  56   Wednesday, March 27, 2024, 13:42 Keyur Chauhan  Actinide Mass Balance Calibration ISAC-I B1 Hot Lab

 ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on March 27, 2024, at 11:10 a.m. with an accuracy of 0.00%.

Attachment 1: Actinide_Mass_Balance_-_27_Mar_2024.pdf
Actinide_Mass_Balance_-_27_Mar_2024.pdf
  46   Tuesday, April 18, 2023, 17:40 Keyur ChauhanFixed1Actinide Mass Balance Calibration

ISAC-1 B1 Hot Lab actinide mass balance calibration was carried out on April 18, 2023, at 10:40 a.m. with an accuracy of 0.01%.

Attachment 1: Actinide_Mass_Balance_-_18_Apr_2023.pdf
Actinide_Mass_Balance_-_18_Apr_2023.pdf
  14   Wednesday, November 26, 2014, 14:01 Laura Lambert   
  61   Thursday, August 01, 2024, 15:03 Darwin Ortiz Rosales   

Ultrasonicator in Cold Lab:  The ultrasonicator cooling lines and their operation was checked.  The functionality of the probe and operation software was checked.  Visual inspection of probes and water receptacle showed good operational condition. 