2289
|
Tuesday, January 11, 2022, 11:51 |
David Wang | North Hot-Cell | Standard Operation | TM2 | | TM2 has been moved from NHC to SMP. | TM2( no target ) has been moved from
NHC to SMP. The moving is smooth and
successful. |
|
2294
|
Wednesday, January 19, 2022, 13:26 |
David Wang | Crane | Standard Operation | | | Inpection of Target module lifting frames ITA0494-1997-01 and ITA0494-1997-02. | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02..
He certified the use of these two frames. |
   |
2295
|
Wednesday, January 19, 2022, 13:36 |
David Wang | Crane | Standard Operation | | | Targe hall crane below hook attachment pins and plates annual inspection. | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01.
He certified the use of these pins and plates. |
 |
2296
|
Thursday, January 20, 2022, 08:18 |
David Wang | North Hot-Cell | Standard Operation | TM4 | No target | TM4 was removed from NHC to S_W silo yesterday. | TM4 was removed from NHC to S_W silo yesterday.
The remove is smooth and successful. |
|
2298
|
Monday, January 24, 2022, 11:18 |
David Wang | ITE/ITW | Standard Operation | | | TH emergency exit hatch functional check | TH emergency exit hatch which is located
on TH west end roof is opened and closed
for functional check. The hatch works fine. |
|
2299
|
Tuesday, January 25, 2022, 08:57 |
David Wang | ITE/ITW | Standard Operation | | | ITE/ITW have been cleaned with vacuum canister. | ITE/ITW are cleaned with vacuum canister.
HV cage inside and blue nylon insulators
are wiped. Garbage inside the pits |
|
2300
|
Tuesday, January 25, 2022, 12:49 |
David Wang | ITE/ITW | Standard Operation | | | Target station vacuum system visual inspection. | Two shielding blocks above vacuum
station at TH west end were opened for inspection.
Checked ITH:MP1, MP2 lubricant color and |
|
2301
|
Wednesday, February 02, 2022, 11:05 |
David Wang | Crane | Standard Operation | | | Target hall overhand crane annual insepection. | Tom Kauss finished target hall overhead
crane annual inspection today. The crane
works fine. He issued new inspection tag |
|
2302
|
Thursday, February 10, 2022, 11:45 |
David Wang | Spent Target Vault | Standard Operation | | UCx#33. | Spent target UCx #33 has been repacked with a new pail and lid in NHC. | Spent target UCx #33 has been repacked
with a new pail and lid in NHC. Old pail
#255. New pail # 267. Location: Vault slot |
|
2303
|
Thursday, February 10, 2022, 12:24 |
David Wang | ITW | Standard Operation | | | ITW HV test without mdoule. | Carla did the test. and reported
the result as following: HV testing of ITW
is complete. It was pretty well behaved up |
|
2304
|
Thursday, February 10, 2022, 12:42 |
David Wang | ITE | Standard Operation | | | ITE HV test woithout mdoule was done. | Carla
did the test. That is what she wrote in Feb
04th: "I am done with the HV testing |
|
2307
|
Thursday, February 17, 2022, 13:24 |
David Wang | Spent Target Vault | Maintenance | | UCx #34 | Repackage of UCx #34in NHC. | UCX34# in pail 258(Vault lot 7C) has been
repacked today. It is an investigation to
find a possible leak source of radioactive |
|
2308
|
Thursday, February 24, 2022, 13:23 |
David Wang | ITE/ITW | Maintenance | | | Polyurethane water cooling lines replacement in ITE and ITW. | Polyurethane water cooling lines
in ITE and ITW HV shroud are replaced.
Both stations Ta, Tu, MSP, HS, Coil , EE |
|
2310
|
Tuesday, March 01, 2022, 11:51 |
David Wang | Spent Target Vault | Maintenance | | | UCx #32 has been repacked in NHC. | UCx 32# P2N target in vault slot 1B is
repacked is morning for Ferran to take out
his samples( in two small plastic containers) |
|
2311
|
Wednesday, March 02, 2022, 10:51 |
David Wang | ITE/ITW | Standard Operation | | | Replaced old turbopump and 2A3M20 wire scanner are transferred to cyclotron tunnel. | Replaced 9 old turbo pumps from ITE/ ITW
and one 2A3M20 wire scanner from ITE
are transferred to cyclotron tunnel for storage. |
|
2317
|
Thursday, April 28, 2022, 08:16 |
David Wang | ITW | Standard Operation | TM2 | | Annual ITW water signal interlocks check . | Annual ITW water signal interlocks check
was done with TM2 in ITW. Water
signal interlocks on all water circuits related |
|
2325
|
Wednesday, May 25, 2022, 13:23 |
David Wang | ITE | Standard Operation | TM4 | | Annual ITE water signal interlocks. | Annual ITE water signal interlocks check
is done with Rob Shank. All ITE water signal
interlocks work fine. |
|
2336
|
Wednesday, June 22, 2022, 09:03 |
David Wang | ITE | Standard Operation | TM4 | UCX37# P2N | Remotely removed TM2 from ITE to NHC | TM2 with UCx#37 P2N target was removed
from ITE to NHC yesterday morning. The move
is good. |
|
2337
|
Wednesday, June 22, 2022, 09:14 |
David Wang | South Hot-Cell | Standard Operation | TM2 | SiC#42 and SiC#43. | Three of TM2 moves related to SiC#42 to SiC #43 target switching job. | Monday morning June 20th: TM2 with SiC
# 42 was moved from ITW to NHC.
Monday afternoon: TM2 with no target |
|
2340
|
Thursday, June 23, 2022, 13:04 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#64 | helium pressure test on TM4 HS line. | With Ta#64 installed , TM4 HS line was
helium pressure tested at TCS. base leak
rate is 0.0XE-9 atm.cc/sec. HS line tested |
|