ID |
Date |
Author |
Category |
Type |
Subject |
Text |
|
|
12
|
Wednesday, February 06, 2013, 18:07 |
Grant Minor | Elevation Jack | Maintenance | Lid-down yoke gap measurements from 1994 | Attached is a scan of a handwritten record
from 1994 showing yoke-to-upper-structure
gap measurements from 1994, both L and R |
|
|
16
|
Friday, March 08, 2013, 18:42 |
Grant Minor | Cyclotron | Repair | Tank lid not at upper limit and resulting effects | This morning during routine service bridge
work in the Cyclotron tank, it was observed
by Travis Cave that the cable tray for the |
|
|
17
|
Monday, March 11, 2013, 19:43 |
Grant Minor | Cyclotron | Repair | Adjustment of tank lid upper limit by 1/4" upwards | This morning Don Jackson commented to Grant
Minor that he believed the tank lid was still
not raised high enough to safely operate |
|
|
18
|
Thursday, March 14, 2013, 19:57 |
Grant Minor | Cyclotron | Repair | Tank lid upper / over travel limit check | Today Grant Minor, Dan Wright, Arthur Leung,
and Dan Louie checked the height difference
between the tank lid upper travel limit switch |
|
|
20
|
Friday, March 15, 2013, 15:18 |
Grant Minor | Cyclotron | Standard Operation | Lid Down Successful - Mechanical Counter Readings | Prior to the lid-down operation today,
the Cyclotron was lowered by 0.75" and
then raised again to confirm that the upper |
|
|
22
|
Tuesday, March 19, 2013, 19:17 |
Grant Minor | Elevation Jack | Standard Operation | Re-indexing of all jack station "zero" yoke elevations | The dimension between the yokes and the
Cyclotron upper structure primary beams was
set to .25" nominal at all jack stations |
|
|
23
|
Thursday, April 11, 2013, 19:00 |
Grant Minor | Elevation Jack | Maintenance | Upper Bearing at Jack Station 9 + Fall Protection Upgrades | There was a brief access period to the
Cyclotron vault during April 9 to 12, 2013
due to other Cyclotron issues. |
|
|
27
|
Monday, January 20, 2014, 12:00 |
Grant Minor | Elevation Jack | Standard Operation | Indexing Check of Cyclotron Jack Stations | Maico Dalla Valle and Grant Minor, supported
by Dan Louie and Arthur Leung, entered the
Cyclotron Vault on January 15th, 2014 to |
|
|
28
|
Thursday, January 23, 2014, 18:47 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up Report - 22 Jan 2014 | Yesterday Grant Minor (me), Maico Dalla
Valle, Dan Louie, and Arthur Leung worked
with Operations to perform the Cyclotron |
6x |
|
41
|
Monday, March 03, 2014, 15:07 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Down Report Monday 3-March-2014 | The Cyclotron Lid Down was successfully
completed today on Work Permit C2014-03-03-6.
The system only tripped twice on |
|
|
44
|
Wednesday, July 02, 2014, 16:46 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up Report for 27 June 2014 | The cyclotron lid was raised on June 27th,
2014. Start time was 1:05pm end time
was 2:17pm (good!) Dan McDonald collected |
|
|
46
|
Tuesday, January 13, 2015, 16:46 |
Grant Minor | Elevation Jack | Development | Upper Bearing Fall Protect Guardrails TRH1217 Installed on Stns 8,10, 3, 4 & 5 | 5 x TRH1217 Upper Bearing Service Platform
assemblies were installed between January
6th and January 13th at Stations 8, 10, 3, |
9x |
|
49
|
Tuesday, January 27, 2015, 11:39 |
Grant Minor | Elevation Jack | Standard Operation | Lid-Up Report 26 Jan 2015 |
Normal
0
|
|
|
59
|
Friday, March 06, 2015, 16:42 |
Grant Minor | Elevation Jack | Standard Operation | Lid-Down Report 6-March-2015 | Lid down started around 2:30 pm today (March
6th, 2015)
Master Start: 47422 |
|
|
64
|
Thursday, March 26, 2015, 15:48 |
Grant Minor | Elevation Jack | Standard Operation | Cyclotron Lid-Up 26 March 2015 | Lid was raised today (2nd time during 2015
shutdown) for additional inflector work.
Dan and Maico report that the lid |
|
|
68
|
Thursday, April 16, 2015, 15:26 |
Grant Minor | Elevation Jack | Maintenance | Cyclotron Elevating System Maintenance Rotation Record - Updated 16 Apr 2015 | |
|
|
70
|
Thursday, September 17, 2015, 18:38 |
Grant Minor | Elevation Jack | Maintenance | Station 9 Jack Worm Gear Inspection - unusual wear markings 16Sept2015 | Unusual wear markings were observed on
the Station 9 jack (not sure if L or R jack?)
during a visual inspection. |
8x |
|
75
|
Tuesday, January 19, 2016, 17:59 |
Grant Minor | Elevation Jack | Development | Upper Bearing Fall Protection Installation - Stations 1, 2, 6, 7, 8, 11, & 12 | The installation of the upper bearing fall
protection equipment was completed last week
by Dan and Maico. |
22x |
|
150
|
Friday, February 03, 2023, 08:27 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System Jack Inspection | Annual Jack Inspection: The annual
elevation system inspection has been completed
(Jan 31,2023). |
|
|
164
|
Wednesday, January 31, 2024, 15:06 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System - Annual Station Swap 2023-2024 | The annual elevating system maintenance
for the 2023-2024 shutdown following Document-220322,
Work done after electrical lockout |
|