Entry  Tuesday, November 24, 2015, 14:00, chad fisher, South Hot-Cell, Repair, , , Compressible waste sorting. 20151124_101547.jpg
Residual fields from the remaining compressible waste were still too high (as far as I'm concerned) so I have unpacked all compressible waste looking
for a "hot" item that has snuck into these items.
I have a hand full of small bolts (possible target components), a hand full of target material/dust (including an entire target disc), and some
Entry  Tuesday, November 24, 2015, 14:02, chad fisher, South Hot-Cell, Repair, , , Left Manip repair 
electronics package on left manip died completely yesterday (it has been going for a while).
Disconnected entire package and replaced with package from "spare" manipulator.
everything is back up and working.
Entry  Tuesday, November 24, 2015, 14:03, chad fisher, South Hot-Cell, Standard Operation, TM4, , Ta#46 
Ta#46 has been removed from TM4.
Entry  Wednesday, November 25, 2015, 14:13, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#14, UCx#14 
UCx#14 installed onto TM4. High current fasteners torqued to 130 in lbs.
Entry  Wednesday, November 25, 2015, 14:16, chad fisher, South Hot-Cell, Repair, , , Cell Decon 20151125_100512.jpg20151125_101620.jpg
Cell (table) was systematically cleaned with a swiffer and resulting piles of contaminated waste placed in pail with spent Ta target.
Entry  Wednesday, December 02, 2015, 10:41, chad fisher, South Hot-Cell, Repair, , , Drum Clean-up #2 
Another drum of waste was removed from the south hot cell this morning. This drum contained one 5 gal steel pail (damaged), two sodium light bulbs, airlines,
and tank suits. Upon removal the drum was/is 1.5 mSv/h on contact. there was 200 counts of contamination found on the lid...easily removed. It will be
moved to the north hot cell at 11am.
Entry  Friday, January 08, 2016, 09:29, chad fisher, South Hot-Cell, Repair, , , Window Decon 
Entered the hot cell to perform final decon on the window. Initial swipes this morning were 11000 c.p.m. on 44-2. After decon approximately 100 counts.
Entry  Wednesday, March 16, 2016, 14:23, chad fisher, South Hot-Cell, Standard Operation, TM2, SiC#32, SiC#32 removal Target Module Inspection 20160316_141127.jpg20160316_141146.jpg
SiC#32 has been removed from TM2. Quick inspection shows some troubling discoloration on the water cooled connection blocks of C and D as well as the
left target heater A.
As for the target, both legs are broken and is has the normal "charge up" marks on the 9 pin connector.
Entry  Friday, March 18, 2016, 11:43, chad fisher, South Hot-Cell, Standard Operation, , , SiC#32 dissection 20160318_105519_1.jpg20160318_105311.jpg20160318_105248.jpg20160318_105428.jpg
SiC#32 has been open for inspection.
Entry  Wednesday, April 06, 2016, 14:03, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#47, UCx#14 removed Ta#47 installed 
UCx#14 has been removed from TM4 and Ta#47 installed. No marks on 9 pin connector on UCx#14.
Entry  Tuesday, May 10, 2016, 13:37, chad fisher, South Hot-Cell, Standard Operation, TM2, Ta#48, Ta#48 Installation 
Ta#48 has been installed onto TM2. Also new window gaskets were installed.
High current fasteners were torqued to 130 in lbs. Shutter side of the containment box recieved new fasteners.
Entry  Wednesday, July 06, 2016, 09:16, chad fisher, South Hot-Cell, Standard Operation, TM2, SiC#33, Ta#48 removed SiC#33 installed 
Ta#48 has been removed from TM2 and SiC#33 installed.
Entry  Tuesday, July 26, 2016, 11:22, chad fisher, South Hot-Cell, Maintenance, , , Soth Hot Cell Waste Storage Vault Tunnel 
The two 45 gal (m) drums of waste removed from the south hot cell in December 2015 and January 2016 were transferred from the north hot cell to the shaft
of the east vault tunnel on Monday, July 25th 2016 and subsequently to the east tunnel bunker in the vault tunnel on Tuesday, July 26th, 2016.The first
drum (removed from the hot cell in December) containing both activated and contaminated metals was measured at 900 uSv/hr @ .5 m and the second drum (removed
Entry  Tuesday, August 02, 2016, 13:32, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#16, UC#16 Removed #17 installed 
UCx#16 has been removed from TM$ and UCx#17 installed, high current conductors toqued to 130 in lbs.
 
UCx#16 did not show the standard arcing marks on the 9 pin connector.
Entry  Wednesday, August 03, 2016, 09:15, chad fisher, South Hot-Cell, Repair, , , Manipulator 
East manipulator on the south hot cell is showing signs of eminent wrist/tong cable failure. Some slight slippage was noted yesterday and confirmed by
a snapping sound and more slippage tomorrow.
Entry  Friday, August 05, 2016, 13:50, chad fisher, South Hot-Cell, Maintenance, , , Anteroom clean out 
Some items have been removed from the anteroom in preparation for painting. Items have been placed on plastic in the south hot cell service area. No
contamination found so far.
Entry  Monday, August 08, 2016, 11:24, chad fisher, South Hot-Cell, Maintenance, , , Anteroom Clean-up - Waveguide 
The wave guide from TM3 has been surveyed, swiped and removed from the anteroom and transported to rad waste for disposal. The wave guide has been stored
in the anteroom since its removal.
Entry  Wednesday, August 10, 2016, 12:18, chad fisher, South Hot-Cell, Maintenance, , , Anteroom clearing 
Black "radio active" materials cabinet has been emptied, items bagged and removed from the anteroom. Cabinet itself has been swiped inside
and out and also been removed from the anteroom. Most items have been removed from the anteroom now save some cardboard, rolls of plastic etc.
Entry  Friday, August 12, 2016, 09:58, chad fisher, South Hot-Cell, Maintenance, , , Manipulator Maitenance 
Disassembled the master side of the right manipulator this morning to check the wrist cable. The cable on the master side shows no sign of wear or fraying
suggesting that the slave side cable may be the item that is wearing. during disassembly of the master I did notice some loose parts that could have been
the source of the audible concern but should not have contributed to the slippage felt in the gripper. I will try and schedule Tuesday for entry into the
Entry  Tuesday, August 16, 2016, 11:27, chad fisher, South Hot-Cell, Maintenance, , , South Cell Field Readings 
Field readings have been taken at the south hot cell in preparation for entry into the cell to fix manipulator.
Field on contact at aluminum cover is 66 uSv/h, and a pole monitor into the cell through the tool port read 297 uSv/h.