  12   Wednesday, February 06, 2013, 18:07 Grant MinorElevation JackMaintenanceLid-down yoke gap measurements from 1994Attached is a scan of a handwritten record
from 1994 showing yoke-to-upper-structure
gap measurements from 1994, both L and R
 Elevation_Yoke_Measurements_1994.pdf 
  16   Friday, March 08, 2013, 18:42 Grant MinorCyclotronRepairTank lid not at upper limit and resulting effectsThis morning during routine service bridge
work in the Cyclotron tank, it was observed
by Travis Cave that the cable tray for the
 Contact_btwn_cable_tray_and_upper_equip_8Mar2013.PNGJack_upper_limit_switch_not_engaged_8Mar2013.pngJack_upper_limit_switch_engaged_8Mar2013.pngCyclotron_height_stick_half_inch_from_roof_8Mar2013.JPGCyclotron_height_stick_final_position_8Mar2013.jpg 
  17   Monday, March 11, 2013, 19:43 Grant MinorCyclotronRepairAdjustment of tank lid upper limit by 1/4" upwardsThis morning Don Jackson commented to Grant
Minor that he believed the tank lid was still
not raised high enough to safely operate
 cyclotron_upper_limit_station_10_before_adjustment_11Mar2013_002.jpgcyclotron_upper_limit_station_10_after_adjustment_11Mar2013_004.jpgcyclotron_upper_limit_station_1_before_adjustment_11Mar2013_005.jpgcyclotron_upper_limit_station_1_after_adjustment_11Mar2013_006.jpgcyclotron_upper_limit_lamp_on_11Mar2013_008.jpg 
  18   Thursday, March 14, 2013, 19:57 Grant MinorCyclotronRepairTank lid upper / over travel limit checkToday Grant Minor, Dan Wright, Arthur Leung,
and Dan Louie checked the height difference
between the tank lid upper travel limit switch
 cyclotron_over_travel_limit_check_Station10_14Mar2013_003.JPGcyclotron_over_travel_limit_check_Station1_14Mar2013_001.jpg 
  20   Friday, March 15, 2013, 15:18 Grant MinorCyclotronStandard OperationLid Down Successful - Mechanical Counter ReadingsPrior to the lid-down operation today,
the Cyclotron was lowered by 0.75" and
then raised again to confirm that the upper
  
  22   Tuesday, March 19, 2013, 19:17 Grant MinorElevation JackStandard OperationRe-indexing of all jack station "zero" yoke elevationsThe dimension between the yokes and the
Cyclotron upper structure primary beams was
set to .25" nominal at all jack stations
 Jacks_Station_6_and_4_Procedure_Jan_12_2012_122.jpg 
  23   Thursday, April 11, 2013, 19:00 Grant MinorElevation JackMaintenanceUpper Bearing at Jack Station 9 + Fall Protection UpgradesThere was a brief access period to the
Cyclotron vault during April 9 to 12, 2013
due to other Cyclotron issues.
 station_9_ceiling_anchors_SRLs_10april2013-002.JPGstation_9_ceiling_anchors_SRLs_10april2013-003.JPGstation_9_ceiling_anchors_SRLs_10april2013-004.JPGstation_9_ceiling_anchors_SRLs_10april2013-006.JPG 
  27   Monday, January 20, 2014, 12:00 Grant MinorElevation JackStandard OperationIndexing Check of Cyclotron Jack StationsMaico Dalla Valle and Grant Minor, supported
by Dan Louie and Arthur Leung, entered the
Cyclotron Vault on January 15th, 2014 to
  
  28   Thursday, January 23, 2014, 18:47 Grant MinorElevation JackStandard OperationCyclotron Lid-Up Report - 22 Jan 2014Yesterday Grant Minor (me), Maico Dalla
Valle, Dan Louie, and Arthur Leung worked
with Operations to perform the Cyclotron
 6x 
  41   Monday, March 03, 2014, 15:07 Grant MinorElevation JackStandard OperationCyclotron Lid-Down Report Monday 3-March-2014The Cyclotron Lid Down was successfully
completed today on Work Permit C2014-03-03-6.
The system only tripped twice on
  
  44   Wednesday, July 02, 2014, 16:46 Grant MinorElevation JackStandard OperationCyclotron Lid-Up Report for 27 June 2014The cyclotron lid was raised on June 27th,
2014.  Start time was 1:05pm end time
was 2:17pm (good!) Dan McDonald collected
  
  46   Tuesday, January 13, 2015, 16:46 Grant MinorElevation JackDevelopmentUpper Bearing Fall Protect Guardrails TRH1217 Installed on Stns 8,10, 3, 4 & 55 x TRH1217 Upper Bearing Service Platform
assemblies were installed between January
6th and January 13th at Stations 8, 10, 3,
 9x 
  49   Tuesday, January 27, 2015, 11:39 Grant MinorElevation JackStandard OperationLid-Up Report 26 Jan 2015






Normal
0
 Station_8_Interference_Measurment_26Jan2015.JPGStation_8_Lid_Up_without_platform_26Jan2015.JPG 
  59   Friday, March 06, 2015, 16:42 Grant MinorElevation JackStandard OperationLid-Down Report 6-March-2015Lid down started around 2:30 pm today (March
6th, 2015)
Master Start: 47422
 Electrical_Cover_Knocked_Off_6March2015.JPG 
  64   Thursday, March 26, 2015, 15:48 Grant MinorElevation JackStandard OperationCyclotron Lid-Up 26 March 2015Lid was raised today (2nd time during 2015
shutdown) for additional inflector work.
Dan and Maico report that the lid
  
  68   Thursday, April 16, 2015, 15:26 Grant MinorElevation JackMaintenanceCyclotron Elevating System Maintenance Rotation Record - Updated 16 Apr 2015   Cyclotron_Elevating_System_Maintenance_Rotation_Record_16Apr2015.pdf 
  70   Thursday, September 17, 2015, 18:38 Grant MinorElevation JackMaintenanceStation 9 Jack Worm Gear Inspection - unusual wear markings 16Sept2015Unusual wear markings were observed on
the Station 9 jack (not sure if L or R jack?)
during a visual inspection.
 8x 
  75   Tuesday, January 19, 2016, 17:59 Grant MinorElevation JackDevelopmentUpper Bearing Fall Protection Installation - Stations 1, 2, 6, 7, 8, 11, & 12The installation of the upper bearing fall
protection equipment was completed last week
by Dan and Maico.
 22x 
  150   Friday, February 03, 2023, 08:27 Eric LaheElevation JackMaintenanceElevating System Jack Inspection  Annual Jack Inspection: The annual
elevation system inspection has been completed
(Jan 31,2023).
 Elevation_System_Checklist_-_Jan312023.xlsx 
  164   Wednesday, January 31, 2024, 15:06 Eric LaheElevation JackMaintenanceElevating System - Annual Station Swap 2023-2024 The annual elevating system maintenance
for the 2023-2024 shutdown following Document-220322, 
Work done after electrical lockout
  