|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
2261
|
Friday, October 29, 2021, 12:27 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#56 | Repacking of the target. | Ta#56 in pail #169 was repacked and
placed into #269 and was placed in the mini
vault at the back. It was 3.86mSv/hr upon |
|
|
2260
|
Tuesday, October 26, 2021, 11:01 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | shielding blocks transfer | the five shielding blocks have been
moved from ITW to ITE. |
|
|
2259
|
Wednesday, October 13, 2021, 11:54 |
Travis Cave | North Hot-Cell | Standard Operation | | SiC#41 | Spent Target Move | The spent SiC#41 target has been
placed in pail #260 and placed in spot 5B
of that spent target vault. See attached |
|
|
2258
|
Friday, October 08, 2021, 12:39 |
Frank Song | ITE | Standard Operation | TM4 | UCx#35 | Module Connection | the module with target UC#35 was
connected in ITE and being pumped down. |
|
|
2257
|
Friday, October 08, 2021, 11:19 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#35 | TM4 IGLIS target electrical tests | the tests were done when TM4 was
on NHC. see attached photos please. |
|
|
2256
|
Wednesday, October 06, 2021, 10:42 |
David Wang | ITE | Repair | | | ITE IG1S cable end connector replacement | ITE IG1S cable end connector replacement
has been finished by Roy Huang. |
|
|
2255
|
Monday, October 04, 2021, 10:52 |
Travis Cave | North Hot-Cell | Standard Operation | TM4 | SiC#41 | Module move | TM#2 moved from ITE to NHC SiC#41
removed and then moved back to ITE. |
|
|
2254
|
Monday, October 04, 2021, 09:37 |
Frank Song | ITE | Standard Operation | TM4 | Sic#41 | module disconnection | TM4 was disconnected and moved to
NHC. |
|
|
2253
|
Monday, October 04, 2021, 09:33 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | C#3 | TM2 with target connection test | the test was done when TM2 sit on
NHC. |
|
|
2252
|
Monday, October 04, 2021, 09:27 |
Frank Song | ITW | Standard Operation | TM2 | C#3 | Module Connection | TM2 been connected with new target
C#3 in ITW. |
|
|
2251
|
Monday, September 27, 2021, 14:29 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #3 | Module move | TM#2 with C#3 has been moved from
the north hot cell to ITW. Also for the up
coming site wide power outage, the ISAC Target |
|
|
2250
|
Thursday, September 23, 2021, 19:04 |
Adam Newsome | Spent Target Vault | Development | | | Mini-Storage: Remote Capability | Remote capability was added for the mini-storage
door control. The control signals originate
from the Opto 22 Module box that is used |
|
|
2249
|
Wednesday, September 22, 2021, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#34 | Spent Target Move | The spent UC#34 target was moved
from the north hot cell to the spent target
vault. See attached PDF for details. |
|
|
2248
|
Tuesday, September 21, 2021, 13:47 |
Travis Cave | North Hot-Cell | Standard Operation | TM2 | UC#34 | Module move | TM#2 with UC#34 has been moved from
ITW to the north hot cell had the target
removed and then moved to the south west |
|
|
2247
|
Friday, September 17, 2021, 14:28 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#62 | Spent Target Move | The spent Ta#62 target along with
2A2M19 were placed in pail #256 and placed
in spot 7A of the spent target vault. See |
|
|
2246
|
Friday, September 17, 2021, 12:34 |
Frank Song | ITE | Standard Operation | TM4 | Sic#41 | Module Connection | TM4 with a new target was moved back
from NHC to ITE and reconnected at pit. The
5 shielding blocks were installed as well. |
|
|
2245
|
Friday, September 17, 2021, 12:20 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#41 | TM4 SIS with Target and No external Connections | TM4 electric check with new target
was done by David. A pic attached here for
ref. |
|
|
2244
|
Wednesday, September 15, 2021, 08:39 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#41 | Module move | TM#4 with SiC#41 has been moved from the
NHC to ITE. |
|
|
2243
|
Tuesday, September 14, 2021, 09:18 |
Travis Cave | South Hot-Cell | Repair | TM4 | SiC#40 | Module move | TM#4 with SiC#40 has been moved from the east
target station to the south hot cell. |
|
|
2242
|
Thursday, August 12, 2021, 14:13 |
Adam Newsome | ITW | Repair | | | West Entrance Module Move to ITW | The West Entrance Module has been moved
from the South Hot Cell to the West Target
Station. |
|