Entry  Tuesday, June 17, 2014, 10:46, David Wang, ITW, Standard Operation, TM1, UC#9, 5 Shielding blocks have been transferred from ITE to ITW. 
5 shielding blocks have been transferred from ITE to ITW. ITW is configured to take proton beam. Argon venting system for ITW is ready also.
Entry  Friday, June 13, 2014, 10:33, Anders Mjos, ITW, Development, TM1, UC#9, Flow meter data 
Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE receving p+

    
        
             
            Temp [C]
Entry  Thursday, June 12, 2014, 09:42, Travis Cave, Spent Target Vault, Standard Operation, , , Targets moved from mini storage to F-308s Vault_Storage_June_12_2014.pdfMini_Vault_Storage_June_12_2014.pdf
Five targets have been moved from the spent target storage to the mini storage. The targets that were moved are UCx #'s 6,7,8 , SiC #28, and Nb #6.
Entry  Tuesday, June 10, 2014, 14:02, David Wang, ITW, Standard Operation, TM1, UC9#, TM1 and ITW turbo pumps have been started. 
TM1 has been connected to ITW. It is pumping down in ITW with 6 turbo-pumps on.
Entry  Tuesday, June 10, 2014, 13:20, Travis Cave, ITW, Standard Operation, TM1, UC#9, module move 
TM#1 with UC#9 moved from the conditioning station to west station.
Entry  Tuesday, June 10, 2014, 07:57, David Wang, Conditioning Station, Standard Operation, TM1, UC#9, TM1 are vented with argon and disconnected at CS. 
TM1 will be moved to ITW this morning.
Entry  Monday, June 09, 2014, 10:33, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, Stop TM1 and CS trubo pumps and ruff pump. 
The CS and TM1 is still under vacuum. They will be vented with argon tomorrow mornig
Entry  Tuesday, June 03, 2014, 09:12, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, TM1 HS line helium pressure test and TM1 electrical check at CS 7x
TM1 HS line helium pressure test and TM1 electrical check at CS under vacuum are finished. Everything is good. See attachment
Entry  Monday, June 02, 2014, 15:40, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started 
TM1 and CS turbo pumps have been started. The vacuum readings are fine on all gauges.
Entry  Monday, June 02, 2014, 13:53, Travis Cave, Conditioning Station, Standard Operation, TM1, UC#9, module move 
TM#1 with UC#9 has been moved from the south hot cell to the conditioning station.
Entry  Monday, June 02, 2014, 11:59, David Wang, South Hot-Cell, Standard Operation, TM1, , Leak check on TM1 HS water line with new UC9# target installed 
Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure  test
on it at CS later.
Entry  Monday, June 02, 2014, 11:28, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#9, Electrical check TM1_UC9_elec_chk_SHC.PDF
TM#1 with UC#9 electrical check see attached pdf for details.
Entry  Monday, June 02, 2014, 11:25, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx #9, UCx #9 Installed 
UCx #9 has been installed.
Entry  Monday, June 02, 2014, 10:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 
TM#1 with no target has been moved from the north west silo to the south hot cell.
Entry  Friday, May 30, 2014, 09:41, Travis Cave, Spent Target Vault, Standard Operation, , Ta#42, Spent target move Vault_Storage_May_30_2014.pdf
Ta#42 in pail #114 has been moved from the south hot cell to the spent target storage vault and place in spot 7B. The target was 277mSv/hr upon removal
from the south hot cell. See attached PDF of vault status.
Entry  Wednesday, May 28, 2014, 08:48, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move 
TM#4 with no target has been moved from the south hot cell to the south west silo.
Entry  Tuesday, May 27, 2014, 11:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#42, Electrical check TM4_Ta42_elec_chk_SHC_postbeam.PDF
TM#4 electrical check with Ta#42 attached post beam at the south hot cell.
Entry  Tuesday, May 27, 2014, 10:42, Travis Cave, ITW, Standard Operation, TM4, Ta#42, module move 
TM#4 with Ta#42 has been moved from  the west target station to the south hot cell.
Entry  Tuesday, May 27, 2014, 09:42, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 Maintenance 
All of the serviced F-308's have been moved to the South Hot cell area.
Entry  Tuesday, May 27, 2014, 09:38, maicodallavalle, Spent Target Vault, Maintenance, , F-308 Maintenance , F-308 Maintenance 
All the F-308's can back from being certified at Nordion.  All of the F-308's have been serviced and are ready to be filled with spent targets.