  761   Tuesday, October 14, 2014, 11:52 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6Electrical checkTM#1 with ZrC#6 post beam electrical check
see attached pdf for results.
 TM1_ZrC6_postbeam.PDF 
  760   Tuesday, October 14, 2014, 11:51 Travis CaveSouth Hot-CellStandard OperationTM1ZrC#6module moveTM#1 with ZrC#6 has been moved from ITW
to the south hot cell.
  
  759   Friday, October 10, 2014, 10:47 David WangConditioning StationDevelopmentTM3 TM3 has been connected in CSTM3 has been connected in CS. All water
supplies are bypassed theTM3 on the top of
the service cap. TM3 TP2 was difficult to
  
  758   Wednesday, October 08, 2014, 09:39 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 has been moved from the North West
Silo to the conditioning station.
  
  757   Friday, September 26, 2014, 10:56 Travis CaveSpent Target VaultStandard Operation UC#10Spent target moveUC#10 has been moved from the south hot
cell to the spent target vault. It was placed
in Pail #119 and in slot 8B. For further
 Vault_Storage_September_26_2014.pdf 
  756   Wednesday, September 24, 2014, 15:16 David WangITEStandard OperationTM4Ta#44Reconnected TM4 in ITE.TM4 has been reconnected back to ITE. I
started all turbo pumps on ITE and TM4. The
ITE TP4s was extremely difficult to start.
  
  755   Wednesday, September 24, 2014, 15:03 David WangSouth Hot-CellStandard OperationTM4Ta#44Leak check on TM4 HS water line with new Ta#44 target. at SHCThis morning Chad and I leak checked TM4
HS line with new Ta#44 target installed.
I calibrated LD before the check. Before
  
  754   Wednesday, September 24, 2014, 10:41 Travis CaveITEStandard OperationTM4Ta#44module moveTM#4 with Ta#44 has been moved from the
south hot cell to the east target station.
  
  753   Tuesday, September 23, 2014, 13:31 Travis CaveSouth Hot-CellStandard OperationTM4UC#10, Ta#44Electrical checkElectrical checks of TM#4 with UC#10 post
beam and Ta#44 before beam see attached PDF
for details.
 TM4_UC10_postbeam_shc.PDFTM4_Ta44_elecchk_shc.PDF 
  752   Tuesday, September 23, 2014, 12:24 chad fisherSouth Hot-CellStandard OperationTM4Ta#44Ucx10 removed Ta#44 installedUcx#10 has been removed from TM4 and placed
in a pail with argon.
Ta#44 has been installed onto TM4
  
  751   Tuesday, September 23, 2014, 11:49 David WangITEStandard OperationTM4UCx #10TM4 has been disconnected in ITE.TM4 has been disconnected and moved to
SHC from ITE. ITE was vented with argon before
move.
  
  750   Tuesday, September 23, 2014, 10:50 Travis CaveSouth Hot-CellStandard OperationTM4UC#10module moveTM#4 with UC#10 has been moved from the
east target station to the south hot cell.
  
  749   Tuesday, September 16, 2014, 10:41 David WangITWStandard OperationTM1ZrC #45 Shielding blocks have been transferred from ITE to ITW.5 Shielding blocks have been transferred
from ITE to ITW. The ITW is configured to
take proton beam
  
  748   Monday, September 15, 2014, 11:23 Travis CaveSpent Target VaultStandard Operation  Spent target field measurementsField measurements on the spent target
has finished see the attached PDF for details.
 Vault_Storage_September_15_2014.pdf 
  747   Friday, September 12, 2014, 14:21 Travis CaveSpent Target VaultStandard Operation  Spent target field measurementsFive of the ten target we want to measure
the fields on were done today. We will finish
up on Monday, and the spent target storage
  
  746   Wednesday, September 10, 2014, 11:47 David WangITWStandard OperationTM1 TM1 has been connected in ITW.TM1 has been connected in ITW.  ITW
and TM1 turbo pumps have been started. Water
is supplied to TM1 only. Everything is good
  
  745   Wednesday, September 10, 2014, 08:52 Travis CaveITWStandard OperationTM1ZrC#6module moveTM#1 with ZrC#6 has been moved from the
conditioning station to west target station.
  
  744   Wednesday, September 10, 2014, 07:12 David WangITWRepairTM1 Removed ITW HS and COIL flow rate monitors.Removed ITW HS and COIL flow rate monitors
installed at the beginning of this year.
They were installed on these two circuits
  
  743   Monday, September 08, 2014, 13:44 David WangConditioning StationStandard OperationTM1ZrC#6TM1 is disconnected at CS.Stopped TM1 and CS turbo pumps. Disconnected
TM1 at CS. The CS and TM1 are under vacuum
and naturally leak up. I will vent it on
  
  742   Friday, September 05, 2014, 13:07 Travis CaveSpent Target VaultStandard Operation Ta#43Spent target moveTa#43 has been moved from the south hot
cell to the spent target vault. See attached
PDF for details.
 Vault_Storage_September_5_2014.pdf 