  1308   Monday, August 08, 2016, 11:24 chad fisherSouth Hot-CellMaintenance  Anteroom Clean-up - WaveguideThe wave guide from TM3 has been surveyed,
swiped and removed from the anteroom and
transported to rad waste for disposal. The
  
  1307   Friday, August 05, 2016, 14:13 Isaac EarleNorth Hot-CellDevelopment  Preparations for NHC Ventilation TestA hole was drilled in the NHC exhaust duct
in the east end of the target hall above
the hatch to the Ante Room.  This will
  
  1306   Friday, August 05, 2016, 13:50 chad fisherSouth Hot-CellMaintenance  Anteroom clean outSome items have been removed from the anteroom
in preparation for painting. Items have been
placed on plastic in the south hot cell service
  
  1305   Thursday, August 04, 2016, 08:56 Travis CaveSpent Target VaultStandard Operation UC#16Spent Target moveThe spent UC #16 have been moved from the
south hot cell to the storage vault see attached
PDF for details.
 Vault_Storage_August_3_2016.pdf 
  1304   Wednesday, August 03, 2016, 10:02 Travis CaveSouth Hot-CellStandard OperationTM4UC#17Electrical CheckThe result of yesterdays electrical check
on TM#4 with UC#17.
 TM4_elechk_UC17_SHC.PDF 
  1303   Wednesday, August 03, 2016, 09:56 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Oct, 2016)Update schedule weekly. See attachments
1,2
 Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1302   Wednesday, August 03, 2016, 09:49 David WangConditioning StationStandard OperationTM4 TM4 is ready for conditioing at TCS.I started TCS water system and installed
HV cover onto TM4.  The TM4 containment
box is supplied with water also. TM4 is ready
  
  1301   Wednesday, August 03, 2016, 09:45 David WangConditioning StationStandard OperationTM4UC#17Helium pressure test on TM4 HS line at TCS Helium pressure test on TM4 HS line at
TCS  is done.Leak detector 0.0X E-9atm.cc/sec. 
5minutes, 70psi helium.   
  
  1300   Wednesday, August 03, 2016, 09:15 chad fisherSouth Hot-CellRepair  ManipulatorEast manipulator on the south hot cell
is showing signs of eminent wrist/tong cable
failure. Some slight slippage was noted yesterday
  
  1299   Wednesday, August 03, 2016, 08:08 Anders MjosConditioning StationStandard OperationTM4UC#17Conditioning UC#17Wednesday, August 03, 2016, 08:08: RGA
on
Wednesday, August 03, 2016, 11:25:
 UC#17.docxTCS-2016-08-03_UC#17.rgaTCS-2016-08-08_UC#17.rga 
  1298   Tuesday, August 02, 2016, 15:22 David WangConditioning StationStandard OperationTM4UC#17TM4 with new target has been connected at TCSIt is being pumped now at TCS.   
  1297   Tuesday, August 02, 2016, 14:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#17module movedTM#4 with UC#17 is now in the conditioning
station.
  
  1296   Tuesday, August 02, 2016, 13:32 chad fisherSouth Hot-CellStandard OperationTM4UC#16UC#16 Removed #17 installedUCx#16 has been removed from TM$ and UCx#17
installed, high current conductors toqued
to 130 in lbs.
  
  1295   Tuesday, August 02, 2016, 11:02 Travis CaveITEStandard OperationTM4UC#16module movedTM#4 with UC#16 has been moved from the
east station to the south hot cell. The shield
plug was also install remotely once it was
  
  1294   Friday, July 29, 2016, 14:27 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Measurements & Cleanup The North
Hot Cell was accessed today via the Ante
  
  1293   Thursday, July 28, 2016, 11:27 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 with no target has been moved from
the conditioning station to the NE silo.
  
  1292   Tuesday, July 26, 2016, 11:22 chad fisherSouth Hot-CellMaintenance  Soth Hot Cell Waste Storage Vault TunnelThe two 45 gal (m) drums of waste removed
from the south hot cell in December 2015
and January 2016 were transferred from the
  
  1291   Monday, July 25, 2016, 08:15 Anders MjosConditioning StationRepairTM3 HV Test Monday, July 25, 2016, 08:14: Enabled
staging for chiller
Monday, July 25, 2016, 08:33: Disabled
 TM3_HV_conditioning_2016-07-25.docxTCS-2016-07-25_TM3_no_target.rgaTCS-2016-07-26_TM3_no_target.rga 
  1290   Friday, July 22, 2016, 10:57 David WangConditioning StationRepairTM3 TM3 has been moved and connected at TCSI started vacuum system.
I started TCS water system. The chiller
does not work properly still. But, It will
  
  1289   Tuesday, July 19, 2016, 14:35 Aurelia LaxdalConditioning StationRepairTM3 TM3 leak checked at TCS

    

       
            
  