  43   Thursday, February 13, 2020, 08:51 Adam NewsomeT-Hall CraneStandard OperationRemote mode door limit switch bypassThe non-existent safety limit switch for
the target hall door which prevents remote
motion has been bypassed in the crane PLC
  
  55   Wednesday, August 24, 2022, 13:47 Adam NewsomeT-Hall CraneStandard OperationPendant/Receiver Communication IssueIn preparing to troubleshoot the issue
described in e-log #54, the crane was power
cycled, and the pendant battery removed,
  
  56   Tuesday, December 20, 2022, 10:03 Adam NewsomeT-Hall CraneStandard OperationOverhead crane powered off for the holidays[edit 2023-01-03] The crane was powered
back on this morning - there do not appear
to be any faults on the HMI and it seems
  
  58   Friday, January 20, 2023, 14:48 Adam NewsomeT-Hall CraneStandard OperationPendant/Receiver Communication Issue (Repeated)An issue was observed in which the pendant
did not work to control the  crane. This
is the second time in recent memory this
  
  61   Tuesday, April 25, 2023, 12:28 Adam NewsomeT-Hall CraneStandard OperationARIEL Target Hall Crane - Drives FaultToday while operating the crane with load,
the crane stopped moving. Upon investigating,
all safety signals appeared to be OK. Fault