Thursday, February 10, 2022, 11:45, David Wang, Spent Target Vault, Standard Operation, , UCx#33., Spent target UCx #33 has been repacked with a new pail and lid in NHC.
Thursday, February 10, 2022, 12:24, David Wang, ITW, Standard Operation, , , ITW HV test without mdoule.
Thursday, February 10, 2022, 12:42, David Wang, ITE, Standard Operation, , , ITE HV test woithout mdoule was done.
Thursday, February 17, 2022, 13:24, David Wang, Spent Target Vault, Maintenance, , UCx #34, Repackage of UCx #34in NHC.
Thursday, February 24, 2022, 13:23, David Wang, ITE/ITW, Maintenance, , , Polyurethane water cooling lines replacement in ITE and ITW.
Tuesday, March 01, 2022, 11:51, David Wang, Spent Target Vault, Maintenance, , , UCx #32 has been repacked in NHC.
Wednesday, March 02, 2022, 10:51, David Wang, ITE/ITW, Standard Operation, , , Replaced old turbopump and 2A3M20 wire scanner are transferred to cyclotron tunnel.
Thursday, April 28, 2022, 08:16, David Wang, ITW, Standard Operation, TM2, , Annual ITW water signal interlocks check .
Wednesday, May 25, 2022, 13:23, David Wang, ITE, Standard Operation, TM4, , Annual ITE water signal interlocks.
Wednesday, June 22, 2022, 09:03, David Wang, ITE, Standard Operation, TM4, UCX37# P2N, Remotely removed TM2 from ITE to NHC
Wednesday, June 22, 2022, 09:14, David Wang, South Hot-Cell, Standard Operation, TM2, SiC#42 and SiC#43. , Three of TM2 moves related to SiC#42 to SiC #43 target switching job.
Thursday, June 23, 2022, 13:04, David Wang, Conditioning Station, Standard Operation, TM4, Ta#64, helium pressure test on TM4 HS line.
Thursday, August 11, 2022, 09:10, David Wang, Conditioning Station, Standard Operation, TM4, SiC #44, HS line helium pressure test. Gas line fitting on module top and gas line leak check.
Thursday, September 08, 2022, 09:06, David Wang, Conditioning Station, Standard Operation, TM2, UCx#39, HS line helium pressure test.
Wednesday, October 05, 2022, 09:31, David Wang, Conditioning Station, Standard Operation, TM4, C#4, HS line helium pressure test. TM4 with C#4 at TCS.
Monday, October 17, 2022, 08:07, David Wang, ITE/ITW, Repair, TM4, , A small leak on target station secondaryvacuum back up line by ITH MP1S.
Thursday, November 03, 2022, 13:15, David Wang, Conditioning Station, Standard Operation, TM2, UCx#40, HS line helium pressure test. TM4 with UCx#40at TCS.
Friday, January 06, 2023, 10:38, David Wang, ITW, Standard Operation, TM2, , ITW/TM2 vacuum vessels leak check and TM2 internal cooling lines helium pressure test.
Tuesday, January 24, 2023, 07:17, David Wang, ITE, Standard Operation, TM4, UCx#41, TM4 water lines helium pressure test 2023.
Tuesday, January 24, 2023, 07:21, David Wang, ITW, Maintenance, , , ITW pit general clean up.