125
|
Friday, March 06, 2020, 13:36 |
Keith C Ng | M9 | Repair | M9 B1 moved to warm cell | The M9 B1 was removed from the M9
channel surveyed and moved to the remote
handling warm cell for refurbishment. |
|
|
126
|
Thursday, March 19, 2020, 15:42 |
Keith C Ng | Primary Beamlines | Development | Vault beamline beam position monitor | The Beam Position Monitor between 1VB1
and 1VM3 has been installed. The indium joints
are leak tight, however the V flanges are |
|
|
127
|
Friday, August 07, 2020, 16:18 |
Keith C Ng | M9 | Maintenance | T2 M9 exit port and B1 flange cleaning | Today we attempted to scrape remnant indium
from T2 M9 exit port and clean B1 knife flange
for the new magnet. Report of todays activities |
|
|
128
|
Monday, August 10, 2020, 16:08 |
Keith C Ng | M9 | Development | M9 Q1Q2 magnet assembly installed in pit | The M9 Q1Q2 magnet assembly was installed
in the M9 beam line today.
Attached to elog is an inspection |
|
|
129
|
Friday, March 18, 2022, 12:12 |
Keith C Ng | Primary Beamlines | Repair | q15 repair | beamlines replaced leaking insulator
on q15, circuit #4. See updated pdf for replacement
part and location. |
|
|
130
|
Friday, May 06, 2022, 11:27 |
Keith C Ng | Primary Beamlines | Standard Operation | 4V CM1 RH joint install | 2022 Apr 28 to 29:
Installed a new remote handling 4"
indium joint for new beamline 4 north section. |
|
|
91
|
Wednesday, March 16, 2016, 17:19 |
Ron Kuramoto | Primary Beamlines | Development | 4VQ3 Removal | On 8March2016, under W/P C2016-03-08-2,
4VQ3 was lifted out of BL4V with the vault
orbit crane where it was first weighed then |
|
|
92
|
Wednesday, March 16, 2016, 17:57 |
Ron Kuramoto | Primary Beamlines | Development | 4VQ1&Q2 Removal | On 14March2016, 4VQ1&Q2 were
removed from BL4V and lowered into the Vault
basement B3 level where they were stored |
13x |
|
119
|
Tuesday, April 16, 2019, 11:19 |
Ron Kuramoto | Primary Beamlines | Repair | 1AQ14 B/L Flange Broken Thermocouple | On March 7,2019 the Thermocouple (TC) cable
which monitors the temperature of the 1AQ14
B/L vacuum joint was broken when the iron |
|