDF
|
|
156
|
Wednesday, August 01, 2012, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UCx#4 | Electrical check |
TM#1 with UCx#4 electrical check done at the conditioning station under vacuum, see attached sheet for results. |
Attachment 1: TM#1_UC#4_under_vac.PDF
|
|
171
|
Wednesday, September 05, 2012, 14:40 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | NiO#1 | Electrical check |
See attached PDF for details. 60kV Common to the target is low at 343k but I've been told will work. Test will be done again on Friday after it has sat a few days under vacuum. |
Attachment 1: TM#4_NiO#1.PDF
|
|
174
|
Friday, September 07, 2012, 10:37 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | NiO#1 | Electrical check |
Electrical check of the TM#4 with NiO#1 was done again today. see attached file for results. |
Attachment 1: TM#4_NiO#1a.PDF
|
|
183
|
Wednesday, September 19, 2012, 11:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Electrical check |
TM#1 with Nb#7 attached was electrically checked at the south hot cell yesterday, see attached pdf for details. Some notes about this test the oven to the 60kV common is 2Mohm this was noticed on the target prior to installation on the module, and the 60kV common to chassis is low at 874Mohm (low as in a non infinite value). |
Attachment 1: TM1_Nb7_Elec_chk_SHC.PDF
|
|
185
|
Thursday, September 20, 2012, 08:45 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Nb#7 | Electrical check |
Electrical check was done at the conditioning station this morning results are on the attached PDF. |
Attachment 1: TM1_Nb7_Elec_chk_CS.PDF
|
|
206
|
Wednesday, November 07, 2012, 09:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TiC#3 | Electrical check |
TM#1 with TiC#3 target has had the electrical performed on it. See attached PDF for details. |
Attachment 1: TM_1_TiC_3_Elec_check_SHC.PDF
|
|