  ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  1130   Tuesday, November 24, 2015, 14:00 chad fisherSouth Hot-CellRepair  Compressible waste sorting.Residual fields from the remaining compressible
waste were still too high (as far as I'm
concerned) so I have unpacked all compressible
 20151124_101547.jpg 
  1131   Tuesday, November 24, 2015, 14:02 chad fisherSouth Hot-CellRepair  Left Manip repairelectronics package on left manip died
completely yesterday (it has been going for
a while).
  
  1132   Tuesday, November 24, 2015, 14:03 chad fisherSouth Hot-CellStandard OperationTM4 Ta#46Ta#46 has been removed from TM4.   
  1135   Wednesday, November 25, 2015, 14:13 chad fisherSouth Hot-CellStandard OperationTM4UC#14UCx#14UCx#14 installed onto TM4. High current
fasteners torqued to 130 in lbs.
  
  1136   Wednesday, November 25, 2015, 14:16 chad fisherSouth Hot-CellRepair  Cell DeconCell (table) was systematically cleaned
with a swiffer and resulting piles of contaminated
waste placed in pail with spent Ta target.
 20151125_100512.jpg20151125_101620.jpg 
  1147   Wednesday, December 02, 2015, 10:41 chad fisherSouth Hot-CellRepair  Drum Clean-up #2Another drum of waste was removed from
the south hot cell this morning. This drum
contained one 5 gal steel pail (damaged),
  
  1151   Friday, January 08, 2016, 09:29 chad fisherSouth Hot-CellRepair  Window DeconEntered the hot cell to perform final decon
on the window. Initial swipes this morning
were 11000 c.p.m. on 44-2. After decon approximately
  
  1167   Wednesday, March 16, 2016, 14:23 chad fisherSouth Hot-CellStandard OperationTM2SiC#32SiC#32 removal Target Module InspectionSiC#32 has been removed from TM2. Quick
inspection shows some troubling discoloration
on the water cooled connection blocks of
 20160316_141127.jpg20160316_141146.jpg 
  1172   Friday, March 18, 2016, 11:43 chad fisherSouth Hot-CellStandard Operation  SiC#32 dissectionSiC#32 has been open for inspection.  20160318_105519_1.jpg20160318_105311.jpg20160318_105248.jpg20160318_105428.jpg 
  1195   Wednesday, April 06, 2016, 14:03 chad fisherSouth Hot-CellStandard OperationTM4Ta#47UCx#14 removed Ta#47 installedUCx#14 has been removed from TM4 and Ta#47
installed. No marks on 9 pin connector on
UCx#14.
  
  1225   Tuesday, May 10, 2016, 13:37 chad fisherSouth Hot-CellStandard OperationTM2Ta#48Ta#48 InstallationTa#48 has been installed onto TM2. Also
new window gaskets were installed.
High current fasteners were torqued
  
  1273   Wednesday, July 06, 2016, 09:16 chad fisherSouth Hot-CellStandard OperationTM2SiC#33Ta#48 removed SiC#33 installedTa#48 has been removed from TM2 and SiC#33
installed.
  
  1292   Tuesday, July 26, 2016, 11:22 chad fisherSouth Hot-CellMaintenance  Soth Hot Cell Waste Storage Vault TunnelThe two 45 gal (m) drums of waste removed
from the south hot cell in December 2015
and January 2016 were transferred from the
  
  1296   Tuesday, August 02, 2016, 13:32 chad fisherSouth Hot-CellStandard OperationTM4UC#16UC#16 Removed #17 installedUCx#16 has been removed from TM$ and UCx#17
installed, high current conductors toqued
to 130 in lbs.
  
  1300   Wednesday, August 03, 2016, 09:15 chad fisherSouth Hot-CellRepair  ManipulatorEast manipulator on the south hot cell
is showing signs of eminent wrist/tong cable
failure. Some slight slippage was noted yesterday
  
  1306   Friday, August 05, 2016, 13:50 chad fisherSouth Hot-CellMaintenance  Anteroom clean outSome items have been removed from the anteroom
in preparation for painting. Items have been
placed on plastic in the south hot cell service
  
  1308   Monday, August 08, 2016, 11:24 chad fisherSouth Hot-CellMaintenance  Anteroom Clean-up - WaveguideThe wave guide from TM3 has been surveyed,
swiped and removed from the anteroom and
transported to rad waste for disposal. The
  
  1314   Wednesday, August 10, 2016, 12:18 chad fisherSouth Hot-CellMaintenance  Anteroom clearingBlack "radio active" materials
cabinet has been emptied, items bagged and
removed from the anteroom. Cabinet itself
  
  1317   Friday, August 12, 2016, 09:58 chad fisherSouth Hot-CellMaintenance  Manipulator MaitenanceDisassembled the master side of the right
manipulator this morning to check the wrist
cable. The cable on the master side shows
  
  1321   Tuesday, August 16, 2016, 11:27 chad fisherSouth Hot-CellMaintenance  South Cell Field ReadingsField readings have been taken at the south
hot cell in preparation for entry into the
cell to fix manipulator.
  