Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 9 of 34  Not logged in ELOG logo
  ID Date Author Target Materialdown Target Oven W.O# Source Status Subject Text Attachments
  405   Thursday, April 19, 2018, 12:38 Laura LambertTa41177-3LP-SISDoneRound 2. Temp measurements for Aurelia target Ta#56 Thursday, April 19, 2018, 12:37
See elog i.d. 404 for target description
and first round of heating.
  
  412   Thursday, June 21, 2018, 11:38 Aaron SchmidtTa42218-9HP-SISDoneConditioning Ta#56 Ta#56 HP-SIS target description:
 Ta#56_Evap_2_Conditioning.docx 
  440   Tuesday, April 23, 2019, 13:55 Aaron SchmidtTa43044-4LP-SISIn progressConditioning Ta#58Ta#58 LP-SIS  Ta#58_Loading_data.pdfTa#58_Evap_2_Conditioning..docx 
  457   Monday, September 16, 2019, 14:50 Aaron SchmidtTa44062-5LP-SISIn progressConditioning Ta#59 Ta#59 LP-SIS  Ta#59_Evap_2_Conditioning..docx 
  486   Monday, June 01, 2020, 12:03 Aaron SchmidtTa44139-13LP-SISIn progressTa#60 Conditioning Ta#60 LP-SIS target
description:
  
  513   Tuesday, October 06, 2020, 14:23 Aaron SchmidtTa44508-1LP-SISIn progressConditioning Ta#61Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs
  
  546   Thursday, April 08, 2021, 08:25 Aaron SchmidtTa44139-10LP-SISIn progressConditioning Ta#62 & Flex - line HS installed Ta#62 LP-SIS target
description:
  
  548   Thursday, April 15, 2021, 18:33 Marla CervantesTa44139-6-SKTARGET BOATDoneCarbon penetration on TaThursday, April 15, 2021, 18:24
Tantalum samples were loaded in a
tantalum testing tube and installed in the
 Ta-samples_heating.JPG 
  551   Wednesday, June 23, 2021, 17:48 Aaron SchmidtTa44691-4LP-SISIn progressConditioning Ta#62 (Replacement) Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10)
 Ta#62_conditioning_-_Evap_2_-_44691-4.docx 
  560   Wednesday, October 27, 2021, 11:09 Darwin Ortiz RosalesTa44691-3LP-SISDoneTaC coating/sintering Wednesday, October 27, 2021, 11:07
Monday, October 25, 2021, 11:52
  
  564   Wednesday, November 10, 2021, 18:07 Aaron SchmidtTa44691-11LP-SISIn progressConditioning Ta#63Ta#63 LP-SIS target description: 
  
  577   Thursday, June 02, 2022, 16:53 Aaron SchmidtTa44691-12LP-SISIn progressConditioning Ta#64 Ta#64 LP-SIS target
description: 
  
  580   Thursday, June 09, 2022, 09:09 Darwin Ortiz RosalesTa HP-FEBIADDoneTroubleshootingThursday, June 09, 2022, 09:07
Yesterday, Wednesday June 08, 2022
@ ~3.00 pm a "dummy" target container
 MicrosoftTeams-image_(3).pngMicrosoftTeams-image_(4).pngMicrosoftTeams-image_(5).png 
  582   Tuesday, June 14, 2022, 09:04 Darwin Ortiz RosalesTa37978-1HP-FEBIADDoneTaC coating sinteringTuesday, June 14, 2022, 08:47
Ta HP-FEBIAD was coated
  
  610   Tuesday, February 28, 2023, 07:21 Darwin Ortiz RosalesTa44692-7LP-FEBIADDoneTaC coating sinteringTuesday, February 28, 2023, 07:19
Ta LP-FEBIAD was coated
  
  611   Wednesday, March 01, 2023, 21:49 Darwin Ortiz RosalesTa44692-3HP-SISDoneTaC coating sinteringWednesday, March 01, 2023, 21:46
Ta HP-SIS was coated
  
  615   Sunday, March 12, 2023, 08:06 Darwin Ortiz RosalesTa44692-2HP-SISDoneTaC coating sinteringSunday, March 12, 2023, 08:04
Ta HP-SIS was coated
  
  618   Thursday, March 30, 2023, 12:45 Aaron SchmidtTa45220-7LP-SISIn progressConditioning Ta#65Thursday, March 30, 2023, 12:27: 
Ta#65 LP-SIS target description: 
  
  646   Wednesday, September 20, 2023, 14:26 Aaron SchmidtTa45220-5LP-SISIn progressConditioning Ta#66 Ta#66 LP-SIS   
  647   Thursday, October 05, 2023, 12:47 Aaron SchmidtTa45220-3LP-SISIn progressConditioning Ta#68 (Spare)Ta#(Spare) LP-SIS   
ELOG V2.9.2-2455