Monday, April 15, 2024, 10:52, Aaron Schmidt, Fixed, , Ar Glove box RP swapped.
|
Monday, April 15, 2024, 10:50: The old IDP15 RP was not pumping the antechamber down properly. An exchange IDP15 pump is loaned to us from vacuum group. Once the tip seals on it are replaced, we will swap it again.
Applicable work permit: I2024-04-12--2. Status: Returned. |
Thursday, November 30, 2023, 10:03, Aaron Schmidt, Fixed, , Ar Glove box - Blower / solenoid fix
|
On November 10th / 11th a site wide power outage occured. Once power was restored, the Ar glove box had intermittent issues with the solenoids & blower. The blower did not start & the solenoids often got stuck or ceased operating.
Yesterday Randy B inspected the connections to see if they were receiving enough power. It was good from the main plug-in, through to the PLC, however was dead at fuse positions 3 & 4 on the rear panel. Both fuses were changed, but that did not help. We did some fidgeting in the back & the solenoid function returned. It was left overnight.
Thursday, November 30, 2023, 08:30: <- Approx. Initial check: Dropped a crumpled Kimwipe inside the glove box to check for air flow / blower function. It did not move. Blower was not functioning, but the solenoids did. De-energized the glove box completely.
Removed the old corroded fuse holders, added a pair of modified new ones. Cleaned a couple of corroded critical connections. Installed the new fuses, re-plugged it back in. Function returned to normal. The Kimwipe was also moving, verifying the blower is again operational.
Thursday, November 30, 2023, 09:51: Complete. |
Wednesday, March 30, 2011, 16:47, John Wong, , , All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down
|
All the fumehood pumps in the ISAC-I hot and cold labs got tripped off when the MCC-X was powered down (See ISAC WP#2011-03-30-5). No reaction process is done inside the fumehoods, so the pumps are ok to be left off for now until the MCC-X work is done. |
Tuesday, April 12, 2011, 12:07, John Wong, , , All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down
|
John Wong wrote: |
All the fumehood pumps in the ISAC-I hot and cold labs got tripped off when the MCC-X was powered down (See ISAC WP#2011-03-30-5). No reaction process is done inside the fumehoods, so the pumps are ok to be left off for now until the MCC-X work is done.
|
On 3/31/2011 2:01 PM, Jonathan Aoki wrote:
> Razvan and I took a closer look. We found that power to the fumehoods
> likely was not lost (they are fed from a different panel), but that EF14
> and EF15 would have tripped off. These two fans serve the room 06 and 07
> fumehoods.
>
> This is an oversight on my part and I apologize for any inconvenience --
> EF14 and 15 are clearly stated on P-370's directory. I hope that no
> damage was done.
>
> I will leave it to your discretion, but this (in my opinion) is worthy of
> an NCR. I've updated my planned power outage notes. This should not
> happen again.
>
> Jon
>
>
>> Thank Jon.
>>
>> Pierre
>>
>> Le 2011-03-31 à 13:37, "Jonathan Aoki"<jonaoki@triumf.ca> a écrit :
>>
>>> Razvan& Franco,
>>>
>>> Yesterday, during the MCC-X power down there was one unexpected event --
>>> the fumehoods in Marik's cold/hot labs tripped off.
>>>
>>> According to the documentation that I have, the following panels were to
>>> be affected:
>>> P-370
>>> P-378
>>> P-384
>>> P-396
>>> P-418
>>>
>>> I have print-outs of all of the circuit directories and I don't see any
>>> mention of the fumehood fans.
>>>
>>> Can you please trace the fans' electrical feed and let me know so that I
>>> can update our directories?
>>>
>>> Thanks,
>>> Jon
>>>
>>
> |
Tuesday, January 23, 2018, 11:58, Laura Lambert, , , All BeO removed from Labs!
|
Tuesday, January 23, 2018, 11:55
Portable glove box with everything inside, contaminated beakers, pellets and BeO dissolved in acid were all removed from the cold lab today!!!
Transported for waste removal.
|
Thursday, March 20, 2025, 13:50, Keyur Chauhan, , , Actinide Mass Balance Calibration ISAC-I B1 Hot Lab
|
ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on March 11, 2025, at 2:00 p.m. with an accuracy of 0.02%. |
Wednesday, March 27, 2024, 13:42, Keyur Chauhan, , , Actinide Mass Balance Calibration ISAC-I B1 Hot Lab
|
ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on March 27, 2024, at 11:10 a.m. with an accuracy of 0.00%. |
Tuesday, April 18, 2023, 17:40, Keyur Chauhan, Fixed, 1, Actinide Mass Balance Calibration
|
ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on April 18, 2023, at 10:40 a.m. with an accuracy of 0.01%. |
Wednesday, November 26, 2014, 14:01, Laura Lambert, , ,
|
|
Thursday, August 01, 2024, 15:03, Darwin Ortiz Rosales, , ,
|
Ultrasonicator in Cold Lab: The ultrasonicator cooling lines and their operation was checked. The functionality of the probe and operation software was checked. Visual inspection of probes and water receptacle showed good operational condition. |
|