1308
|
Monday, August 08, 2016, 11:24 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom Clean-up - Waveguide | The wave guide from TM3 has been surveyed,
swiped and removed from the anteroom and
transported to rad waste for disposal. The |
|
1307
|
Friday, August 05, 2016, 14:13 |
Isaac Earle | North Hot-Cell | Development | | | Preparations for NHC Ventilation Test | A hole was drilled in the NHC exhaust duct
in the east end of the target hall above
the hatch to the Ante Room. This will |
|
1306
|
Friday, August 05, 2016, 13:50 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom clean out | Some items have been removed from the anteroom
in preparation for painting. Items have been
placed on plastic in the south hot cell service |
|
1305
|
Thursday, August 04, 2016, 08:56 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#16 | Spent Target move | The spent UC #16 have been moved from the
south hot cell to the storage vault see attached
PDF for details. |
|
1304
|
Wednesday, August 03, 2016, 10:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#17 | Electrical Check | The result of yesterdays electrical check
on TM#4 with UC#17. |
|
1303
|
Wednesday, August 03, 2016, 09:56 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) | Update schedule weekly. See attachments
1,2 |
|
1302
|
Wednesday, August 03, 2016, 09:49 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TM4 is ready for conditioing at TCS. | I started TCS water system and installed
HV cover onto TM4. The TM4 containment
box is supplied with water also. TM4 is ready |
|
1301
|
Wednesday, August 03, 2016, 09:45 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#17 | Helium pressure test on TM4 HS line at TCS | Helium pressure test on TM4 HS line at
TCS is done.Leak detector 0.0X E-9atm.cc/sec.
5minutes, 70psi helium. |
|
1300
|
Wednesday, August 03, 2016, 09:15 |
chad fisher | South Hot-Cell | Repair | | | Manipulator | East manipulator on the south hot cell
is showing signs of eminent wrist/tong cable
failure. Some slight slippage was noted yesterday |
|
1299
|
Wednesday, August 03, 2016, 08:08 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | UC#17 | Conditioning UC#17 | Wednesday, August 03, 2016, 08:08: RGA
on
Wednesday, August 03, 2016, 11:25: |
|
1298
|
Tuesday, August 02, 2016, 15:22 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#17 | TM4 with new target has been connected at TCS | It is being pumped now at TCS. |
|
1297
|
Tuesday, August 02, 2016, 14:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#17 | module moved | TM#4 with UC#17 is now in the conditioning
station. |
|
1296
|
Tuesday, August 02, 2016, 13:32 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#16 | UC#16 Removed #17 installed | UCx#16 has been removed from TM$ and UCx#17
installed, high current conductors toqued
to 130 in lbs. |
|
1295
|
Tuesday, August 02, 2016, 11:02 |
Travis Cave | ITE | Standard Operation | TM4 | UC#16 | module moved | TM#4 with UC#16 has been moved from the
east station to the south hot cell. The shield
plug was also install remotely once it was |
|
1294
|
Friday, July 29, 2016, 14:27 |
Isaac Earle | North Hot-Cell | Development | | | North Hot Cell Measurements & Cleanup | The North
Hot Cell was accessed today via the Ante |
|
1293
|
Thursday, July 28, 2016, 11:27 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved | TM#3 with no target has been moved from
the conditioning station to the NE silo. |
|
1292
|
Tuesday, July 26, 2016, 11:22 |
chad fisher | South Hot-Cell | Maintenance | | | Soth Hot Cell Waste Storage Vault Tunnel | The two 45 gal (m) drums of waste removed
from the south hot cell in December 2015
and January 2016 were transferred from the |
|
1291
|
Monday, July 25, 2016, 08:15 |
Anders Mjos | Conditioning Station | Repair | TM3 | | HV Test | Monday, July 25, 2016, 08:14: Enabled
staging for chiller
Monday, July 25, 2016, 08:33: Disabled |
|
1290
|
Friday, July 22, 2016, 10:57 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 has been moved and connected at TCS | I started vacuum system.
I started TCS water system. The chiller
does not work properly still. But, It will |
|
1289
|
Tuesday, July 19, 2016, 14:35 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | | TM3 leak checked at TCS |
|
|