3
|
Tuesday, April 12, 2011, 12:07 |
John Wong | | | All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down |
John Wong wrote: |
All the fumehood pumps in the ISAC-I hot and cold labs got tripped off when the MCC-X was powered down (See ISAC WP#2011-03-30-5). No reaction process is done inside the fumehoods, so the pumps are ok to be left off for now until the MCC-X work is done.
|
On 3/31/2011 2:01 PM, Jonathan Aoki wrote:
> Razvan and I took a closer look. We found that power to the fumehoods
> likely was not lost (they are fed from a different panel), but that EF14
> and EF15 would have tripped off. These two fans serve the room 06 and 07
> fumehoods.
>
> This is an oversight on my part and I apologize for any inconvenience --
> EF14 and 15 are clearly stated on P-370's directory. I hope that no
> damage was done.
>
> I will leave it to your discretion, but this (in my opinion) is worthy of
> an NCR. I've updated my planned power outage notes. This should not
> happen again.
>
> Jon
>
>
>> Thank Jon.
>>
>> Pierre
>>
>> Le 2011-03-31 à 13:37, "Jonathan Aoki"<jonaoki@triumf.ca> a écrit :
>>
>>> Razvan& Franco,
>>>
>>> Yesterday, during the MCC-X power down there was one unexpected event --
>>> the fumehoods in Marik's cold/hot labs tripped off.
>>>
>>> According to the documentation that I have, the following panels were to
>>> be affected:
>>> P-370
>>> P-378
>>> P-384
>>> P-396
>>> P-418
>>>
>>> I have print-outs of all of the circuit directories and I don't see any
>>> mention of the fumehood fans.
>>>
>>> Can you please trace the fans' electrical feed and let me know so that I
>>> can update our directories?
>>>
>>> Thanks,
>>> Jon
>>>
>>
> |
|
20
|
Tuesday, January 23, 2018, 11:58 |
Laura Lambert | | | All BeO removed from Labs! |
Tuesday, January 23, 2018, 11:55
Portable glove box with everything inside, contaminated beakers, pellets and BeO dissolved in acid were all removed from the cold lab today!!!
Transported for waste removal.
|
|
67
|
Thursday, March 20, 2025, 13:50 |
Keyur Chauhan | | | Actinide Mass Balance Calibration ISAC-I B1 Hot Lab |
ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on March 11, 2025, at 2:00 p.m. with an accuracy of 0.02%. |
Attachment 1: Actinide_Mass_Balance_-_11_Mar_2025.pdf
|
|
|
56
|
Wednesday, March 27, 2024, 13:42 |
Keyur Chauhan | | | Actinide Mass Balance Calibration ISAC-I B1 Hot Lab |
ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on March 27, 2024, at 11:10 a.m. with an accuracy of 0.00%. |
Attachment 1: Actinide_Mass_Balance_-_27_Mar_2024.pdf
|
|
|
46
|
Tuesday, April 18, 2023, 17:40 |
Keyur Chauhan | Fixed | 1 | Actinide Mass Balance Calibration |
ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on April 18, 2023, at 10:40 a.m. with an accuracy of 0.01%. |
Attachment 1: Actinide_Mass_Balance_-_18_Apr_2023.pdf
|
|
|
14
|
Wednesday, November 26, 2014, 14:01 |
Laura Lambert | | | |
|
|
61
|
Thursday, August 01, 2024, 15:03 |
Darwin Ortiz Rosales | | | |
Ultrasonicator in Cold Lab: The ultrasonicator cooling lines and their operation was checked. The functionality of the probe and operation software was checked. Visual inspection of probes and water receptacle showed good operational condition. |