727
|
Thursday, August 07, 2014, 17:07 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx #10 | TM4 is connected in CS. | TM4 is connected at CS. All turbo pumps
are started. The pumping down is good so
far. |
|
|
728
|
Friday, August 08, 2014, 08:47 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx #10 | helium pressure test on TM4 HS water line at CS. | Helium pressure test on TM4 HS water line
at CS is finished. 80psi helium no leak. |
|
|
729
|
Monday, August 11, 2014, 10:34 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#10 | module move | TM#4 with UC#10 has been moved from the
conditioning station to the east target station. |
|
|
731
|
Monday, August 11, 2014, 14:27 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 are vented with argon and disconnected at CS. | TM4 are vented with argon and disconnected
at CS this morning. |
|
|
738
|
Thursday, September 04, 2014, 09:45 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | ZrC#6 | module move | TM#1 with ZrC#6 has been moved from the
south hot cell to the conditioning station. |
|
|
740
|
Thursday, September 04, 2014, 11:19 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 is connected in CS. | TM1 is connected in CS. All turbo pumps
are started. |
|
|
741
|
Friday, September 05, 2014, 07:15 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | Helium pressure test on TM1 HS water line
at CS is done. 80psi helium with LD 0.0xE-9
atm.cc/sec. 3 minutes test and no response |
|
|
743
|
Monday, September 08, 2014, 13:44 |
David Wang | Conditioning Station | Standard Operation | TM1 | ZrC#6 | TM1 is disconnected at CS. | Stopped TM1 and CS turbo pumps. Disconnected
TM1 at CS. The CS and TM1 are under vacuum
and naturally leak up. I will vent it on |
|
|
758
|
Wednesday, October 08, 2014, 09:39 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move | TM#3 has been moved from the North West
Silo to the conditioning station. |
|
|
759
|
Friday, October 10, 2014, 10:47 |
David Wang | Conditioning Station | Development | TM3 | | TM3 has been connected in CS | TM3 has been connected in CS. All water
supplies are bypassed theTM3 on the top of
the service cap. TM3 TP2 was difficult to |
|
|
764
|
Tuesday, October 14, 2014, 17:19 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | No target | High Voltage Conditioning | Wednesday, October 14, 2014
The BIAS voltage was brought
up between 1:30pm and 5pm. Sparks tripped |
|
|
766
|
Thursday, October 16, 2014, 15:40 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller unit | NOTE: If there is a problem with
the chiller unit (ie Fault 1 or Fault 2),
a power cycle may reset the VFDs for the |
|
|
767
|
Friday, October 17, 2014, 13:36 |
Anders Mjos | Conditioning Station | Maintenance | | | TCS:Chil staging not operational | NOTE: If cooling is required, the
compressors will have to be run manually.
Make sure to switch it off again when the |
|
|
768
|
Monday, October 20, 2014, 08:59 |
David Wang | Conditioning Station | Development | TM3 | | Started TCS water system. | I started TCS water system this morning
to check if the chillers work properly. |
|
|
769
|
Monday, October 20, 2014, 09:13 |
David Wang | Conditioning Station | Development | TM3 | | TM3 TP2 failed | TM3 TP2 stopped working this morning at
4:00 AM. I tried to start it but failed.
On normal start mode , It could not pass |
|
|
773
|
Wednesday, October 22, 2014, 09:41 |
David Wang | Conditioning Station | Development | TM3 | | TM3 has been disconnected at CS. | TM3 has been disconnected at CS. It is
vented and ready to move. |
|
|
774
|
Wednesday, October 22, 2014, 13:05 |
Anders Mjos | Conditioning Station | Maintenance | | | Controls upgrade on TCS | See work
permit for details |
|
|
781
|
Wednesday, November 05, 2014, 14:21 |
Anders Mjos | Conditioning Station | Development | | | Jumper installed on TGHT, TBHT and COIL | A copper bar jumper (ITD0488) was
installed on the TGHT, TBHT and COIL conductors
on the taregt hall side for TCS testing. |
|
|
784
|
Thursday, November 06, 2014, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | CS vacuum system has been connected to TM3. | CS vacuum system has been connected
to TM3 for control system test(Dave.Morris). |
|
|
788
|
Monday, November 17, 2014, 11:38 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the conditioning station to the north west
silo. |
|