Friday, May 13, 2011, 11:59, John Wong, Fixed, , Uranium Waste Container Removed from Hotlab
|
Fri May 13 11:55:37 2011: The contain in the uranium waste container was removed and transferred into a beaker and sealed. The total waste
mass = 12.59g, over 100K CPM. The container is double bagged and will be removed from the Hotlab. |
Wednesday, April 13, 2011, 13:54, John Wong, , , Cloth booties now avaiable for hotlab
|
Wed Apr 13 13:53:46 2011
I've setup a box of cloth booties for entering the hotlab. They are
washable so please use them. I also have some paper booties there if
you
like using them, but it can be costly to keep stocking them up, plus the
fee to throw them away.
As per RPG, before you exit the hotlab please |
Wednesday, March 30, 2011, 16:47, John Wong, , , All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down
|
All the fumehood pumps in the ISAC-I hot and cold labs got tripped off when the MCC-X was powered down (See ISAC WP#2011-03-30-5). No reaction
process is done inside the fumehoods, so the pumps are ok to be left off for now until the MCC-X work is done. |
Tuesday, April 12, 2011, 12:07, John Wong, , , All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down
|
John Wong wrote:
All the fumehood pumps in the ISAC-I hot and cold labs got tripped off when the MCC-X was powered down (See ISAC WP#2011-03-30-5). |
Tuesday, April 12, 2011, 12:03, John Wong, , , Hot Lab Glove Box Regeneration
|
Tue Apr 12 12:00:52 2011: The hot lab glove box regeneration was started yesterday (April 11, 2011). "Before regeneration, the O2 level
was 97 ppm, The H2O level was 47 ppm. After restarting circulation through the dry train, the levels immediately started dropping. At 11:30 today,
the O2 was @ 1.76 ppm, the H2O @ 11.2 ppm." (Marik). |
|