709
|
Thursday, July 17, 2014, 11:49 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started |
I connected TM1 at CS. All turbo pumps have been started. The pumping down is good so far. |
708
|
Thursday, July 17, 2014, 10:13 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed |
Chad and I leak checked TM1 HS waterline with new target installed at SHC. The LD base LR:0.0xE-9atm.cc/sec, base pressure: 0.0xE-4 torr. Chad sprayed helium on both VCR fittings and flushed helium around the target. No response has been found on leak detector. The target HS line is leak tight so far. I will do helium pressure test on this line at CS on next Monday. |
707
|
Thursday, July 17, 2014, 09:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move |
TM#1 with Ta#43 has been moved from the south hot cell to conditioning station. |
706
|
Wednesday, July 16, 2014, 14:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | Electrical check |
TM#1 with Ta#43 electrical check see attached PDF. |
Attachment 1: TM1_Ta43_elec_chk_shc.PDF
|
|
705
|
Wednesday, July 16, 2014, 13:59 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | SiC#30 | Sic#30 install |
Just some notes on the install of SiC#30 on TM3 last month...It was installed with all new fasteners and torque values provided by Anders were used...of main interest is probably the main high current fasteners which were torqued to 150 in lbs. |
704
|
Wednesday, July 16, 2014, 13:56 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#9 | UCx#9 off Ta on |
The UCx#9 target has been revomed from the target module...leg A was broken as suspected.
Ta#42 has been installed. High current connection fasteners torqued to 150 in lbs. |
703
|
Wednesday, July 16, 2014, 13:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check |
Electrical check of the TM#1 with UC#9 post beam at the south hot cell. |
Attachment 1: TM1_UC9_Elecchk_postbeam.PDF
|
|
702
|
Wednesday, July 16, 2014, 11:28 |
David Wang | ITW | Standard Operation | TM1 | | TM1 had been dsiconnected in ITW. |
The TM1 and ITW were vented with argon gas last night. TM1 had been disconnected in ITW this morning. |
701
|
Wednesday, July 16, 2014, 10:32 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | module move |
TM#1 with UC#9 has been moved from the west target station to the south hot cell. |
700
|
Tuesday, July 08, 2014, 09:57 |
David Wang | ITE | Standard Operation | TM3 | | 5 Shielding blocks have been transferred from ITW to ITE. |
5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam. |
699
|
Monday, July 07, 2014, 14:45 |
Grant Minor | ITE | Maintenance | TM3 | SiC #30 | FEBIAD gas line check |
There were some problems this morning with provision of FEBIAD gas to the the target at ITE. It was suspected that the gas line was improperly connected to the module, or that the valves at the module were not opened.
Remote Handling was asked to open the HV cover on TM3 at ITE and check the connection of the FEBIAD gas line. Grant Minor, Maico Dalla Valle, Dan McDonald, and Anders Mjos entered the Target Hall before lunch on Work Permit I2014-07-07-1.
Maico entered ITE with suit and respirator, disengaged / disconnected the interlocks and removed the HV cover. He inspected the FEBIAD gas line and found that it was properly connected, and that the valves were both open. The gas line is shown in the attached image, with both valves marked in red.
Grant and Anders went into the electrical room to examine the supply gas bottle and supply circuit, and found that the supply gas pressure to the regulating valve was low. It was concluded that the problem was not at the Target Module / Target Station.
Grant returned to the Target Station and instructed Maico to replace the HV cover. After this was done, Grant confirmed with Jon Aoki over the phone that the interlock switch signals were both reading "OK".
Friedhelm Ames made an entry in today's ISAC Ops e-log regarding the supply pressure to the regulating valve.
ISAC E-log
|
Attachment 1: ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg
|
|
698
|
Wednesday, July 02, 2014, 14:29 |
David Wang | ITE | Standard Operation | | | Reconnected TM3 in ITE. |
I reconnected TM3 in ITE. All turbo pumps have been started. The water supply to TM3 only in ITE. The HV keys are back to electrical room. |
697
|
Wednesday, July 02, 2014, 09:02 |
Travis Cave | ITE | Standard Operation | TM3 | SiC#30 | module move |
TM#3 with SiC#30 has been moved from the conditioning station to the east target station. |
696
|
Friday, June 27, 2014, 11:26 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | | Ground Electrode Cleaned |
Anders Mjos wrote: |
See attached pdf and DocuShare for more photos. It may be possible to clean some of it from the Ground Electrode.
|
Chad cleaned the GND electrode yesterday June 26th - see attached PDF. Photos on DocuShare. |
Attachment 1: TM3_GND_Electrode_Cleaning.pdf
|
|
695
|
Friday, June 27, 2014, 10:16 |
David Wang | Conditioning Station | Standard Operation | TM3 | | TM3 HS water lines helium pressure test. at CS |
TM3 HS water line helium pressure test is done at CS. 70 psi helium , 3 minutes.Base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 torr. No response. The line is leak free. |
694
|
Thursday, June 26, 2014, 14:18 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | SiC#30 | module move |
TM#3 with SiC#30 has been moved from the south hot cell to the conditioning station. |
693
|
Thursday, June 26, 2014, 11:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | SiC#30 | Electrical check |
Electrical check of the TM#3 with SiC#30 attached. Also an electrical check of TM#3 after the cleaning of ground electrode with no target attached. |
Attachment 1: TM3_SiC30_elecSHC.PDF
|
|
Attachment 2: TM3_elecchkaftclean.PDF
|
|
692
|
Thursday, June 26, 2014, 10:57 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Leak check on TM3 HS water line with new target. installed. |
Chad and I leak checked the TM3 HS water line with new target installed. No leak has been found during the check. Leak detector base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 torr. The line will be helium pressurized at CS later. |
691
|
Wednesday, June 25, 2014, 13:46 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Electrical check |
Electrical check of TM#3 after the insulator repair. See attached PDF for details. |
Attachment 1: TM3electestsinsulrepair.PDF
|
|
690
|
Wednesday, June 25, 2014, 12:55 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Object - possibly cable tie found in Containment Box |
See attached PDF. The object is not accessible with only the front panel removed. Photos on DocuShare. |
Attachment 1: TiC#4_Cable_Tie.pdf
|
|