2667
|
Tuesday, August 20, 2024, 11:36 |
Carla Babcock | South Hot-Cell | Standard Operation | | TiC#7 | TiC#7 PIE | TiC#7 failed after two weeks of operations
- measurements in the electrical room indicated
that the negative side of the CHT was broken |
|
|
2668
|
Tuesday, August 20, 2024, 11:53 |
Carla Babcock | South Hot-Cell | Standard Operation | | Nb#10 | Nb#10 PIE | Nb#10 never worked online - repeller had
no effect on the beam and one of the RF wires
was touching HVC. Max 60pA was seen on the |
|
|
11
|
Thursday, July 21, 2011, 17:39 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs | Over the
period of July 20-21st TM1 had several repairs
completed and tested. The easiest of the |
|
|
12
|
Friday, July 22, 2011, 10:30 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs |
|
|
|
19
|
Wednesday, August 17, 2011, 13:09 |
Bevan Moss | ITW | Standard Operation | TM1 | Ta #37 | TM1 move from ITW to Hot Cell | TM1 with Ta #37 target was moved
from ITW to the south hot cell. The rotation
of TM1 may have been off slightly during |
|
|
21
|
Thursday, August 18, 2011, 14:09 |
Bevan Moss | South Hot-Cell | Standard Operation | TM1 | UCx#2 | Leak and Electrical Check plus Remote Move to Conditioning Station | TM1 with UC#2 had the target installed,
the heat shield line was pumped on and achieved
a vacuum of 0.0 x 10^-4 Torr and a leak |
|
|
22
|
Thursday, August 18, 2011, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#2 | Pump Down | Pump down in the conditioning station
started at ~2:40 for rough down. The turbo
pumps were turned on at ~3:30 and at 3:52 |
|
|
23
|
Friday, August 19, 2011, 14:52 |
Bevan Moss | Conditioning Station | Repair | TM1 | UCx#2 | Leak Check | A
leak check was performed on the module when
it was in the conditioning station today. |
|
|
24
|
Wednesday, August 24, 2011, 16:35 |
Bevan Moss | South Hot-Cell | Repair | TM1 | UCx#2 | Move, inspection and repair | On August 22nd TM1 was vented with
Argon in the conditioning station. It had
been pumping with just the roughing pump |
|
|
25
|
Wednesday, August 24, 2011, 17:11 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#2 | Leak Check, HV conditioning and Module Move | Today a leak check on TM1's external seals
and the heat shield line was completed by
David Wang. After 16 hours of the turbo pumps |
|
|
39
|
Tuesday, October 25, 2011, 16:57 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Turbo Pump 1 issues | Roughing on TM1 started at ~15:00 today
by ~16:30 the module had reached a pressure
of ~200 mTorr and the turbo pumps were turned |
|
|
43
|
Friday, October 28, 2011, 14:29 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Leak Check on October 27/10/2011 | A leak check was performed on the module
on October 27/10/2011 by David Wang and was
reported to Bevan Moss but it never made |
|
|
44
|
Friday, October 28, 2011, 14:42 |
Bevan Moss | South Hot-Cell | Maintenance | TM4 | | Leak check on service cap feed through | After Chad and Davids leak check
results from the containment box it was decided
to perform a leak check on the feed through |
|
|
47
|
Wednesday, November 02, 2011, 13:12 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | SiC#26 High Powered | High Voltage (HV) testing | The silicon carbide targets voltage
was raised to 42 kV today before continuous
current draw was observed. It took roughly |
|
|
59
|
Friday, November 18, 2011, 16:29 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | N/A | High Voltage (HV) testing | TM1 was high voltage tested without
a target on November 16, 2011 with Don Jackson,
Pierre Bricault, and Bevan Moss. The module |
|
|
61
|
Tuesday, November 22, 2011, 15:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx #3 | HV testing | High Voltage (HV) testing was completed
on TM1 today. Vacuum was very good 1.9 x
10^-7 T in the service cap, 3.2 x 10^-7 in |
|
|
85
|
Monday, April 16, 2012, 16:17 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | No Target | High Voltage Test | A high voltage test was completed
on a target free TM1 in the conditioning
station. Only the turbo pumps on the target |
|
|
93
|
Tuesday, April 24, 2012, 10:36 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | Nb#6 | HV test April 23 | A HV test was complete on TM1 with
Friedhelm, David, and Myself. The module
behaved as it has in other tests. The vacuum |
|
|
115
|
Tuesday, June 05, 2012, 12:20 |
Bevan Moss | South Hot-Cell | Standard Operation | TM1 | Ta#38 | Target inserted into HC | Ta#38 has been placed into the south hot
cell. Swipes of the tool port were taken
there was a count of 600 on the floor and |
|
|
116
|
Tuesday, June 05, 2012, 15:06 |
Bevan Moss | ITW | Standard Operation | TM1 | Nb#6 | Module move from ITW to SHC | TM1 has been moved from ITW to the
SHC. The move did encounter some issues,
one of the railings for preventing people |
|