Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Lab Maintenance, Page 4 of 4  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Statusdown Test Subject Text Attachments
  59   Thursday, July 11, 2024, 13:40 Aaron Schmidt  Q2 - 2024 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
 Q2_-2024_Ball_Mill_Calibration_&_inspection.jfifQ2_-_2024_Clean_up.jfif 
  60   Thursday, August 01, 2024, 15:01 Darwin Ortiz Rosales  EVAP1 and EVAP2 Inspection and MaintenanceThursday, August 01, 2024, 14:56
EVAP1:  Checked seal and no
visible deterioration was observed. 
  
  61   Thursday, August 01, 2024, 15:03 Darwin Ortiz Rosales   Ultrasonicator in Cold Lab:  The ultrasonicator
cooling lines and their operation was checked. 
The functionality of the probe and operation
  
  63   Thursday, November 21, 2024, 11:48 Aaron Schmidt  Change glove on Ar Glove box (2) Thursday, November 21, 2024, 11:46:
2 Glovebox gloves were changed. The far right
glove & the far left glove. 
  
ELOG V2.9.2-2455