Entry  Friday, February 09, 2024, 11:01, Aaron Schmidt, , , Laser cutter inspection 
 Friday, February 09, 2024, 11:01: Epilog laser cutter operates. OK
Entry  Wednesday, March 27, 2024, 13:42, Keyur Chauhan, , , Actinide Mass Balance Calibration ISAC-I B1 Hot Lab Actinide_Mass_Balance_-_27_Mar_2024.pdf
 ISAC-1 B1 Hot Lab actinide mass balance calibration was carried
out on March 27, 2024, at 11:10 a.m. with an accuracy of 0.00%.
Entry  Thursday, July 11, 2024, 13:40, Aaron Schmidt, , , Q2 - 2024 Ball Mill Calibration & Inspection  Q2_-2024_Ball_Mill_Calibration_&_inspection.jfifQ2_-_2024_Clean_up.jfif
Fritsch Pulverisette 5 Ball Mill status:
Thursday, July 11, 2024, 13:39:
SN 05.6010 / 03005: Inspected. Ok. Was dirty inside. Cleaned.
Entry  Thursday, August 01, 2024, 15:01, Darwin Ortiz Rosales, , , EVAP1 and EVAP2 Inspection and Maintenance 
Thursday, August 01, 2024, 14:56
EVAP1:  Checked seal and no visible deterioration was observed.  Oil level in roughing pump was good.  Circulated argon to observe
functionality of the gloves and to check appropriate gas flow. 
Entry  Thursday, August 01, 2024, 15:03, Darwin Ortiz Rosales, , ,  
Ultrasonicator in Cold Lab:  The ultrasonicator cooling lines and their operation was checked.  The functionality of the probe and operation
software was checked.  Visual inspection of probes and water receptacle showed good operational condition.  
Entry  Thursday, November 21, 2024, 11:48, Aaron Schmidt, , , Change glove on Ar Glove box (2) 
 Thursday, November 21, 2024, 11:46: 2 Glovebox gloves were changed. The far right glove & the far left glove. 
No contamination was found on the sealing edges of the glove box. Both old gloves were placed in bags & placed in the alpha waste bin.
Work Permit: 
Entry  Friday, February 14, 2025, 14:17, Aaron Schmidt, , , Laser Cutter Inspection. 
Friday, February 14, 2025, 14:16: Epilog laser cutter operates. OK.
Blower, red dot, adjustments settings ok. Laser used to cut Ta foil. OK.
Entry  Thursday, March 20, 2025, 13:50, Keyur Chauhan, , , Actinide Mass Balance Calibration ISAC-I B1 Hot Lab  Actinide_Mass_Balance_-_11_Mar_2025.pdf
 ISAC-1 B1 Hot Lab actinide mass balance calibration was carried
out on March 11, 2025, at 2:00 p.m. with an accuracy of 0.02%.