62
|
Wednesday, April 26, 2023, 16:06 |
Adam Newsome | T-Hall Crane | Maintenance | Target Hall Crane - Hoist Wire Wrapping | It was observed recently that the main
hoist's wires seemed skewed, and there was
occasionally some noise heard when raising |
|
|
61
|
Tuesday, April 25, 2023, 12:28 |
Adam Newsome | T-Hall Crane | Standard Operation | ARIEL Target Hall Crane - Drives Fault | Today while operating the crane with load,
the crane stopped moving. Upon investigating,
all safety signals appeared to be OK. Fault |
|
|
60
|
Tuesday, March 21, 2023, 10:47 |
Adam Newsome | Hot Cell 1 | Repair | Circuit breaker replacement - telemanipulators | There was an issue with a 20 A circuit
breaker used to control motor assist functions
for the telemanipulators (specifically, the |
|
|
59
|
Thursday, March 16, 2023, 14:41 |
Adam Newsome | T-Hall Crane | Development | ARIEL Target Hall Crane - Spare Pendant Procured, Tested | A spare pendant for the overhead crane
was procured from COH. The pendant's functionality
is the same as the original one's. The pendant |
|
|
58
|
Friday, January 20, 2023, 14:48 |
Adam Newsome | T-Hall Crane | Standard Operation | Pendant/Receiver Communication Issue (Repeated) | An issue was observed in which the pendant
did not work to control the crane. This
is the second time in recent memory this |
|
|
57
|
Friday, January 13, 2023, 13:57 |
Adam Newsome | T-Hall Crane | Repair | Crane light (west) not working | It was observed today that the crane's
west light was not functioning. |
|
|
56
|
Tuesday, December 20, 2022, 10:03 |
Adam Newsome | T-Hall Crane | Standard Operation | Overhead crane powered off for the holidays | [edit 2023-01-03] The crane was powered
back on this morning - there do not appear
to be any faults on the HMI and it seems |
|
|
55
|
Wednesday, August 24, 2022, 13:47 |
Adam Newsome | T-Hall Crane | Standard Operation | Pendant/Receiver Communication Issue | In preparing to troubleshoot the issue
described in e-log #54, the crane was power
cycled, and the pendant battery removed, |
|
|
54
|
Tuesday, August 23, 2022, 10:32 |
Adam Newsome | T-Hall Crane | Maintenance | North Aux Hoist - reverse motion axes on E/W | Update 2022-10-06: During routine
inspection of the crane, Tom Kauss investigated
the direction swap issue. It was determined |
|
|
53
|
Monday, May 30, 2022, 12:58 |
Adam Newsome | T-Hall Crane | Development | Reversion of South position limit to OEM value | The position limit modification described
in e-log 49 has been reverted. Currently
the South soft limit is set back to 0.36m. |
|
|
52
|
Tuesday, March 15, 2022, 10:03 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist VFD Replaced | The North Aux Hoist VFD which had failed
(e-log 50) was replaced today by Tom Kauss
and Adam Newsome on Work Permit A2022-03-15-1. |
|
|
51
|
Friday, February 18, 2022, 09:26 |
Adam Newsome | T-Hall Crane | Maintenance | Potential grease leak observed | Naimat Khan noticed after using the crane
that some grease dropped onto a spreader
bar, and believes it is a leak from the main |
|
|
50
|
Tuesday, February 01, 2022, 08:29 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist - West Motion Failure | An issue was observed in which the North
Aux hoist failed to travel West when commanded
to, but the East motion was functioning. |
|
|
49
|
Thursday, January 06, 2022, 10:46 |
Adam Newsome | T-Hall Crane | Development | Modification of South Limits | Edit: as of May 30, 2022, the modification
has been reversed, and the crane is functioning
normally as per the manufacturer's limits. |
|
|
48
|
Tuesday, November 23, 2021, 11:01 |
Adam Newsome | T-Hall Crane | Repair | Load Cell - Not Functioning | The load cell which is located on the crane
itself to display the load to operators was
reported not working during the week of November |
|
|
47
|
Thursday, September 16, 2021, 09:37 |
Adam Newsome | T-Hall Crane | Maintenance | Bridge Encoder Homing | The bridge motion was slowed due to encoder
homing issue. It is likely that the problem
which occurred yesterday caused an velocity |
|
|
46
|
Wednesday, September 15, 2021, 15:10 |
Adam Newsome | T-Hall Crane | Maintenance | Hoist Broken Fault (actually: cable wrap issue) | A fault occurred which presented as "114.
Main Hoist Cable Broken (3200PX)". This
occurred when a SEG block was suspended approximately |
|
|
45
|
Wednesday, September 09, 2020, 10:51 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist Replacement (followup on E-Log 44) | See E-Log 44 for details on North Aux Hoist
failure.
A replacement VFD was ordered by |
|
|
44
|
Friday, July 03, 2020, 15:43 |
Adam Newsome | T-Hall Crane | Repair | North Aux Hoist: West Travel Motion Failure | An issue was observed in which the North
Aux hoist failed to travel West when commanded
to, but the East motion was functioning. |
|
|
43
|
Thursday, February 13, 2020, 08:51 |
Adam Newsome | T-Hall Crane | Standard Operation | Remote mode door limit switch bypass | The non-existent safety limit switch for
the target hall door which prevents remote
motion has been bypassed in the crane PLC |
|