Entry  Tuesday, October 22, 2013, 14:23, Anders Mjos, ITE, Standard Operation, TM3, NiO#2, Padlle wheel frequency measurements ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow.pdf
as measured today in the electrical room by David and Anders
Entry  Tuesday, October 22, 2013, 11:18, Travis Cave, ITW, Standard Operation, TM1, UC#7, module move 
TM#1 with UC#7 has been moved from the ITW to the south west silo.
Entry  Monday, October 21, 2013, 12:29, Bevan Moss, Conditioning Station, Repair, TM4, , BIAS Canbus 
 There is something wrong with the BIAS canbus controller. It says that it is not alive and has timed out. I have tried unplugging it and plugging
it back in but that has not resolved the problem as it normally does. I have contacted Dave Morris and am waiting to hear from him. I cannot HV test without
this controller.
Entry  Monday, October 21, 2013, 10:52, Bevan Moss, Conditioning Station, Standard Operation, TM4, , Cooling On and Electrical Connections Made 
 The electrical connection have been made and cooling package was started at ~10:50am today
Entry  Friday, October 18, 2013, 15:55, Bevan Moss, Conditioning Station, Standard Operation, TM4, , Turbo Pumps are on 
 The Turbo pumps are now running on TCS
Entry  Friday, October 18, 2013, 14:56, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Electrical check TM#4_no_target_post_coilelectest.PDF
With the coil line removed an electrical check was done on TM#4 at the South Hot Cell see attached pdf.
Entry  Friday, October 18, 2013, 14:37, Bevan Moss, Conditioning Station, Standard Operation, TM4, , Roughing Started 
 The roughing pump has been started.
Entry  Friday, October 18, 2013, 14:33, Bevan Moss, South Hot-Cell, Standard Operation, TM4, , Module move 
 TM4 without a source tray was moved from the SHC to the TCS.  All went well.
Entry  Friday, October 18, 2013, 13:43, chad fisher, South Hot-Cell, Repair, TM4, , C2 Circuit Removal IMG_1224[1].JPGIMG_1227[1].JPGIMG_1230[1].JPG
The C2 circuit (coil 2) water lines and blocks have been revoed from TM4.
Water block jig could not be used as the window water block connection was nowhere near fitting into the jig (IMG_1224 image below) and
therefore caused an interference causing the rest of the blocks to not mate with the jig. A different tool that has never been used was implimented and
Entry  Friday, October 18, 2013, 10:17, Bevan Moss, ITW, Repair, , , Paddle Wheel 
 Yesterday I visually inspected the paddle wheel and noticed that it was spinning freely and constant. As the signal was intermittent replaced the
coil at the back of the wheel only. This does not require access to the high active water. With the coil replaced the signal looked strong. I asked operations
to keep and eye on it and advise if the problem has been resolved. I also discussed with David this morning and he informed me that this is the same procedure
Entry  Thursday, October 17, 2013, 17:16, Grant Minor, ITE, Repair, , , Pre-Separator-area (ITE Harp 9) Blocks Replaced 8x
The pre-separator-area blocks were replaced today by Bevan and Travis, with Grant present for photos and observation.
Photos are attached of each block replacement.
Some difficulty was encountered in replacing the "Layer #3" blocks (photo 9 attached).  An interference occurred between the outside
Entry  Thursday, October 17, 2013, 10:24, chad fisher, South Hot-Cell, Repair, TM4, , Coil Line Removal TM4_C2_circuit.pdf
The containment box was removed from TM4 earlier this morning in preparation for removal of the C2 circuit water lines, their respective water
blocks and conductor block.
Entry  Wednesday, October 16, 2013, 18:53, Grant Minor, ITE, Repair, , , ITE Harp 9 Removed & Blanked-Off - blocks NOT YET replaced 11x
The blocks above the pre-separator section of the ISAC beam lines     were removed today in the Target Hall by Bevan Moss and Chad Fisher     with Lynne
LeMessurier present from RPG.
Entry  Wednesday, October 16, 2013, 10:12, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move 
TM#4 with no target has been moved from the south west silo to the south hot cell.
Entry  Tuesday, October 15, 2013, 16:44, Grant Minor, Crane, Repair, , , Target Hall Crane - operational with temporary thermal sensor bypass ISAC_THall_Crane_elec_E5_1slash1_15Oct2013.pdf
E-mail correspondence on the Target Hall crane fault diagnosis between October 11th and 15th:
On 15/10/2013 3:34 PM, Grant Minor wrote:
Hello all,
Entry  Tuesday, October 15, 2013, 15:34, Bevan Moss, ITE, Standard Operation, TM3, , Blocks moved from ITW to ITE 
 Blocks 1-4 have been moved from ITW to ITE. Block 5 was moved to a storage area as it will be in the way of the harp repair. Danka took air samples
and found 200 counts of alpha on the air samples but nothing on the swipes. It is recommended that resporators be worn while blocks are being lifted and
lowered. She will check the monitor tomorrow to confirm it is behaving as it should.
Entry  Tuesday, October 08, 2013, 18:12, Grant Minor, Crane, Repair, TM4, , Target Hall Crane Stuck in East-West Direction - Update THall_Crane_Bridge_Wheel_at_South_Rail_Splice_8Oct2013.JPGNORELCO_inv13045_joMS-064_31March2013.pdf
Grant Minor wrote this e-mail today:
***
Hello all,
    Reply  Wednesday, October 09, 2013, 19:33, Grant Minor, Crane, Repair, TM4, , Target Hall Crane not operational - likely controls / PLC hardware failure (not stuck wheel) 


    
        
            
            Grant Minor wrote:
            
        
        
            
            Grant Minor
Entry  Tuesday, October 08, 2013, 14:58, Anders Mjos, South Hot-Cell, Standard Operation, , SiC#29, Target to Heat Shield electrical short 
The SiC#29 CTL target has been taken apart with the help of Isaac and Chad. Electrical measurements were done between Target and Heat Shield as the target
was disassembled. Work was done on October 2nd, 4th, 7th and 8th.
The megger showed about 30kOhm at 50V with the following changes
Entry  Tuesday, October 08, 2013, 14:55, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move 
TM#4 with no target was to be moved today but the move was aborted when the crane failed to move in the East - West direction. The crane does not preform
this function in either remote or pendant operation.
Entry  Tuesday, October 08, 2013, 13:11, Travis Cave, Spent Target Vault, Standard Operation, , SiC#29, Spent target move Vault_Storage_October_8_2013.pdf
SiC#29 has been moved to the spent target vault. The target was placed in Pail #109 and placed into slot 2B it was 24.7mS/hr upon removal from the south
hot cell. See attached PDF of the vault details.