2770
|
Friday, February 14, 2025, 11:35 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 TP1/TP2 and TCS TP1S have been started at TCS. | TM2 TP1/TP2 and TCS:TP1S have been started
at TCS. The starting time and operation of
turbo pumps are ok. TM2 had been stored in |
|
2769
|
Friday, February 14, 2025, 10:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | No target | TM2 has been moved from SHC to TCS. | TM2 has been moved from SHC to TCS successfully.
Travis and I did the move. |
|
2768
|
Friday, February 14, 2025, 10:43 |
David Wang | ITW/ITE | Standard Operation | | | target pit CAD filter replacement in TH. | Plant Group Gabril.T organized a target
pit CAD filter replacement and testing yesterday.
My group helped on this job. small |
|
2767
|
Tuesday, February 11, 2025, 10:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | Conductor Block Insulator Replacement | Ceramic conductor blocks ITD0053 and ITD0054
were replaced on TM2. Initially, only ITD0053
was to be replaced but after removing it |
![Image_(12).jpeg Image_(12).jpeg](attachment.png) ![Image_(13).jpeg Image_(13).jpeg](attachment.png) |
2766
|
Monday, February 10, 2025, 11:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | No target | TM2 has been moved from W_S silo to SHC. | Remotely removed TM2 from S-W silo to SHC
. Peter and I did the move. It is successful.
|
|
2765
|
Wednesday, February 05, 2025, 13:46 |
Alexander Shkuratoff | ITE | Standard Operation | | | ITE HV bias test without module (Work permit I2025-02-03-2) | Wednesday, February 05, 2025, 12:20
Ed has the voltage already
up to 1000 V. Starting further ramp up in |
|
2764
|
Tuesday, February 04, 2025, 11:50 |
Alexander Shkuratoff | ITW | Standard Operation | | | ITW HV bias test without module (Work permit I2025-02-03-2) | Tuesday, February 04, 2025, 10:15
Started voltage ramp up.
Using 250 V increments.
Tuesday, |
|
2763
|
Monday, February 03, 2025, 13:10 |
David Wang | Cooling | Standard Operation | | | HALCW pump ITC:MP1 has been started. | HALCW pump ITC:MP1 has been started. water
are supplied to both ITE and ITW system.
all water signals for individual circuits |
|
2762
|
Monday, February 03, 2025, 13:04 |
David Wang | Safe Module Parking | Maintenance | | | ITW/ITW 24VDC electrical connectors for TP BVs MRO. | ITW/ITW 24VDC electrical connectors for
TP BVs MRO has been done. |
|
2761
|
Thursday, January 30, 2025, 07:17 |
David Wang | Crane | Standard Operation | | | inspection of target hall crane below hook attachment pins and plates ITA6550-01. | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01
yesterday. He certified the use of these |
|
2760
|
Thursday, January 30, 2025, 07:13 |
David Wang | Crane | Standard Operation | | | inspection of target module lifting frames ITA0494-1997-01 and ITA1994-1997-02 | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02
yesterday. He certified the use of these |
|
2759
|
Thursday, January 30, 2025, 07:07 |
David Wang | Crane | Standard Operation | | | target hall crane annual inspection. | Tom Kauss finished TH crane annual inspection
yesterday. The crane woks fine. Tom has
this inspection record in his file. The crane |
|
2758
|
Wednesday, January 29, 2025, 11:39 |
chad fisher | North Hot-Cell | Repair | | | Model N Remote Arm #9342 Tong Cable | Model N remote arm serial #9342 tong cable
has been un-jammed from between pulley 3D
(see picture) and casting (this is an ongoing |
|
2757
|
Wednesday, January 29, 2025, 11:10 |
chad fisher | South Hot-Cell | Standard Operation | | | Pre-entry field Check | Fields in the hot cell were checked using
a pole monitor. Field approximately in the
area someone would stand to repair manip. |
|
2756
|
Wednesday, January 29, 2025, 09:06 |
David Wang | ITE/ITW | Standard Operation | | | ITE and ITW water system paddle wheels and coils on flow sensors have been replaced | ITE and ITW water system paddle wheels
and coils on all flow sensors in pits have
been replaced. It's a SAS job. |
|
2755
|
Tuesday, January 28, 2025, 11:47 |
David Wang | Conditioning Station | Standard Operation | TM3 | No target | Tm3 has been moved from TCS to silo. | Tm3 has been moved from TCS to silo.
The move is successful. |
|
2754
|
Monday, January 27, 2025, 08:27 |
om David Wang | South Hot-Cell | Maintenance | | parasite target | Transfer parasite target from SHC to NHC. | A parasite target has been transferred
from SHC to NHC. It is a job to reduce SHC
field for coming SHC entry job. The transfer |
|
2753
|
Wednesday, January 22, 2025, 10:29 |
Frank Song | Faraday Cage | Maintenance | | | Annual clean up for ITE/ITW Faraday cages | David and I cleaned both cages in
ISAC1 electric room, all done. |
|
2752
|
Tuesday, January 21, 2025, 10:46 |
David Wang | ITE/ITW | Standard Operation | | | ITW/ITE pit general annual cleaning up. | ITW/ITE pit general annual cleaning up
were done. all concrete floor and TM equipment
surface are vacuum cleaned. HV cage |
|
2751
|
Monday, January 20, 2025, 11:33 |
Adam Newsome | Waste Package/Ship | Standard Operation | | | F-308 flask loading - six flasks loaded | Today (2025-01-20), six flasks were loaded
in preparation for shipment with the following
targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10, |
|