ID Date Author Category Typedown Subject Text Attachments
  39   Friday, December 22, 2017, 12:42 Jason KapalkaT-Hall CraneStandard OperationPowered down ARIEL Target Hall Crane Powered down ARIEL Target Hall Crane
today by switching off main power switch
on B1 level in preparation for site-wide
  
  43   Thursday, February 13, 2020, 08:51 Adam NewsomeT-Hall CraneStandard OperationRemote mode door limit switch bypassThe non-existent safety limit switch for
the target hall door which prevents remote
motion has been bypassed in the crane PLC
  
  55   Wednesday, August 24, 2022, 13:47 Adam NewsomeT-Hall CraneStandard OperationPendant/Receiver Communication IssueIn preparing to troubleshoot the issue
described in e-log #54, the crane was power
cycled, and the pendant battery removed,
  
  56   Tuesday, December 20, 2022, 10:03 Adam NewsomeT-Hall CraneStandard OperationOverhead crane powered off for the holidays[edit 2023-01-03] The crane was powered
back on this morning - there do not appear
to be any faults on the HMI and it seems
  
  58   Friday, January 20, 2023, 14:48 Adam NewsomeT-Hall CraneStandard OperationPendant/Receiver Communication Issue (Repeated)An issue was observed in which the pendant
did not work to control the  crane. This
is the second time in recent memory this
  
  61   Tuesday, April 25, 2023, 12:28 Adam NewsomeT-Hall CraneStandard OperationARIEL Target Hall Crane - Drives FaultToday while operating the crane with load,
the crane stopped moving. Upon investigating,
all safety signals appeared to be OK. Fault
 MicrosoftTeams-image_(10).png 
  31   Wednesday, April 12, 2017, 10:52 Jason KapalkaT-Hall CraneRepairARIEL Target Hall crane oil leaks & inspection planOn March 29, 2017, a 9 tonne load was transferred
in the ARIEL Target Hall with the overhead
crane (TRIUMF crane #44). On April 3, 2017,
 IMG_3111.JPGIMG_3112.JPGIMG_3113.JPGIMG_3114.JPGIMG_3115.JPG 
  38   Monday, July 17, 2017, 15:32 Jason KapalkaT-Hall CraneRepairTarget Hall Crane modifications and repairs    
  42   Tuesday, November 19, 2019, 10:31 Adam NewsomeT-Hall CraneRepair900VFD Encoder Board ReplacementAn issue arose in which the ARIEL crane hoist
could not be moved. It was determined that
the East and West drums were out of synchronization
 IMG_20191106_140016.jpgIMG_20191106_153311.jpgIMG_20191112_114042.jpgHoist_Sync_3.jpgHoist_Sync_5.jpg 
  44   Friday, July 03, 2020, 15:43 Adam NewsomeT-Hall CraneRepairNorth Aux Hoist: West Travel Motion FailureAn issue was observed in which the North
Aux hoist failed to travel West when commanded
to, but the East motion was functioning.
 IMG_20200703_150700.jpg 
  45   Wednesday, September 09, 2020, 10:51 Adam NewsomeT-Hall CraneRepairNorth Aux Hoist Replacement (followup on E-Log 44)See E-Log 44 for details on North Aux Hoist
failure.
A replacement VFD was ordered by
  
  48   Tuesday, November 23, 2021, 11:01 Adam NewsomeT-Hall CraneRepairLoad Cell - Not FunctioningThe load cell which is located on the crane
itself to display the load to operators was
reported not working during the week of November
  
  50   Tuesday, February 01, 2022, 08:29 Adam NewsomeT-Hall CraneRepairNorth Aux Hoist - West Motion FailureAn issue was observed in which the North
Aux hoist failed to travel West  when commanded
to, but the East motion was functioning.
  
  52   Tuesday, March 15, 2022, 10:03 Adam NewsomeT-Hall CraneRepairNorth Aux Hoist VFD ReplacedThe North Aux Hoist VFD which had failed
(e-log 50) was replaced today by Tom Kauss
and Adam Newsome on Work Permit A2022-03-15-1.
  
  57   Friday, January 13, 2023, 13:57 Adam NewsomeT-Hall CraneRepairCrane light (west) not workingIt was observed today that the crane's
west light was not functioning. 
  
  60   Tuesday, March 21, 2023, 10:47 Adam NewsomeHot Cell 1RepairCircuit breaker replacement - telemanipulatorsThere was an issue with a 20 A circuit
breaker used to control motor assist functions
for the telemanipulators (specifically, the
  
  63   Wednesday, August 02, 2023, 09:13 chad fisherHot Cell 1RepairLeak Rate TestingOn August 1, 2023 HC1 was pumped down to
-1200 Pa (gauge) and then valved off to test
the leak rate after turntables had been sealed
  
  65   Wednesday, April 24, 2024, 09:17 Adam NewsomeT-Hall CraneRepairTarget Hall Crane: VFD DC bus undervoltage fault [root cause: encoder board failure on 900VFD]On 2024-04-22 around 3:30 pm it was discovered
that the crane's main hoist was in a faulted
state. The operator (Adam Newsome) experienced
 DC_bus_voltage.jpegPXL_20240422_225858594.jpg 
  1   Tuesday, November 04, 2014, 16:58 John Wong100KW Beam DumpMaintenanceTesting ElogTuesday, November 04, 2014, 16:58
This is a test.

 
  
  27   Monday, January 25, 2016, 13:20 Allon MessenbergT-Hall CraneMaintenancePossible oil leakTwo small (approx. 5 cm across) puddles
of green fluid were discovered on the floor,
directly below the crane trolley.  The
 20160122_161849.jpg20160122_161830.jpg20160125_100929.jpg 