2108
|
Friday, June 19, 2020, 11:21 |
David Wang | ITE | Repair | TM4 | P2N test. | ITE TP3 is replaced. | ITE TP3 is replaced. ITE is under vacuum
again. All turbo pumps are started successfully.
Current draw on pumps are normal so far. |
|
2107
|
Thursday, June 18, 2020, 13:25 |
David Wang | ITE | Standard Operation | TM4 | P2N test. | Disconnect TM4 in ITE. | TM4 has been disconnected in ITE. Vacuum
pumps and gauge are not disconnected yet.
|
|
2106
|
Thursday, June 18, 2020, 13:22 |
David Wang | ITW | Standard Operation | TM2 | C#1 | Remove of TM2 from ITE to SHC. | Remotely remove TM2 from ITW to SHC. The
move is good. Shielding plug is put
back to ITW. |
|
2105
|
Thursday, June 18, 2020, 09:11 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #1 | Module move | TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station. |
|
2104
|
Wednesday, June 17, 2020, 09:53 |
David Wang | South Hot-Cell | Standard Operation | TM2 | C#1 | C#1 target electrical check and leak check at SHC. | Target to HS is 400 ohm. The rest check
is good. See attachment. |
|
2103
|
Wednesday, June 17, 2020, 09:49 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | C#1 | C#1 installed | Target C#1 has been installed on TM4 with
new high current fasteners torqued to 130in
lbs. |
|
2102
|
Tuesday, June 16, 2020, 09:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 with no target has been moved
from the south west silo to the south hot
cell. |
|
2101
|
Thursday, June 11, 2020, 12:36 |
David Wang | Safe Module Parking | Repair | TM3 | | TM3 containment box and service tray field measurement. | At 15cm distance: Containment box |
|
2100
|
Thursday, June 11, 2020, 11:49 |
David Wang | ITE | Maintenance | | | ITW and ITE thermocouple status. | |
|
2099
|
Thursday, June 04, 2020, 10:51 |
David Wang | Conditioning Station | Standard Operation | | | TH floor mop up. | Jason Sargeant mopped up TH floor this
morning. The mop head was checked after the
job. There are 1500 counts on it. He think |
|
2098
|
Thursday, June 04, 2020, 10:40 |
David Wang | Conditioning Station | Maintenance | | | Three manual valves are closed on TCS water system | Three manual valves are closed on TCS water
system return line in experimental hall.
See attachments. It is for TCS TK2 water |
|
2097
|
Monday, June 01, 2020, 12:46 |
David Wang | ITE | Maintenance | | | ITH:CM6 ,CM6S and ITM:CM3 calibration. | Edi calibrated ITH:CM6, CM6S and ITM:CM3.
By the same time, ITH:MP1 and MP2
lubricate oil level are checked. Everything |
|
2096
|
Monday, June 01, 2020, 12:40 |
David Wang | Crane | Maintenance | | | TH crane festoon cable maintenance | Tom Kauss corrected the TH crane
festoon cable loops. He lubricated festoon
cable wheels as well. The maintenance |
|
2095
|
Friday, May 22, 2020, 13:26 |
David Wang | ITW | Repair | | | ITW water leak. | A water leak was found on a fitting connecting
ITW dump return line pressure gauge on top
of exit module. TM tank flange, o-ring slot |
|
2094
|
Wednesday, May 20, 2020, 13:30 |
David Wang | Safe Module Parking | Maintenance | | | Silo area radio active waste clean up. | Sorted and packed one 55 gallon drum with
low contamination and active stuffs which
are placed around silo area in the past. |
|
2093
|
Wednesday, May 20, 2020, 13:19 |
David Wang | ITE | Maintenance | | | Restart of ITE turbo pumps. | PLC6 drop out in weekend caused the ITH
MP1 and MP1s stopped. ITE turbo pumps were
running still after that. Without back up |
|
2092
|
Wednesday, May 20, 2020, 13:08 |
David Wang | Cooling | Standard Operation | | | Start of HALCW sysytem | High active water pump is started.
The system resistance is recovering now.
Everything works fine so far. Check ITW and |
|
2091
|
Friday, March 27, 2020, 08:45 |
Matthew Gareau | North Hot-Cell | Maintenance | | | Issues with the manipulators | This is a link to all of the issues
with the NHC manipulators that I know of
|
|
2090
|
Thursday, March 19, 2020, 15:48 |
Anders Mjos | Conditioning Station | Maintenance | | | Filter replacement in water system March 5th | Filters were replaced by Curtis von Cube
on March 5th. See work permit for details
I2020-03-05-5 |
|
2089
|
Wednesday, March 18, 2020, 10:40 |
David Wang | ITE | Development | TM4 | | TM4 P2N target connection checklist. | TM4 has been connected in ITE. See checklist. |
|