Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 128     Entry time: Monday, August 10, 2020, 16:08
Author: Keith C Ng 
Category: M9 
Type: Development 
Subject: M9 Q1Q2 magnet assembly installed in pit 

The M9 Q1Q2 magnet assembly was installed in the M9 beam line today. 

Attached to elog is an inspection report of the indium ring that will be used in the M9 T2 Q1 joint.

Attachment 1: RHB_9237.JPG  6.562 MB  | Show | Hide all
Attachment 2: 20200810_indiumringinspectionreport.pdf  1.923 MB  | Show | Hide all
ELOG V2.9.2-2455