1446
|
Tuesday, March 07, 2017, 14:41 |
David Wang | ITE | Maintenance | | | ITE dump plug water circuit is closed for ITE IG1S small surge. | It is closed @ 2:35PM by closing supply
side valve first , the return side valve
of ITE dump plug . |
|
|
1447
|
Wednesday, March 08, 2017, 14:09 |
David Wang | ITE | Maintenance | TM2 | | ITE IG1S increasing. | By retrieving data further, It has been
found no directly relationship between IG1S
surging and dump plug water opening. Vacuum |
   |
|
1448
|
Friday, March 10, 2017, 09:19 |
chad fisher | South Hot-Cell | Standard Operation | | | South Hot Cell Field Measurements | The fields in the hot cell have been measured
by means of a pole monitor through the tool
port. Field was measured to be 25 uSv/h. |
|
|
1449
|
Tuesday, March 14, 2017, 07:34 |
chad fisher | South Hot-Cell | Maintenance | | | Hot Cell Fields | I have re-measured the fields in the hot
cell. Fields at shield door Al cover are
101 uSv\h, in cell at the east manipulator |
|
|
1450
|
Tuesday, March 14, 2017, 11:46 |
chad fisher | South Hot-Cell | Maintenance | | | 'Z' motion cable dry run | Did a dry run with the latest procedure
with Dan Mcdonald. Elapsed time was approximately
30 min. |
|
|
1451
|
Wednesday, March 15, 2017, 07:45 |
chad fisher | South Hot-Cell | Maintenance | | | South Hot Cell Fields | I have moved the suspected "hot"
items in the hot cell and placed them under
some lead bricks. I have re-measured the |
|
|
1452
|
Thursday, March 16, 2017, 10:32 |
David Wang | Spent Target Vault | Repair | TM4 | | TM4 and its silo rust photos | I watched rust on TM4 and its silo. Most
of rust are on est side of module and silo.
See attachments |
13x |
|
1453
|
Thursday, March 16, 2017, 12:24 |
chad fisher | South Hot-Cell | Maintenance | | | West 'Z' motion cable replacement | The west 'Z' motion cable on the east manipulator
has successfully been replaced. The job took
slightly less than an hour (including inspection |
|
|
1454
|
Tuesday, March 21, 2017, 10:05 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target assay. | All target in the ISAC spent target vault
have been either assayed or had their fields
measured or both. |
|
|
1456
|
Tuesday, March 21, 2017, 11:59 |
David Wang | Conditioning Station | Repair | TM4 | | Rust inpsection on TM4 service cap inside surface and shielding plug surface. | Yasmine and I did a rust inpsection on
TM4 service cap inide surface and shielding
plug surface. No rust has been found. Also, |
11x |
|
1459
|
Thursday, March 23, 2017, 11:22 |
Grant Minor | Crane | Maintenance | | | Target Hall crane 20 ton hoist noise / smell - inspection by Gordon Crane & Hoist | Strange noise and a burning brake type
smell was observed yesterday by David and
Anders when running the main 20 ton hoist |
  |
|
1460
|
Thursday, March 23, 2017, 11:42 |
David Wang | Conditioning Station | Maintenance | TM4 | | TM4 Sevice cap rust are cleaned out. | TM4 service cap rust are cleaned out at
TCS. All top surface of TM4 are wiped and
cleaned . The module looks good now. see |
    |
|
1461
|
Friday, March 24, 2017, 11:12 |
Keith C Ng | Spent Target Vault | Standard Operation | | | 2A window transfer | Transfered the 2A window from the ISAC
Storage Vault to the Cyclotron Vault Tunnel
Storage area. RPG storage form attached. |
|
|
1464
|
Monday, March 27, 2017, 06:33 |
David Wang | ITE | Standard Operation | | | ITE clean up | ITE clean up is done. HV cage inside
is wiped. |
|
|
1465
|
Monday, March 27, 2017, 12:55 |
David Wang | Spent Target Vault | Repair | | | S/W silo rust clean up | Rust on S/W silo and cover plate stored
at silo area are cleaned up. |
    |
|
1471
|
Wednesday, March 29, 2017, 14:11 |
David Wang | Conditioning Station | Standard Operation | TM4 | | small leak on TM4 Ta(-) water line. | A small leak has been found on TM4 Ta(-)
which is marked as "B" on terminal
blocks. The LD base Leak rate is 1.2XE-8 |
|
|
1472
|
Thursday, March 30, 2017, 11:21 |
David Wang | Conditioning Station | Repair | TM4 | | Leak check on TM4 Ta(-) water lines in service cap | Leak check on TM4 Ta(-) water lines in
service cap is done. LD base LR after 50minutes
pumping down:0.0xE-9 atm.cc/sec. base pressure: |
|
|
1474
|
Tuesday, April 04, 2017, 10:23 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Helium pressure leak check on TM4 Ta(-) water lines | This morning, The helium pressure leak
check on TM4 Ta(-) is done after TM4 finished
conditioning yesterday. LD base LR:8.0XE-9 |
|
|
1475
|
Tuesday, April 04, 2017, 10:24 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Stopped TCS pumps this morning | Argon vented TCS and TM4 after pumps
are stopped. |
|
|
1476
|
Tuesday, April 04, 2017, 14:39 |
David Wang | Crane | Standard Operation | | | Crane check main hoist on jogging with shielding plug lifted. | Today, I checked TH crane main hoist
when shielding plug is installed into ITE
pit. I did some jogging actions on |
|