2566
|
Tuesday, April 23, 2024, 17:34 |
Carla Babcock | South Hot-Cell | Repair | TM3 | | TM3 wire pulling | Wires were pulled in TM3 and service cap
was closed up again:
Einzel lens wire (30kV kapton), routed |
|
|
2581
|
Thursday, May 02, 2024, 18:48 |
Carla Babcock | ITW | Standard Operation | | | ITW cage setup | ITW gas lines pumped down to 2e-3Torr on
leak detector with leak rate in the low e-7
atm-cc/s. Gas bottles opened at 3psi and |
|
|
2591
|
Tuesday, May 14, 2024, 15:27 |
Carla Babcock | ITE | Development | TM3 | UCx#44 | TM3 conditioning and testing in ITE | Tuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will
see if the HV cage in the pit can hold 60kV |
|
|
2604
|
Tuesday, June 04, 2024, 11:44 |
Carla Babcock | South Hot-Cell | Development | | empty LP FEBIAD | investigation of cathode short on empty LP FEBIAD | On May 30 Aaron, Chad and I removed the
empty LP FEBIAD target from the SHC into
the anteroom to attempt to find out the source |
|
|
2613
|
Friday, June 14, 2024, 16:04 |
Carla Babcock | ITW | Repair | TM4 | UC#45 | Replaced and reinstalled electronics in ITW cage | ITW has been behaving badly at higher voltages
recently, even without protons on. I conditioned
it up to 50kV with heaters off in the TCS |
|
|
2615
|
Monday, June 17, 2024, 17:24 |
Carla Babcock | ITE | Development | TM3 | UCx#44 | Status of gas system prototype in ITE | A new gas system for FEBIAD operation was
installed in ITE to enable us to use a calibrated
leak which is attached to the target heat |
|
|
2622
|
Monday, June 24, 2024, 14:37 |
Carla Babcock | South Hot-Cell | Development | TM3 | UCx#44 | Inspection of TM3 and UCx#44 after no-protons run | TM3 and UCx#44 ran in ITE but issues with
the cyclotron prevented proton beam delivery.
Nonetheless, the target was heated and provided |
|
|
2630
|
Thursday, July 04, 2024, 01:20 |
Carla Babcock | ITE | Development | TM3 | SiC#46 | TM3 conditioning with protons | Initial Summary:
TM3 sparking behaviour in ITE has
been very disruptive both with and without |
|
|
2636
|
Tuesday, July 09, 2024, 16:14 |
Carla Babcock | ITE | Repair | | | Attempts to reduce ITE:EL trips from HV sparks | ITE:EL has been tripping off due to HV
sparks. Usually this also trips ITE:Q1/2.
These are sitting in side-by-side racks. |
8x |
|
2654
|
Sunday, August 11, 2024, 11:25 |
Carla Babcock | South Hot-Cell | Repair | TM3 | TiC#8 | short on multipin wires to TBHT discovered | With the new TiC#8 target installed on
TM3, there was a ~7kOhm connection between
TGHT/TBHT (A/B/C/D) and HV common. The standard |
|
|
2667
|
Tuesday, August 20, 2024, 11:36 |
Carla Babcock | South Hot-Cell | Standard Operation | | TiC#7 | TiC#7 PIE | TiC#7 failed after two weeks of operations
- measurements in the electrical room indicated
that the negative side of the CHT was broken |
|
|
2668
|
Tuesday, August 20, 2024, 11:53 |
Carla Babcock | South Hot-Cell | Standard Operation | | Nb#10 | Nb#10 PIE | Nb#10 never worked online - repeller had
no effect on the beam and one of the RF wires
was touching HVC. Max 60pA was seen on the |
|
|
11
|
Thursday, July 21, 2011, 17:39 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs | Over the
period of July 20-21st TM1 had several repairs
completed and tested. The easiest of the |
|
|
12
|
Friday, July 22, 2011, 10:30 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs |
|
|
|
19
|
Wednesday, August 17, 2011, 13:09 |
Bevan Moss | ITW | Standard Operation | TM1 | Ta #37 | TM1 move from ITW to Hot Cell | TM1 with Ta #37 target was moved
from ITW to the south hot cell. The rotation
of TM1 may have been off slightly during |
|
|
21
|
Thursday, August 18, 2011, 14:09 |
Bevan Moss | South Hot-Cell | Standard Operation | TM1 | UCx#2 | Leak and Electrical Check plus Remote Move to Conditioning Station | TM1 with UC#2 had the target installed,
the heat shield line was pumped on and achieved
a vacuum of 0.0 x 10^-4 Torr and a leak |
|
|
22
|
Thursday, August 18, 2011, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#2 | Pump Down | Pump down in the conditioning station
started at ~2:40 for rough down. The turbo
pumps were turned on at ~3:30 and at 3:52 |
|
|
23
|
Friday, August 19, 2011, 14:52 |
Bevan Moss | Conditioning Station | Repair | TM1 | UCx#2 | Leak Check | A
leak check was performed on the module when
it was in the conditioning station today. |
|
|
24
|
Wednesday, August 24, 2011, 16:35 |
Bevan Moss | South Hot-Cell | Repair | TM1 | UCx#2 | Move, inspection and repair | On August 22nd TM1 was vented with
Argon in the conditioning station. It had
been pumping with just the roughing pump |
|
|
25
|
Wednesday, August 24, 2011, 17:11 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#2 | Leak Check, HV conditioning and Module Move | Today a leak check on TM1's external seals
and the heat shield line was completed by
David Wang. After 16 hours of the turbo pumps |
|