  RH-ISAC, Page 77 of 138  Not logged in ELOG logo
ID Date Author Category Type Module Target/Number Subject Text Attachments
  1228   Wednesday, May 11, 2016, 09:44 Travis CaveConditioning StationStandard OperationTM2Ta#48module movedTM#2 with Ta#48 has been moved from the
south hot cell to the conditioning station.
  
  1227   Tuesday, May 10, 2016, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#48Electrical CheckElectrical check of TM#2 with Ta#48 attached.
See the attached PDF for details.
 TM2_elec_chk_Ta48_SHC.PDF 
  1226   Tuesday, May 10, 2016, 13:54 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on window line and HS line.Chad and I leak checked the TM2 HS and
window lines after new target installation. 
The window line was very easy pumped down
  
  1225   Tuesday, May 10, 2016, 13:37 chad fisherSouth Hot-CellStandard OperationTM2Ta#48Ta#48 InstallationTa#48 has been installed onto TM2. Also
new window gaskets were installed.
High current fasteners were torqued
  
  1224   Monday, May 09, 2016, 10:13 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule movedTM#3 was moved from the conditioning station
to the NE Silo. TM#2 was moved from the SW
Silo to the South hot cell.
  
  1223   Monday, May 09, 2016, 08:43 David WangConditioning StationRepairTM3 I reinstalled all the side panel on TM3 service cap.They were moved for TM3 inspection job
last week. All the bolts on the panel are
hand tight only now since they will be removed
  
  1222   Wednesday, May 04, 2016, 12:01 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Update schedule weekly. See attachment
1,2,3.
 Target_Hall_shedule_130_Apr_to_Sep_2016.pdfTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1221   Wednesday, May 04, 2016, 11:14 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Scope DecisionA meeting was held on May 4, 2016 to determine
the scope of the North Hot Cell project.
 The following was agreed upon by those
  
  1220   Monday, May 02, 2016, 11:33 Travis CaveConditioning StationStandard OperationTM2no targetmodule movedTM#2 was moved to the SW Silo from the
Conditioning Station. TM#3 was from from
the NW Silo to the Conditioning Station.
  
  1219   Friday, April 29, 2016, 10:06 David WangConditioning StationStandard OperationTM2 I switched off TCS and TM2 vacuum pumps.  I switched off TCS and TM2 vacuum
pumps. The TM2 will be disconnected at TCS
today and moved to silo on next Monday.
  
  1218   Friday, April 29, 2016, 08:01 David WangConditioning StationMaintenanceTM2 TM2 leak check at TCS, helium pressure testAnders and I finished the most part of
TM2 water lines helium pressure test yesterday.I
list the system parameters and test result
  
  1217   Thursday, April 28, 2016, 06:28 David WangConditioning StationMaintenanceTM2 TCS water system are turned off. TCS water system worked fine overnight.
I turned off TCS water system at 6:16 AM
this morning. Start of purging TM2 water
  
  1216   Tuesday, April 26, 2016, 10:47 David WangConditioning StationRepairTM2 TM2 leak check at TCS, water test.The following water circuits in TM2 are
connected at TCS and  running with water
now : target oven+ - ( one circuit), tube
  
  1215   Monday, April 25, 2016, 12:18 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep)Post MS project and Excel   
target hall schedule for beam schedule 130
see attachments 1,2
 7x 
  1214   Friday, April 22, 2016, 14:07 David WangConditioning StationStandard OperationTM2 2016 Winter Shut Down Target Hall ScheduleWeekly update.This is the last update on
2016 winter shut down schedule. The new TH
schedule for beam130  will be posted
 2016_winter_shut_down__target_hall_schedule.pdf2016_winter_shut_down__target_hall_schedule.mpp 
  1213   Monday, April 18, 2016, 09:07 David WangConditioning StationRepairTM2 venting TCS with argon.Anders reported a possible air leak on
TM2 and TCS by watching RGA  this morning.
I found the quick connector on F terminal
  
  1212   Thursday, April 14, 2016, 12:56 David WangITWStandard OperationTM1 5 shielding blocks have been moved to ITW.The ITW is configured to take proton beam.   
  1211   Thursday, April 14, 2016, 09:46 Anders MjosConditioning StationStandard OperationTM2 TM2 water leak test Thursday, April 14, 2016, 07:50:
RGA on

Friday, April 15, 2016, 08:09
 2016-04-15_RGA.png 
  1210   Wednesday, April 13, 2016, 10:46 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected. TCS is under roughing now.
2016-04-14, Started TCS and TM2 turbo-pumps
yesterday afternoon. Overnight pumping down
  
  1209   Wednesday, April 13, 2016, 10:46 David WangConditioning StationStandard OperationTM2 TM2 and TCS vacuum system has been connected. TCS is under roughing now.   