  ID Date Authordown Category Type Subject Text Attachments
  127   Friday, August 07, 2020, 16:18 Keith C NgM9MaintenanceT2 M9 exit port and B1 flange cleaningToday we attempted to scrape remnant indium
from T2 M9 exit port and clean B1 knife flange
for the new magnet. Report of todays activities
 Cleaning_the_flanges.pdf 
  128   Monday, August 10, 2020, 16:08 Keith C NgM9DevelopmentM9 Q1Q2 magnet assembly installed in pitThe M9 Q1Q2 magnet assembly was installed
in the M9 beam line today. 
Attached to elog is an inspection
 RHB_9237.JPG20200810_indiumringinspectionreport.pdf 
  129   Friday, March 18, 2022, 12:12 Keith C NgPrimary BeamlinesRepairq15 repair beamlines replaced leaking insulator
on q15, circuit #4. See updated pdf for replacement
part and location.
 tbp0425d_revB_acad-magnetinsulatortopheaderassembly_w-2022_repairannotations.pdfInkedRH1_0044_LI.jpgRH1_0046.jpgRH1_0050.jpgRH1_0049.jpg 
  130   Friday, May 06, 2022, 11:27 Keith C NgPrimary BeamlinesStandard Operation4V CM1 RH joint install 2022 Apr 28 to 29:
Installed a new remote handling 4"
indium joint for new beamline 4 north section.
 2022_4v_cm1_rh_joint_install.pdf 
  1   Thursday, June 30, 2011, 16:58 John WongPrimary BeamlinesRepairblah blah blahdfdfdfdfdf   
  7   Thursday, May 24, 2012, 18:59 Grant MinorM20RepairM20 front-end leak vacuum check T2/Q1/Q2/Scraper

Normal
0




false
false
false
 6x 
  11   Tuesday, October 16, 2012, 19:47 Grant MinorM9RepairInspection of failed double-indium thru-ring TB22148See inspection notes attached for failed
M9T2 double-indium thru-ring TB22148, inspected
on Oct 15th 2012.
 TB22148_thru_ring_inspT2_15oct2012.pdfTB22148_thru_ring_inspQ1_15oct2012.pdf 
  12   Tuesday, October 16, 2012, 19:50 Grant MinorM9RepairM9T2 Joint Repair - Status Update 16 Oct 2012See attached.  M9T2_Joint_Repair_-_Status_Update_16_Oct_2012.pdf 
  16   Friday, October 19, 2012, 18:21 Grant MinorM9Development8" double-ring test samples of EPDM and BUNA-N (Nitrile)Today I picked up two 2FT x 4Ft x 0.125"
thick strips of stock EPDM and BUNA-N (Nitrile)
material from BC Rubber Supply.  A copy
 BC_RUBBER_SUPPLY_PS_VA-B18799.pdf20121019_RH2_02_0025.JPG20121019_RH2_02_0027.JPG20121019_RH2_02_0029.JPG20121019_RH2_02_0031.JPG 