2008
|
Thursday, October 17, 2019, 11:49 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#31,32 and UC#19,20,21 | Loading F-308 | The targets in the mini storage have
been loaded into the F-308. |
|
2007
|
Tuesday, October 15, 2019, 16:42 |
Isaac Earle | Safe Module Parking | Development | | | SMP flange alignment tested using shield plug | As a preliminary test in preparation
for SMP commissioning, one of the steel module
shield plugs was installed into the SMP to |
|
2006
|
Thursday, October 10, 2019, 16:17 |
Adam Newsome | Safe Module Parking | Development | | | SMP Main Panel: Relay Addition for E-Stop Circut | An update was made for the E-stop and power
supply system in the SMP main panel. Upon
testing remote control, it was determined |
|
2005
|
Wednesday, October 09, 2019, 13:28 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#27 | Spent Target Move | The spent target in the south hot
cell has been moved to the spent target vault.
It was placed in spot 1B of the vault in |
|
2004
|
Tuesday, October 08, 2019, 09:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#27 and UC#28 | Electrical Check | Results of the electrical check of
TM4 without target and with UC27 and 28 |
|
2003
|
Monday, October 07, 2019, 14:03 |
David Wang | ITE | Standard Operation | TM2 | Ta 59 | TM2 has been connected in ITE. | Tm2 with Ta 59 has eben connected in ITE.
Turbo pumps are started. See checklist |
|
2002
|
Monday, October 07, 2019, 09:56 |
Adam Newsome | ITE | Standard Operation | TM2 | Ta 59 | TM2 Move | TM2 has been moved from the Conditioning
Station to ITE with Ta#59 target. |
|
2001
|
Friday, October 04, 2019, 16:50 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | UCx 28 target with TM4 SHC leak check and electrical check. | TM4 HS Leak check result is good . No leak.
electrical check after target installation:
Bias to chassis 550 Mohm. Coils are shorted |
|
2000
|
Friday, October 04, 2019, 16:43 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 has been connected at TCS. | TM2 has been connected at TCS this morning.
helium pressure test on Tm2 HS line is done.
No leak. |
|
1999
|
Friday, October 04, 2019, 14:53 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#28 | Module move | TM#4 with UC#28 has been moved from
the south hot cell to the west target station. |
|
1998
|
Thursday, October 03, 2019, 10:25 |
Travis Cave | Spent Target Vault | Standard Operation | | ZrC#8 | Spent Target Move | The spent ZrC#8 was moved from the
south hot cell to the spent target vault.
It was placed in pail 217 and the pail was |
|
1997
|
Wednesday, October 02, 2019, 08:25 |
chad fisher | South Hot-Cell | Standard Operation | | ZrC#8 | ZrC#8 PIE | Heat shield has been removed from ZrC#8. |
|
1996
|
Tuesday, October 01, 2019, 16:30 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#58 | Conditioning of Ta#58 | Tuesday, October 01, 2019, 15:15: Started
roughing.
Tuesday, October 01, 2019, 16:30: |
|
1995
|
Tuesday, October 01, 2019, 14:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Electrical Check | The results of the electrical check
on TM#2 with the Ta#59 target and without
before the target was mounted on the module. |
|
1994
|
Tuesday, October 01, 2019, 10:22 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | ZrC#8 Removed Ta#59 installed | ZrC#8 has been removed from TM2. Upon removal
of the high current tube heater bolts it
was noticed that the tube was broken. Also |
|
1993
|
Tuesday, October 01, 2019, 09:23 |
Don Jackson | ITE | Maintenance | TM2 | ZrC #8 | 60KV Common Connections | 1 Jumpers between 60KV common and FEBIAD
lines were connected in an unusual way.
This should of had no impact on the ZrC run |
|
1992
|
Monday, September 30, 2019, 14:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Electrical Check | Results of the electrical check on
TM#2 with ZrC#8 post beam. |
|
1991
|
Monday, September 30, 2019, 11:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Module move | TM#2 with ZrC#8 has been moved from
the east station to the south hot cell. |
|
1990
|
Monday, September 30, 2019, 11:27 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum vessel modifications completed | The SMP vacuum vessel welds were reinforced
to match the specifications on IRH1710 Rev
D. In addition a tube stub was added |
|
1989
|
Monday, September 23, 2019, 13:21 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. | All targets in the mini vault have
been repackaged and are now ready to be loaded
into F-308s. All the target pails have new |
|