1408
|
Tuesday, November 29, 2016, 06:27 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS water pumps are stopped | Argon venting on TCS and TM2 is processing |
|
1407
|
Friday, November 25, 2016, 09:04 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#35 | Spent Target move | On November 24th 2016 the spent SiC#35
was moved from the south hot cell to the
spent target vault. see attached pdf for |
|
1406
|
Thursday, November 24, 2016, 10:30 |
David Wang | Conditioning Station | Standard Operation | TM2 | | HV cover is installed on TM2 at TCS | Interlock key are returned back to
B2 level.TM2 is ready for HV conditioning
and heating up at TCS. |
|
1405
|
Thursday, November 24, 2016, 09:33 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | UC#18 | Conditioning UC#18 | Thursday, November 24, 2016, 09:33: Water
package on
Thursday, November 24, 2016, 09:43: |
|
1404
|
Wednesday, November 23, 2016, 16:21 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 and TCS vacuum system has been connected. | All vacuum pumps have been started. Air
ballast 50seconds on roughing pump. Everything
is good so far. |
|
1403
|
Wednesday, November 23, 2016, 16:10 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on HS line. | Chad and I leak checked TM2 HS line with
new UCx target installed. Helium spray
2 seconds on each joint and 10seconds flushing |
|
1402
|
Wednesday, November 23, 2016, 14:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | UC#18 | Electrical Check | Results of TM#2 with UC#18 electrical at
the south hot cell. See attached PDF for
details. |
|
1401
|
Wednesday, November 23, 2016, 14:21 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#18 | module moved | TM#2 with UC#18 has been moved from the
south hot cell to the conditioning station. |
|
1400
|
Tuesday, November 22, 2016, 14:26 |
David Wang | Conditioning Station | Standard Operation | | | TCS vacuum pumps are switched off | TCS will be vented tomorrow morning for
TM2 moving. |
|
1399
|
Tuesday, November 22, 2016, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | Electrical Check | Electrical check of TM#2 with the SiC#35
post beam run. See attached PDF for details. |
|
1398
|
Tuesday, November 22, 2016, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | module moved | TM#2 with the old SiC #35 has been moved
from ITW to the south hot cell. |
|
1397
|
Tuesday, November 15, 2016, 07:53 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Target Hall schedule for beam schedule 131(Sep-Dec, 2016) | Update TH schedules . See attachments |
|
1396
|
Tuesday, November 08, 2016, 14:45 |
David Wang | ITE | Maintenance | TM4 | | TM4 has been moved to ITE and connected there. | All ITE and TM4 turbo pumps are started.
The east station pumping down is good so
far. |
|
1395
|
Tuesday, November 08, 2016, 14:04 |
Isaac Earle | North Hot-Cell | Development | | | Interference check with TCS turbo pump and proposed NHC duct routing | David Wang and I accessed the NHC today
to check if the proposed duct routing (IRH1618)
will interfere with servicing or replacement |
|
1394
|
Tuesday, November 08, 2016, 10:23 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#50 | module moved | TM#4 with Ta#50 has been moved to the east
target station. |
|
1393
|
Tuesday, November 08, 2016, 07:47 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS water and vacuum pumps are switched off | TCS is vented. TM4 is disconnected and
TCS. |
|
1392
|
Monday, November 07, 2016, 10:35 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#34 | Spent Target move | Spent SiC#34 was moved on the 3rd of November
and placed in the spent target vault.
See attached pdf for details. |
|
1391
|
Thursday, November 03, 2016, 09:01 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS water system has been started for TM4. | The system works fine. All water signals
to TM4 at TCS are normal. HV cover is installed
on to TM4 at TCS. |
|
1390
|
Thursday, November 03, 2016, 08:57 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Helium pressure test on TM4 HS line at TCS | 70 psi helium ,2minutes to TM4 HS
line. LD base leak rate 0.0xE-9 atm.cc/sec.
No leak. |
|
1389
|
Wednesday, November 02, 2016, 13:41 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 has been connected at TCS. | All turbo-pumps are started. The pumping
down is good so far. |
|