508
|
Friday, October 18, 2013, 10:17 |
Bevan Moss | ITW | Repair | | | Paddle Wheel | Yesterday I visually inspected the
paddle wheel and noticed that it was spinning
freely and constant. As the signal was intermittent |
|
507
|
Thursday, October 17, 2013, 17:16 |
Grant Minor | ITE | Repair | | | Pre-Separator-area (ITE Harp 9) Blocks Replaced | The pre-separator-area blocks were replaced
today by Bevan and Travis, with Grant present
for photos and observation. |
8x |
506
|
Thursday, October 17, 2013, 10:24 |
chad fisher | South Hot-Cell | Repair | TM4 | | Coil Line Removal | The containment box was removed from TM4
earlier this morning in preparation for removal
of the C2 circuit water lines, their |
|
505
|
Wednesday, October 16, 2013, 18:53 |
Grant Minor | ITE | Repair | | | ITE Harp 9 Removed & Blanked-Off - blocks NOT YET replaced | The blocks above the pre-separator section
of the ISAC beam lines were removed today
in the Target Hall by Bevan Moss and Chad |
11x |
504
|
Wednesday, October 16, 2013, 10:12 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target has been moved from
the south west silo to the south hot cell. |
|
503
|
Tuesday, October 15, 2013, 16:44 |
Grant Minor | Crane | Repair | | | Target Hall Crane - operational with temporary thermal sensor bypass | E-mail correspondence on the Target Hall
crane fault diagnosis between October 11th
and 15th: |
|
502
|
Tuesday, October 15, 2013, 15:34 |
Bevan Moss | ITE | Standard Operation | TM3 | | Blocks moved from ITW to ITE | Blocks 1-4 have been moved from ITW
to ITE. Block 5 was moved to a storage area
as it will be in the way of the harp repair. |
|
501
|
Wednesday, October 09, 2013, 19:33 |
Grant Minor | Crane | Repair | TM4 | | Target Hall Crane not operational - likely controls / PLC hardware failure (not stuck wheel) |
|
|
500
|
Tuesday, October 08, 2013, 18:12 |
Grant Minor | Crane | Repair | TM4 | | Target Hall Crane Stuck in East-West Direction - Update | Grant Minor wrote this e-mail today:
***
Hello all, |
|
499
|
Tuesday, October 08, 2013, 14:58 |
Anders Mjos | South Hot-Cell | Standard Operation | | SiC#29 | Target to Heat Shield electrical short | The SiC#29 CTL target has been taken apart
with the help of Isaac and Chad. Electrical
measurements were done between Target and |
|
498
|
Tuesday, October 08, 2013, 14:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target was to be moved today
but the move was aborted when the crane failed
to move in the East - West direction. The |
|
497
|
Tuesday, October 08, 2013, 13:11 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#29 | Spent target move | SiC#29 has been moved to the spent target
vault. The target was placed in Pail #109
and placed into slot 2B it was 24.7mS/hr |
|
496
|
Monday, October 07, 2013, 12:06 |
Travis Cave | ITE | Standard Operation | TM3 | NiO#2 | module move | TM#3 has been moved from the conditioning
station to the east target station, move
went well. |
|
495
|
Sunday, October 06, 2013, 20:28 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM3 | NiO#2 | turbo pumps stopped | vacuum readings before stopping
IG1: 7.4e-7 T
IG2 3.8 e-6 T |
|
494
|
Sunday, October 06, 2013, 17:08 |
Friedhelm Ames | Conditioning Station | Development | TM3 | NiO#2 | trip of all power supplies | All power supplies tripped on high conductivity
of the cooling water < 5 MOhm, It is not
clear if this was caused by a spark or vice |
|
493
|
Sunday, October 06, 2013, 15:39 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM3 | NiO#2 | HEATERS STARTED | The high voltage was sparking several times
during the night. It may be correlated with
the cycling of the cooling water temperature |
|
492
|
Sunday, October 06, 2013, 00:17 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM3 | NiO#2 | high voltage conditioning | high voltage conditioning was carried out
over the day up to 24 kV. i will leave it
at 20 kV over night. Current is at 22 micro |
|
491
|
Saturday, October 05, 2013, 14:45 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM3 | NiO#2 | vacuum readings | IG1
8.0 e-7 T |
|
490
|
Friday, October 04, 2013, 19:39 |
Grant Minor | Conditioning Station | Standard Operation | TM3 | NiO#2 | TCS vacuum improvement w/ heaters off - 2:20 pm to 7:17pm | Here is the change in the TCS vacuum after
heaters were turned off earlier today:
2:20 pm readings |
|
489
|
Friday, October 04, 2013, 19:05 |
Grant Minor | Conditioning Station | Standard Operation | TM3 | NiO#2 | HP Conditioning - e-mail notes from Oct 2nd to Oct 4th | I have compiled the e-mail comments from
people involved in High-Power Conditioning
of TM3 w/ the new Rev 3 source tray and NiO#2 |
|