  515   Monday, October 21, 2013, 12:29 Bevan MossConditioning StationRepairTM4 BIAS Canbus There is something wrong with the
BIAS canbus controller. It says that it is
not alive and has timed out. I have tried
  
  514   Monday, October 21, 2013, 10:52 Bevan MossConditioning StationStandard OperationTM4 Cooling On and Electrical Connections Made The electrical connection have been
made and cooling package was started at ~10:50am
today
  
  513   Friday, October 18, 2013, 15:55 Bevan MossConditioning StationStandard OperationTM4 Turbo Pumps are on The Turbo pumps are now running on
TCS
  
  512   Friday, October 18, 2013, 14:56 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical checkWith the coil line removed an electrical
check was done on TM#4 at the South Hot Cell
see attached pdf.
 TM#4_no_target_post_coilelectest.PDF 
  511   Friday, October 18, 2013, 14:37 Bevan MossConditioning StationStandard OperationTM4 Roughing Started The roughing pump has been started.   
  510   Friday, October 18, 2013, 14:33 Bevan MossSouth Hot-CellStandard OperationTM4 Module move TM4 without a source tray was moved
from the SHC to the TCS.  All went well.
  
  509   Friday, October 18, 2013, 13:43 chad fisherSouth Hot-CellRepairTM4 C2 Circuit RemovalThe C2 circuit (coil 2) water lines and
blocks have been revoed from TM4.
Water block jig could not be used
 IMG_1224[1].JPGIMG_1227[1].JPGIMG_1230[1].JPG 
  508   Friday, October 18, 2013, 10:17 Bevan MossITWRepair  Paddle Wheel Yesterday I visually inspected the
paddle wheel and noticed that it was spinning
freely and constant. As the signal was intermittent
  
  507   Thursday, October 17, 2013, 17:16 Grant MinorITERepair  Pre-Separator-area (ITE Harp 9) Blocks ReplacedThe pre-separator-area blocks were replaced
today by Bevan and Travis, with Grant present
for photos and observation.
 8x 
  506   Thursday, October 17, 2013, 10:24 chad fisherSouth Hot-CellRepairTM4 Coil Line RemovalThe containment box was removed from TM4
earlier this morning in preparation for removal
of the C2 circuit water lines, their
 TM4_C2_circuit.pdf 
  505   Wednesday, October 16, 2013, 18:53 Grant MinorITERepair  ITE Harp 9 Removed & Blanked-Off - blocks NOT YET replacedThe blocks above the pre-separator section
of the ISAC beam lines     were removed today
in the Target Hall by Bevan Moss and Chad
 11x 
  504   Wednesday, October 16, 2013, 10:12 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 with no target has been moved from
the south west silo to the south hot cell.
  
  503   Tuesday, October 15, 2013, 16:44 Grant MinorCraneRepair  Target Hall Crane - operational with temporary thermal sensor bypassE-mail correspondence on the Target Hall
crane fault diagnosis between October 11th
and 15th:
 ISAC_THall_Crane_elec_E5_1slash1_15Oct2013.pdf 
  502   Tuesday, October 15, 2013, 15:34 Bevan MossITEStandard OperationTM3 Blocks moved from ITW to ITE Blocks 1-4 have been moved from ITW
to ITE. Block 5 was moved to a storage area
as it will be in the way of the harp repair.
  
  501   Wednesday, October 09, 2013, 19:33 Grant MinorCraneRepairTM4 Target Hall Crane not operational - likely controls / PLC hardware failure (not stuck wheel)

    

       
            
  
  500   Tuesday, October 08, 2013, 18:12 Grant MinorCraneRepairTM4 Target Hall Crane Stuck in East-West Direction - UpdateGrant Minor wrote this e-mail today:
***
Hello all,
 THall_Crane_Bridge_Wheel_at_South_Rail_Splice_8Oct2013.JPGNORELCO_inv13045_joMS-064_31March2013.pdf 
  499   Tuesday, October 08, 2013, 14:58 Anders MjosSouth Hot-CellStandard Operation SiC#29Target to Heat Shield electrical shortThe SiC#29 CTL target has been taken apart
with the help of Isaac and Chad. Electrical
measurements were done between Target and
  
  498   Tuesday, October 08, 2013, 14:55 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 with no target was to be moved today
but the move was aborted when the crane failed
to move in the East - West direction. The
  
  497   Tuesday, October 08, 2013, 13:11 Travis CaveSpent Target VaultStandard Operation SiC#29Spent target moveSiC#29 has been moved to the spent target
vault. The target was placed in Pail #109
and placed into slot 2B it was 24.7mS/hr
 Vault_Storage_October_8_2013.pdf 
  496   Monday, October 07, 2013, 12:06 Travis CaveITEStandard OperationTM3NiO#2module moveTM#3 has been moved from the conditioning
station to the east target station, move
went well.
  