  29   Wednesday, February 15, 2017, 11:57 chad fisherT-Hall CraneDevelopmentJason's Remote Crane Test BoxesOn Tuesday, February 14th I finished modifying
Jason's boxes for the remote crane tests
by adding shelves to mount cameras... Apart
  
  63   Wednesday, August 02, 2023, 09:13 chad fisherHot Cell 1RepairLeak Rate TestingOn August 1, 2023 HC1 was pumped down to
-1200 Pa (gauge) and then valved off to test
the leak rate after turntables had been sealed
  
  1   Tuesday, November 04, 2014, 16:58 John Wong100KW Beam DumpMaintenanceTesting ElogTuesday, November 04, 2014, 16:58
This is a test.

 
  
  30   Friday, March 31, 2017, 19:39 Jason KapalkaT-Hall CraneDevelopmentARIEL Target Hall overhead crane faults (Test Mode)On March 29, 2017, a 9 tonne steel shield
block was transferred from the ARIEL Target
Pit and placed into a 
 history_201703311454.csvDataLogging_201703311520_Table.csvphoto_1.JPGphoto_2.JPG 
  31   Wednesday, April 12, 2017, 10:52 Jason KapalkaT-Hall CraneRepairARIEL Target Hall crane oil leaks & inspection planOn March 29, 2017, a 9 tonne load was transferred
in the ARIEL Target Hall with the overhead
crane (TRIUMF crane #44). On April 3, 2017,
 IMG_3111.JPGIMG_3112.JPGIMG_3113.JPGIMG_3114.JPGIMG_3115.JPG 
  32   Tuesday, April 18, 2017, 19:28 Jason KapalkaT-Hall CraneDevelopmentATH overhead crane fault investigationOn April 18, 2017, an investigation was initiated
to determine the cause of the ARIEL Target
Hall overhead crane faults that occurred
 8x 
  34   Tuesday, May 16, 2017, 17:30 Jason KapalkaT-Hall CraneDevelopmentARIEL Target Hall Overhead Crane MeasurementsOn May 5, 2017 the Beamlines and Remote Handling
groups recorded distances in the ARIEL Target
Hall from the Target Pit floor and B1 Target
 ARIEL_Target_Hall_Overhead_Crane_Measurements_(20170505).pdfEmail_-_Michael_Vogel_-_ARIEL_B1_&_Target_Pit_floor_heights_(20170519).pdf 
  38   Monday, July 17, 2017, 15:32 Jason KapalkaT-Hall CraneRepairTarget Hall Crane modifications and repairs    
  39   Friday, December 22, 2017, 12:42 Jason KapalkaT-Hall CraneStandard OperationPowered down ARIEL Target Hall Crane Powered down ARIEL Target Hall Crane
today by switching off main power switch
on B1 level in preparation for site-wide
  
  41   Tuesday, August 13, 2019, 11:43 Jason KapalkaT-Hall CraneDevelopmentInstalled surge protectorBackground: On 2019-06-25 a Pri VelFdbk Loss
fault was discovered on the Main Hoist East
Drum South Motor of the ARIEL Target Hall
 908355.pdf 
  2   Wednesday, November 19, 2014, 13:49 Isaac Earle100KW Beam DumpDevelopmentDecision on Modifications to Lower Center Block (TSH0225)I received a call today from Jim Adamson
at Kaltech regarding modifications to shielding
block TSH0225.
  
  3   Friday, November 21, 2014, 13:37 Isaac Earle100KW Beam DumpDevelopmentDestructive Testing of 1" MDC Ceramic BreaksTesting was performed on the ceramic water
breaks to be used on the beam dump water
hose assemblies.  The ceramic breaks
 Ceramic_Water_Break_Test_#1.docxCeramic_Water_Break_Test_#2.docxTest_#1_Broken_Sample.JPGTest_#2_Broken_Sample.JPG 
  4   Wednesday, November 26, 2014, 17:50 Isaac Earle100KW Beam DumpDevelopmentInstallation of Lower Center Block (TSH0461)Painting and relabeling of the modified
lower center block (TSH0461) was completed
on Monday Nov 24.  
 Beam_Dump_Lower_Center_Block_Alignment_-_Nov_25_2014_(from_Darren_Blom).txtIMG_1110.JPGIMG_1125.JPGIMG_4297.JPGIMG_4303.JPG 
  5   Wednesday, December 03, 2014, 10:16 Isaac Earle100KW Beam DumpDevelopmentInstallation of Lower Lead Block and Beam Dump InsertOn November 28th the lower lead shield
was installed with 3/8" shimming at
the front end, and 11/32" shimming at
  
  6   Wednesday, December 03, 2014, 10:36 Isaac Earle100KW Beam DumpDevelopmentUpper half of BD water blocks installed; Bypass loops installedOn December 2 the upper half of the RH
water blocks were installed (4 total) using
a 0.030" thick 6061-T6 Al shim torqued
 IMG_4381.JPG 
  7   Wednesday, December 03, 2014, 10:45 Isaac Earle100KW Beam DumpDevelopmentBD Signals Traced from Service Stand to Junction BoxOn Dec 2 the cables from the BD service
stand area to the junction box were traced
to establish which sensors correspond to
  
  8   Friday, December 05, 2014, 10:43 Isaac Earle100KW Beam DumpDevelopmentLower Lead Shield Drain Line InstalledA 1/8" SS tube was routed from the
Swagelok fitting on the front of the lower
lead shield to the service stand water catch
 IMG_4383.JPGIMG_4384.JPGIMG_4385.JPG 
  9   Tuesday, December 16, 2014, 16:36 Isaac Earle100KW Beam DumpDevelopmentUpper Pb Shield and Water Hoses Installed The upper lead shield was installed
this morning.  Also the water hoses
for lower lead shield, beam dump, and upper
 BD_Hose_Install_Notes.pdfIMG_4407.JPGIMG_4408.JPGIMG_4410.JPG 
  10   Friday, December 19, 2014, 14:05 Isaac Earle100KW Beam DumpDevelopmentBeam Dump & Lead Shielding Design Documentation As there likely won't be an opportunity
to properly document the design of the beam
dump insert and cooled lead shielding in
 Cooled_Lead_Shielding_Scanned_Design_Notes_(Isaac_Earle).pdf 
  11   Monday, December 22, 2014, 14:21 Isaac Earle100KW Beam DumpDevelopmentWater System Leak CheckedThis morning Bill Richert pressurized the
beam dump water cooling system with 30psi
air and held for 2 hours.  He reported
  