768
|
Monday, October 20, 2014, 08:59 |
David Wang | Conditioning Station | Development | TM3 | | Started TCS water system. | I started TCS water system this morning
to check if the chillers work properly. |
|
767
|
Friday, October 17, 2014, 13:36 |
Anders Mjos | Conditioning Station | Maintenance | | | TCS:Chil staging not operational | NOTE: If cooling is required, the
compressors will have to be run manually.
Make sure to switch it off again when the |
|
766
|
Thursday, October 16, 2014, 15:40 |
Anders Mjos | Conditioning Station | Maintenance | | | Chiller unit | NOTE: If there is a problem with
the chiller unit (ie Fault 1 or Fault 2),
a power cycle may reset the VFDs for the |
|
765
|
Wednesday, October 15, 2014, 12:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 with no target has been moved from
the south hot cell to the south west silo. |
|
764
|
Tuesday, October 14, 2014, 17:19 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | No target | High Voltage Conditioning | Wednesday, October 14, 2014
The BIAS voltage was brought
up between 1:30pm and 5pm. Sparks tripped |
|
763
|
Tuesday, October 14, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Electrical check | Electrical check of TM#1 with no target
attached at the south hot cell see attached
PDF for details. |
|
762
|
Tuesday, October 14, 2014, 12:19 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW. | TM1 was disconnected in ITW this morning.
Heat shield circuit is purged. |
|
761
|
Tuesday, October 14, 2014, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check | TM#1 with ZrC#6 post beam electrical check
see attached pdf for results. |
|
760
|
Tuesday, October 14, 2014, 11:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | module move | TM#1 with ZrC#6 has been moved from ITW
to the south hot cell. |
|
759
|
Friday, October 10, 2014, 10:47 |
David Wang | Conditioning Station | Development | TM3 | | TM3 has been connected in CS | TM3 has been connected in CS. All water
supplies are bypassed theTM3 on the top of
the service cap. TM3 TP2 was difficult to |
|
758
|
Wednesday, October 08, 2014, 09:39 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move | TM#3 has been moved from the North West
Silo to the conditioning station. |
|
757
|
Friday, September 26, 2014, 10:56 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#10 | Spent target move | UC#10 has been moved from the south hot
cell to the spent target vault. It was placed
in Pail #119 and in slot 8B. For further |
|
756
|
Wednesday, September 24, 2014, 15:16 |
David Wang | ITE | Standard Operation | TM4 | Ta#44 | Reconnected TM4 in ITE. | TM4 has been reconnected back to ITE. I
started all turbo pumps on ITE and TM4. The
ITE TP4s was extremely difficult to start. |
|
755
|
Wednesday, September 24, 2014, 15:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#44 | Leak check on TM4 HS water line with new Ta#44 target. at SHC | This morning Chad and I leak checked TM4
HS line with new Ta#44 target installed.
I calibrated LD before the check. Before |
|
754
|
Wednesday, September 24, 2014, 10:41 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#44 | module move | TM#4 with Ta#44 has been moved from the
south hot cell to the east target station. |
|
753
|
Tuesday, September 23, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10, Ta#44 | Electrical check | Electrical checks of TM#4 with UC#10 post
beam and Ta#44 before beam see attached PDF
for details. |
|
752
|
Tuesday, September 23, 2014, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#44 | Ucx10 removed Ta#44 installed | Ucx#10 has been removed from TM4 and placed
in a pail with argon.
Ta#44 has been installed onto TM4 |
|
751
|
Tuesday, September 23, 2014, 11:49 |
David Wang | ITE | Standard Operation | TM4 | UCx #10 | TM4 has been disconnected in ITE. | TM4 has been disconnected and moved to
SHC from ITE. ITE was vented with argon before
move. |
|
750
|
Tuesday, September 23, 2014, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | module move | TM#4 with UC#10 has been moved from the
east target station to the south hot cell. |
|
749
|
Tuesday, September 16, 2014, 10:41 |
David Wang | ITW | Standard Operation | TM1 | ZrC #4 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 Shielding blocks have been transferred
from ITE to ITW. The ITW is configured to
take proton beam |
|