  521   Wednesday, October 23, 2013, 09:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#7module moveTM#1 with UC #7 has been moved from the
south west silo to the south hot cell.
  
  520   Tuesday, October 22, 2013, 17:07 Bevan MossConditioning StationStandard Operation  services shut down The turbo pump, roughing pump, have
been turned off and the valves for venting
opened. The cooling package has also been
  
  519   Tuesday, October 22, 2013, 17:04 Bevan MossConditioning StationStandard OperationTM4 HV testing This afternoon TM4 with the coil
removed was tested with HV. The EINZEL LENS
was first tested independently while the
 22102013_TM4_Coil_removed_EL_testing_(1).txt 
  518   Tuesday, October 22, 2013, 16:52 Bevan MossConditioning StationRepair  Canbus base card for BIAS  The base card in the canbus BIAS
module was determined to be faulty. Dave
Morris removed a card VECC to repair the
  
  517   Tuesday, October 22, 2013, 14:23 Anders MjosITEStandard OperationTM3NiO#2Padlle wheel frequency measurementsas measured today in the electrical room
by David and Anders
 ITE-TM3-NiO#2-HP-FEBIAD_Water_Flow.pdf 
  516   Tuesday, October 22, 2013, 11:18 Travis CaveITWStandard OperationTM1UC#7module moveTM#1 with UC#7 has been moved from the
ITW to the south west silo.
  
  515   Monday, October 21, 2013, 12:29 Bevan MossConditioning StationRepairTM4 BIAS Canbus There is something wrong with the
BIAS canbus controller. It says that it is
not alive and has timed out. I have tried
  
  514   Monday, October 21, 2013, 10:52 Bevan MossConditioning StationStandard OperationTM4 Cooling On and Electrical Connections Made The electrical connection have been
made and cooling package was started at ~10:50am
today
  
  513   Friday, October 18, 2013, 15:55 Bevan MossConditioning StationStandard OperationTM4 Turbo Pumps are on The Turbo pumps are now running on
TCS
  
  512   Friday, October 18, 2013, 14:56 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical checkWith the coil line removed an electrical
check was done on TM#4 at the South Hot Cell
see attached pdf.
 TM#4_no_target_post_coilelectest.PDF 
  511   Friday, October 18, 2013, 14:37 Bevan MossConditioning StationStandard OperationTM4 Roughing Started The roughing pump has been started.   
  510   Friday, October 18, 2013, 14:33 Bevan MossSouth Hot-CellStandard OperationTM4 Module move TM4 without a source tray was moved
from the SHC to the TCS.  All went well.
  
  509   Friday, October 18, 2013, 13:43 chad fisherSouth Hot-CellRepairTM4 C2 Circuit RemovalThe C2 circuit (coil 2) water lines and
blocks have been revoed from TM4.
Water block jig could not be used
 IMG_1224[1].JPGIMG_1227[1].JPGIMG_1230[1].JPG 
  508   Friday, October 18, 2013, 10:17 Bevan MossITWRepair  Paddle Wheel Yesterday I visually inspected the
paddle wheel and noticed that it was spinning
freely and constant. As the signal was intermittent
  
  507   Thursday, October 17, 2013, 17:16 Grant MinorITERepair  Pre-Separator-area (ITE Harp 9) Blocks ReplacedThe pre-separator-area blocks were replaced
today by Bevan and Travis, with Grant present
for photos and observation.
 8x 
  506   Thursday, October 17, 2013, 10:24 chad fisherSouth Hot-CellRepairTM4 Coil Line RemovalThe containment box was removed from TM4
earlier this morning in preparation for removal
of the C2 circuit water lines, their
 TM4_C2_circuit.pdf 
  505   Wednesday, October 16, 2013, 18:53 Grant MinorITERepair  ITE Harp 9 Removed & Blanked-Off - blocks NOT YET replacedThe blocks above the pre-separator section
of the ISAC beam lines     were removed today
in the Target Hall by Bevan Moss and Chad
 11x 
  504   Wednesday, October 16, 2013, 10:12 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 with no target has been moved from
the south west silo to the south hot cell.
  
  503   Tuesday, October 15, 2013, 16:44 Grant MinorCraneRepair  Target Hall Crane - operational with temporary thermal sensor bypassE-mail correspondence on the Target Hall
crane fault diagnosis between October 11th
and 15th:
 ISAC_THall_Crane_elec_E5_1slash1_15Oct2013.pdf 
  502   Tuesday, October 15, 2013, 15:34 Bevan MossITEStandard OperationTM3 Blocks moved from ITW to ITE Blocks 1-4 have been moved from ITW
to ITE. Block 5 was moved to a storage area
as it will be in the way of the harp repair.
  