Tuesday, June 17, 2014, 10:46, David Wang, ITW, Standard Operation, TM1, UC#9, 5 Shielding blocks have been transferred from ITE to ITW.
|
5 shielding blocks have been transferred from ITE to ITW. ITW is configured to take proton beam. Argon venting system for ITW is ready also. |
Friday, June 13, 2014, 10:33, Anders Mjos, ITW, Development, TM1, UC#9, Flow meter data
|
Coil not used on TM1. Data and plots on DocuShare
Friday, June 13, 2014, 10:30. ITE receving p+
|
Temp [C] |
Flow [lpm] |
HS |
30.0 |
6.3 |
COIL |
30.2 |
11.6 |
Monday, June 16, 2014, 09:30: p+ off for maintenance day
|
Temp [C] |
Flow [lpm] |
HS |
32.7 |
6.3 |
COIL |
27.7 |
11.6 |
Thursday, June 19, 2014, 16:14: 10 uA p+ on ITW
|
Temp [C] |
Flow [lpm] |
HS |
31.9 |
7.2 |
COIL |
27.6 |
13.1 |
Tuesday, July 08, 2014, 10:32:
Data uploaded to DocuShare |
Thursday, June 12, 2014, 09:42, Travis Cave, Spent Target Vault, Standard Operation, , , Targets moved from mini storage to F-308s
|
Five targets have been moved from the spent target storage to the mini storage. The targets that were moved are UCx #'s 6,7,8 , SiC #28, and Nb #6. |
Tuesday, June 10, 2014, 14:02, David Wang, ITW, Standard Operation, TM1, UC9#, TM1 and ITW turbo pumps have been started.
|
TM1 has been connected to ITW. It is pumping down in ITW with 6 turbo-pumps on. |
Tuesday, June 10, 2014, 13:20, Travis Cave, ITW, Standard Operation, TM1, UC#9, module move
|
TM#1 with UC#9 moved from the conditioning station to west station. |
Tuesday, June 10, 2014, 07:57, David Wang, Conditioning Station, Standard Operation, TM1, UC#9, TM1 are vented with argon and disconnected at CS.
|
TM1 will be moved to ITW this morning. |
Monday, June 09, 2014, 10:33, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, Stop TM1 and CS trubo pumps and ruff pump.
|
The CS and TM1 is still under vacuum. They will be vented with argon tomorrow mornig |
Tuesday, June 03, 2014, 09:12, David Wang, Conditioning Station, Standard Operation, TM1, UC9#, TM1 HS line helium pressure test and TM1 electrical check at CS 7x
|
TM1 HS line helium pressure test and TM1 electrical check at CS under vacuum are finished. Everything is good. See attachment |
Monday, June 02, 2014, 15:40, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 and CS turbo pumps have been started
|
TM1 and CS turbo pumps have been started. The vacuum readings are fine on all gauges. |
Monday, June 02, 2014, 13:53, Travis Cave, Conditioning Station, Standard Operation, TM1, UC#9, module move
|
TM#1 with UC#9 has been moved from the south hot cell to the conditioning station. |
Monday, June 02, 2014, 11:59, David Wang, South Hot-Cell, Standard Operation, TM1, , Leak check on TM1 HS water line with new UC9# target installed
|
Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure test on it at CS later. |
Monday, June 02, 2014, 11:28, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#9, Electrical check
|
TM#1 with UC#9 electrical check see attached pdf for details. |
Monday, June 02, 2014, 11:25, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx #9, UCx #9 Installed
|
UCx #9 has been installed. |
Monday, June 02, 2014, 10:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move
|
TM#1 with no target has been moved from the north west silo to the south hot cell. |
Friday, May 30, 2014, 09:41, Travis Cave, Spent Target Vault, Standard Operation, , Ta#42, Spent target move
|
Ta#42 in pail #114 has been moved from the south hot cell to the spent target storage vault and place in spot 7B. The target was 277mSv/hr upon removal from the south hot cell. See attached PDF of vault status. |
Wednesday, May 28, 2014, 08:48, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move
|
TM#4 with no target has been moved from the south hot cell to the south west silo. |
Tuesday, May 27, 2014, 11:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#42, Electrical check
|
TM#4 electrical check with Ta#42 attached post beam at the south hot cell. |
Tuesday, May 27, 2014, 10:42, Travis Cave, ITW, Standard Operation, TM4, Ta#42, module move
|
TM#4 with Ta#42 has been moved from the west target station to the south hot cell. |
Tuesday, May 27, 2014, 09:42, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 Maintenance
|
All of the serviced F-308's have been moved to the South Hot cell area. |
Tuesday, May 27, 2014, 09:38, maicodallavalle, Spent Target Vault, Maintenance, , F-308 Maintenance , F-308 Maintenance
|
All the F-308's can back from being certified at Nordion. All of the F-308's have been serviced and are ready to be filled with spent targets. |
|