1188
|
Friday, April 01, 2016, 14:41 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and TCS vacuum system has been connected. TCS control page white out. | I can not start the TCS pumps due to control
page white out. Control group is working
on this issue. |
|
1187
|
Friday, April 01, 2016, 13:58 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#15 | module moved | TM#1 has been moved from the conditioning
station to the south hot cell, had UC#15
installed and then moved back to the conditioning |
|
1186
|
Friday, April 01, 2016, 11:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#15 | Electrical Check | Electrical check of the target on TM#1,
target in question is UC#15. See PDF for
details. |
|
1185
|
Wednesday, March 30, 2016, 15:49 |
David Wang | Assembly/Bench Test | Repair | TM2 | | TM2 Helium spray leak check on solder stems inside service cap on the top of SW silo. | On each water circuit in side the service
cap, there are 4 soldering stems which two
of them are inside blue nylon insulator and |
7x |
1184
|
Wednesday, March 30, 2016, 11:00 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Electrical Check | The results of the TM#1 electrical check
from the 29th of March 2016 |
|
1183
|
Wednesday, March 30, 2016, 08:40 |
David Wang | Conditioning Station | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule | update the schedule according to changes.See
attachment1, 2. |
|
1182
|
Tuesday, March 29, 2016, 08:38 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 water lines helium pressure check at TCS | TM1 water lines helium pressure check at
TCS is done. 70 psi helium was applied to
water circuits. Leak detector base leak rate |
|
1181
|
Thursday, March 24, 2016, 13:55 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | module moved | TM#2 has been moved from the south hot
cell to the south west silo and TM#1 was
moved from the north east silo to the conditioning |
|
1180
|
Thursday, March 24, 2016, 13:15 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and TCS vacuum system has been connected | TM1 and TCS vacuum system have been connected.
All turbo-pumps are started. The pumping
down is fine. |
|
1179
|
Wednesday, March 23, 2016, 11:32 |
David Wang | South Hot-Cell | Repair | TM2 | | TM2 Helium spray leak check on GE and MSP lines at SHC | Chad and I did the helium spray
leak check on TM2 GE and MSP water lines
at SHC this morning. We confirmed the GE |
|
1178
|
Wednesday, March 23, 2016, 11:00 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved | TM#2 was moved into the south hot cell
by 08:30. |
|
1177
|
Tuesday, March 22, 2016, 10:27 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#32 | Spent Target move | SiC#32 has been moved from the south hot
cell to the spent target storage. See attached
PDF for details. |
|
1176
|
Monday, March 21, 2016, 15:27 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 has been disconnected at TCS | TM2 vacuum system has been disconnected
at TCS. Venting is in process now. |
|
1175
|
Monday, March 21, 2016, 11:30 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 and TCS vacuum pumps are stopped | I stopped TM2 and TCS vacuum pumps. It
will be vented and disconnected this afternoon
for tomorrow moving. |
|
1174
|
Monday, March 21, 2016, 10:25 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 Helium pressure Test Result in TCS and ITW | TM2 has been helium pressure tested in
ITW and TCS. They are both tested with 70psi
helium, each circuit for 3minutes. |
|
1173
|
Friday, March 18, 2016, 13:13 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | SiC#32 | Electrical Check | Electrical checks of the TM#2 with the
old SiC#32 and without the target. See attached
PDFs. |
|
1172
|
Friday, March 18, 2016, 11:43 |
chad fisher | South Hot-Cell | Standard Operation | | | SiC#32 dissection | SiC#32 has been open for inspection. |
|
1171
|
Friday, March 18, 2016, 09:42 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 vacuum sysytem has been connected at TCS | TM2 vacuum system has been connected at
TCS. Started roughing pump. Everything is
good so far. |
|
1170
|
Friday, March 18, 2016, 09:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Target Hall schedule for beam schedule 130 (Apr- Sep) | I would like to post the spreadsheet of
target hall schedule for beam schedule 130(Apr
to Sep) first. The MS project of TH schedule |
|
1169
|
Friday, March 18, 2016, 08:34 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module moved | TM#2 with no target has been moved to the
conditioning station from the south hot cell. |
|