  1008   Wednesday, July 22, 2015, 11:31 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical CheckElectrical check done on TM#2 around the
25th of June 2015, this was before the coil
line leak was found.
 TM#2elecchksourcetraynotgt62515.PDF 
  1007   Tuesday, July 21, 2015, 12:38 David WangITWRepair  ITW external water leak on dump circuit has been fixed.The leaking 1/8 NPT(M)-1/4NPT(F) adapter
on the ITW dump circuit is replaced.
  
  1006   Tuesday, July 21, 2015, 12:29 David WangITEMaintenance  target pit Hepa filterTarget pit Hepa filter has been replaced
today. There is 500 counts on swipe which
is taken inside of the replaced filter. The
  
  1005   Tuesday, July 21, 2015, 10:40 Grant MinorAssembly/Bench TestRepairTM2 TM2 - bench inspection photos from 6-June-2015   TM2_Source_Tray_Bench_Inspection_6-June-2015_04.JPGTM2_Source_Tray_Bench_Inspection_6-June-2015_13.JPGTM2_Source_Tray_Bench_Inspection_6-June-2015_11.JPG 
  1004   Tuesday, July 21, 2015, 09:21 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check FailedTM#2 has failed the electrical check see
attached pdf for details.
 TM#2_elec_chk_source_tray_no_tgt.PDF 
  1003   Monday, July 20, 2015, 17:11 Grant MinorSouth Hot-CellRepairTM2 TM2 New Source Tray - additional photos 20 July 2015A few additional higher-resolution photos
of the TM2 source tray with new spacer ITA6270,
and bent copper ground line clip.
 3-8ths_gap_check_15July2015.JPGTM2_New_Source_Tray_20July2015.JPGTM2_Spacer_ITA6270_and_copper_ground_clip_detail_20July2015.JPG 
  1002   Monday, July 20, 2015, 14:12 chad fisherSouth Hot-CellRepairTM2 TM2 StatusUltem high voltage spacer installed and
9 pin banana plug plugged in. Target has
been inserted into the hot cell and will
 20150720_134819.jpg20150720_135747.jpg20150720_140100.jpg 
  1001   Friday, July 17, 2015, 13:51 chad fisherSouth Hot-CellRepairTM2 TM2 StatusGas lines extensions installed yesterday
were too long and gas lines touched top inside
of containment box. They have been removed
 20150717_134123.jpg 
  1000   Thursday, July 16, 2015, 14:36 chad fisherSouth Hot-CellRepairTM2 TM2 StatusIMG gauge, clip for ground to window lines
and gas line extensions were installed today.
David and I also tried to locate
 20150716_110247.jpg20150716_142818.jpg 
  999   Thursday, July 16, 2015, 07:38 David WangITEStandard Operation  Target Hall Scheduled Activities April 07 - August 07 2015Update the TH schedule according to present
TM2 refurbishment process. See attachments
1,2
 Target_Hall_Scheduled_Activities__Apr_07_to_Aug_07.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_07.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp 
  998   Wednesday, July 15, 2015, 11:18 David WangSouth Hot-CellRepairTM2 leak check coil line(R,U) on TM2 at SHCChad and I leak checked the coil 1 circuit(R,U)
after rebuilt coil line is installed on TM2
source tray. The pumping down on the circuit
 007.JPG008.JPG 
  997   Wednesday, July 15, 2015, 11:02 chad fisherSouth Hot-CellRepairTM2 TM2 Coil Line Vacuum Leak CheckTM2 coil line R,U has been vacuum leaked
check at the hot cell and has passed with
no response from the leak detector.
  
  996   Wednesday, July 15, 2015, 09:44 chad fisherSouth Hot-CellRepairTM2 Coil Line replacementwater block jig installed, module side
sealing surfaces re-polished and cleaned.
Coil line inserted into the hot cell and
 TM2_20150715_093157.jpgTM2_20150715_094745.jpg 
  995   Tuesday, July 14, 2015, 12:56 chad fisherSouth Hot-CellRepairTM2 TM2 containment box removedContainment box was removed from Tm2 this
morning  in preparation for installation
of coil line and all the trimmings.
  
  994   Tuesday, July 14, 2015, 08:42 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule movedTM#2, no target, has been moved from the
north east silo to the south hot cell.
  
  993   Monday, July 13, 2015, 11:31 Travis CaveConditioning StationStandard OperationTM1no targetModule movedTM#1 has been moved back to the south west
silo from the conditioning station.
  
  992   Friday, July 10, 2015, 14:41 Anders MjosConditioning StationMaintenanceTM1 Replaced roughing pump The roughing pump was replaced with
a more leak tight pump due to the discovery
of Rn-220 migration while roughing on TM1
  
  991   Friday, July 10, 2015, 09:33 chad fisherSouth Hot-CellRepairTM2 Coil Line DeconCoil line has been in RPG's ultrasonic
decon over night. Initial swipes this morning
picked up 5000 counts. It has been decontaminated
  
  990   Thursday, July 09, 2015, 14:02 David WangConditioning StationDevelopmentTM1 TM1 is pumping down at CSTM1 and CS  vacuum system are connected.
All turbo-pumps are started. The new TP1S
works fine also. The pumping down looks good
  
  989   Thursday, July 09, 2015, 13:51 chad fisherSouth Hot-CellRepairTM2 Coil line removal hot cellcoil line has been removed from the hot
cell. Initial decon was performed...after
it still appears to have approximately 200
  