ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
1968
|
Friday, August 16, 2019, 14:23 |
Carla Babcock | ITE | Repair | TM2 | ZrC#8 | TM2 electrical checks in ITE | Ramped voltage on TM2 up to 30kV with no
problems. Bias current is at 29uA, same as
original TM2 bias current (see archiver for |
|
1967
|
Friday, August 16, 2019, 08:52 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 is moved from TCS to SW silo. | TM4 is moved from TCS to SW silo this morning.
The move is good. |
|
1966
|
Friday, August 16, 2019, 08:51 |
David Wang | Conditioning Station | Repair | TM4 | | TM4 waterlines helium pressure test at TCS. | LD base leak rate, 0.0Xe-9atm.cc/sec. Helium
pressure, 70psi. 5 minutes each circuit.
No response on all water line except containment |
|
1965
|
Friday, August 16, 2019, 08:46 |
David Wang | ITE | Standard Operation | TM4 | ZrC #8. | TM2 has been connected in ITE. | TM2 has been connected in ITE. turbo pumps
have been started. ITE and TM2 vacuum
are good. |
|
1964
|
Thursday, August 15, 2019, 09:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Electrical Check | Electrical of TM#2 with ZrC#8 at
the south hot cell. See attached for details. |
|
1963
|
Thursday, August 15, 2019, 09:36 |
Adam Newsome | ITE | Standard Operation | TM2 | ZrC #8 | TM2 Move | TM2 was moved from South Hot Cell to ITE.
ZrC #8 target. |
|
1962
|
Wednesday, August 14, 2019, 11:43 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 and no target. | Results of electrical checks post beam at the south hot cell. | Here are the results of the electrical
done at the south hot cell post beam of with
the Ta#58 target attached and with just the |
|
1961
|
Wednesday, August 14, 2019, 08:55 |
David Wang | ITE | Standard Operation | TM2 | | TM2 has been disconnected in ITE. | TM2 has been disconnected in ITE. The bias
jumper between U and T was burned out during
the last beam time. |
|
1960
|
Tuesday, August 13, 2019, 09:49 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | Ta 58 | TM2 Move | TM2 was moved from ITE to South Hot Cell.
Tantalum 58 target. |
|
1959
|
Thursday, August 08, 2019, 09:33 |
Carla Babcock | ITE | Development | TM2 | Ta#58 | TM2 HV conditioning with protons, round 1 | Starting HV tests on TM2 with 50uA of protons.
Tuesday, August 06, 2019, 03:37 :
Ramping up 500V every 2mins or so, couple |
|
1958
|
Tuesday, August 06, 2019, 01:13 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy HP SIS target | Checks on EE line leak fix and window line leak (not fixed) | TM4 has developed 4 leaks so far:
Line B - seems to be solved
with an indium gasket (some testing already |
|
1957
|
Wednesday, July 31, 2019, 08:57 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | No Target | TM4 Move | TM4 has been moved from the Conditioning
Station to the South Hot Cell. No target.
|
|
1956
|
Monday, July 29, 2019, 16:17 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy LP SIS | New leak on EE water line while testing new In seals | Original Problem:
Leaks on the B and D copper blocks,
probably due to corrosion between the blocks |
|
1955
|
Friday, July 26, 2019, 15:43 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum control system completed | The SMP vacuum control system has
been wired and setup to be controlled from
EPICS. Backing valve control (SMP:BV1) |
|
1954
|
Friday, July 26, 2019, 11:41 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 with spare target electrical check and leak check. | Electrical check on TM4 with spare test
target. PQ is still shorted to RU. But, The
short between 60KV bias and PQRU which we |
|
1953
|
Friday, July 26, 2019, 11:28 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 move from SHC to TCS. | Tm4 has been moved from SHc to TCS without
containment box. It is a new source tray
on TM4. A layer of plastic sheet was |
|
1952
|
Monday, July 22, 2019, 14:51 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | No Target | TM4 Move | TM4 has been moved from the South West
silo to the South Hot Cell. New source tray,
no target. |
|
1951
|
Tuesday, July 16, 2019, 08:44 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | no target | Module move | TM4 has been moved from the conditioning
station to the south west silo. Module was
placed with the turbo pump facing south which |
|
1950
|
Monday, July 15, 2019, 13:29 |
David Wang | Conditioning Station | Development | TM4 | | Vacuum surge when TM4 B line iwas supplied with water. | Yesterday, TM4 B line was supplied with
water at TCS for testing. TCS: IG1
and IG2 had big response on it. See attachment. |
|
1949
|
Wednesday, July 10, 2019, 11:59 |
Carla Babcock | Conditioning Station | Repair | TM4 | Dummy HP SIS target | Conditioning TM4 w/ new ST up to 50kV | David raised the bias to 49.5kV. Module
is still sparking mainly on top. Humidity