Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ARIEL  Not logged in ELOG logo
Message ID: 67     Entry time: Tuesday, September 10, 2024, 12:52
Author: Adam Newsome 
Category: T-Hall Crane 
Type: Standard Operation 
Subject: Drive not ready faults observed on power-up 

Upon powering on the crane today and attempting to use the main hoist, the following faults were present:

1. Main Hoist East Drum North Motor Drive Fault (700VFD)
2. Main Hoist West Drum South Motor Drive Fault (900VFD)
3. Main Hoist East Drum North Motor Drive Not Ready (700VFD)

Note that the auxiliary hoists functioned as normal.

Upon power cycling the crane to reset, the faults disappeared, and the main hoist functioned normally again. The root cause of the issue is unknown. It is suspected to be related to either prolonged inactivity, improper safety reset sequence, or the battery being removed from the pendant. This issue will be monitored for re-occurrence.

ELOG V2.9.2-2455