  ID Date Author Category Type Subjectdown Text Attachments
  4   Wednesday, November 26, 2014, 17:50 Isaac Earle100KW Beam DumpDevelopmentInstallation of Lower Center Block (TSH0461)Painting and relabeling of the modified
lower center block (TSH0461) was completed
on Monday Nov 24.  
 Beam_Dump_Lower_Center_Block_Alignment_-_Nov_25_2014_(from_Darren_Blom).txtIMG_1110.JPGIMG_1125.JPGIMG_4297.JPGIMG_4303.JPG 
  26   Tuesday, November 03, 2015, 13:15 Isaac Earle100KW Beam DumpDevelopmentInitial tests of beam dump water system controlsDuring the maintenance period today the
E-Hall tunnel was accessed to begin controls
tests on the beam dump water system and initial
  
  73   Thursday, November 28, 2024, 09:04 Adam NewsomeHot Cell 1RepairHot Cell turntables not rotating, access hatch not movingIt was reported that the hot cell turntables
would not rotate and the access hatch could
not be operated. The turntables' elevation
  
  46   Wednesday, September 15, 2021, 15:10 Adam NewsomeT-Hall CraneMaintenanceHoist Broken Fault (actually: cable wrap issue)A fault occurred which presented as "114.
Main Hoist Cable Broken (3200PX)". This
occurred when a SEG block was suspended approximately
  
  77   Thursday, December 12, 2024, 16:20 Aaron TamHot Cell 1DevelopmentExtraction Electrode Banana Plug (Show and Tell) December 12, 2024 - Chad
Fisher, Albert Kong, Aaron Tam, Austin Hagen
Tests:
 6x 
  15   Wednesday, May 06, 2015, 14:19 Isaac Earle100KW Beam DumpDevelopmentEHDT Beam Pipe Section Installed- On May 4th the EHDT beam pipe section
was installed by Mike Vogel of Beamlines
Group
 IMG_4922.JPGIMG_4924.JPGIMG_4925.JPG 
  24   Monday, June 15, 2015, 17:08 Isaac Earle100KW Beam DumpDevelopmentE-Dump Shielding Installation- The hoist rings were removed from the
upper lead shield
- Two standard lock-blocks were installed
  
  67   Tuesday, September 10, 2024, 12:52 Adam NewsomeT-Hall CraneStandard OperationDrive not ready faults observed on power-upUpon powering on the crane today and attempting
to use the main hoist, the following faults
were present:
  
  3   Friday, November 21, 2014, 13:37 Isaac Earle100KW Beam DumpDevelopmentDestructive Testing of 1" MDC Ceramic BreaksTesting was performed on the ceramic water
breaks to be used on the beam dump water
hose assemblies.  The ceramic breaks
 Ceramic_Water_Break_Test_#1.docxCeramic_Water_Break_Test_#2.docxTest_#1_Broken_Sample.JPGTest_#2_Broken_Sample.JPG 
  2   Wednesday, November 19, 2014, 13:49 Isaac Earle100KW Beam DumpDevelopmentDecision on Modifications to Lower Center Block (TSH0225)I received a call today from Jim Adamson
at Kaltech regarding modifications to shielding
block TSH0225.
  
  57   Friday, January 13, 2023, 13:57 Adam NewsomeT-Hall CraneRepairCrane light (west) not workingIt was observed today that the crane's
west light was not functioning. 
  
  60   Tuesday, March 21, 2023, 10:47 Adam NewsomeHot Cell 1RepairCircuit breaker replacement - telemanipulatorsThere was an issue with a 20 A circuit
breaker used to control motor assist functions
for the telemanipulators (specifically, the
  
  47   Thursday, September 16, 2021, 09:37 Adam NewsomeT-Hall CraneMaintenanceBridge Encoder HomingThe bridge motion was slowed due to encoder
homing issue. It is likely that the problem
which occurred yesterday caused an velocity
 PXL_20210916_161245978.jpgPXL_20210916_161205277.jpg 
  19   Tuesday, June 02, 2015, 16:42 Isaac Earle100KW Beam DumpDevelopmentBeam Dump Water Block RH Test & InstallationBeam dump waterblocks #1 (BD
Inlet) and #3 (Upper Pb Inlet) were removed
 BD_Water_Block_RH_Test_Procedure_-_June_2_2015.docx 
  20   Monday, June 08, 2015, 15:15 Isaac Earle100KW Beam DumpDevelopmentBeam Dump Vacuum Leak- On Thurdsay June 4th the EHDT beamline
section was vented by Vacuum Group so that
they could install a new pump
 BD_Flanges_and_Clamp_Jaws_Dimension_Check_-_Keith_Ng_-_June_5_2015.pdf 
  23   Friday, June 12, 2015, 10:16 Isaac Earle100KW Beam DumpDevelopmentBeam Dump Vac Seal Vent & Test- Vacuum has been pumping steadily on the
EHDT section since June 8, reaching 3.2E-8
Torr at 8am today (June 12)
  
  18   Thursday, May 28, 2015, 16:08 Isaac Earle100KW Beam DumpDevelopmentBeam Dump Vac Seal RH Test & InstallationThe following work was performed on
May 27 & 28, 2015:
- The beam dump 10kW Remote Handling
 BD_Vac_Flange_RH_Test_Procedure_-_June_2_2015.docx 
  21   Monday, June 08, 2015, 15:23 Isaac Earle100KW Beam DumpDevelopmentBeam Dump Seal Re-Install On Monday June 8 the following work
was performed by Isaac Earle and Keith Ng:
- EHDT beamline vented
  
  10   Friday, December 19, 2014, 14:05 Isaac Earle100KW Beam DumpDevelopmentBeam Dump & Lead Shielding Design Documentation As there likely won't be an opportunity
to properly document the design of the beam
dump insert and cooled lead shielding in
 Cooled_Lead_Shielding_Scanned_Design_Notes_(Isaac_Earle).pdf 
  33   Tuesday, May 02, 2017, 16:52 Isaac EarleBL4NDevelopmentBL4N 35-deg bender stand hardened parts tested Hardness testing was performed on
1 sample each of parts TBP1822 and TBP1823
(part of the 35-deg magnet stand assembly
  